Dam Search Results
- Dimensions
- Height: 22 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Lur Berria | France | F | Nivelle | 4 | - /06 | - /07 | - /07 | - /08 | 22 | 168 | 190 | |||||||||||||
| Sidi el Mahjoub | Morocco | Ifrane | 1 | - /06 | - /07 | - /08 | - /09 | 22 | 15 | 18 | V | (5) | 1.00 | (1)* | 1.00 | (1)* | ||||||||
| Deep Creek Nº5D | USA | F W | Deep Creek | 15 | 12/08 | 04/09 | 12/09 | 07/10 | 22 | 226 | 39 | 45 | V | (3') | 0.80 | (3')* | 0.80 | (1)* | 300 | 300 | 89 | 89 | (F) | |
| Moínho | Brazil | H | Bernado Jose | 1 | - /09 | - /10 | - /11 | - /11 | 22 | 9 | 25 | 68 | 17 | (N) | ||||||||||
| Göle Durançam | Turkey | I | Kür Çayı | 37 | - /16 | - /19 | - /23 | - /24 | 22 | 107 | 22 | V | 0.70 | |||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: France
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Nivelle
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: -/08
Specifications
Height: 22 metres
Length: 168 metres
Volume of RCC: -
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): unknown
River: Ifrane
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 22 metres
Length: -
Volume of RCC: 15 m3x103
Total volume: 18 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Deep Creek
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: 12/09
End of Project: 07/10
Specifications
Height: 22 metres
Length: 226 metres
Volume of RCC: 39 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Bernado Jose
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/11
Specifications
Height: 22 metres
Length: -
Volume of RCC: 9 m3x103
Total volume: 25 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 68 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 17 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Kür Çayı
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 22 metres
Length: 107 metres
Volume of RCC: 22 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.70 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates
