Dam Search Results
- Owner: Direction des Aménagements Hydrauliques
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Ain al Koreima | Morocco | Direction des Aménagements Hydrauliques | I | Akrech | 1 | 06/87 | 09/87 | 02/88 | 03/88 | 26 | 124 | 17 | 20 | 0.20 | (5)* | 0.20 0.75 | (5) (17) | 0.60 | (1)* | 350 | 350 | 70 140 | 30 60 | (S) |
| Rouidat Amont (formerly Rwedat) [H-F] | Morocco | Direction des Aménagements Hydrauliques | I W | Rouidat | 3 | 05/87 | 09/87 | 10/88 | 12/88 | 24 | 125 | 25 | 27 | 0.40 | (7)* | 0.40 | (7)* | 0.40 | (1)* | 400 | 400 | 100 | 15 | (N) |
| Aoulouz | Morocco | Direction des Aménagements Hydrauliques | F G I | Souss | 110 | 03/88 | 11/89 | 09/90 | 11/91 | 79 | 476 | 680 | 850 | V | (1) | 0.85 | (1)* | 0.85 | (1) | 500 | 500 | 84 63 | 36 27 | (M) |
| Joumoua | Morocco | Direction des Aménagements Hydrauliques | W | Joumoua | 7 | 07/89 | 06/90 | 11/92 | 12/92 | 57 | 250 | 150 | 200 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 350 | 350 | 105 180 | 45 0 | (-) |
| Imi el Kheng | Morocco | Direction des Aménagements Hydrauliques | G I | Berhil | 12 | 04/92 | 09/92 | 07/93 | 04/94 | 39 | 170 | 97 | 109 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 110 | 20 20 | (N) |
| Sahla | Morocco | Direction des Aménagements Hydrauliques | I W | Sahla | 62 | 05/92 | 11/92 | 12/93 | 07/94 | 55 | 160 | 130 | 160 | 0.20 | (5) | 0.90 | (1)* | 0.80 | (1)* | 300 | 300 | 85 125 | 15 25 | (N) |
| Enjil | Morocco | Direction des Aménagements Hydrauliques | I W | Taghoucht | 12 | 11/93 | 03/94 | 10/95 | 03/96 | 36 | 80 | 45 | 57 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 110 150 | 0 0 | (N) |
| Bab Louta | Morocco | Direction des Aménagements Hydrauliques | W | Bous Sbaa | 37 | 01/97 | 02/98 | 02/99 | 03/99 | 55 | 110 | 63 | 77 | V | (5) | 0.75 | (1)* | 0.75 | (13) | 300 | 300 | 65 80 | 15 20 | (N) |
| Ahl Souss (formely Ait M’Zal) | Morocco | Direction des Aménagements Hydrauliques | I W | Izig | 5 | 11/01 | 01/03 | 05/03 | 01/04 | 49 | 222 | 50 | 27 | 0.20 | (1) | 0.80 | (1)* | 0.85 | (12) | 300 | 300 | 80 100 | 0 0 | (-) |
| Tamesna (formerly Boukerkour) | Morocco | Direction des Aménagements Hydrauliques | F I W | Zamrine | 56 | 05/03 | 04/04 | 09/04 | 05/05 | 69 | 220 | 190 | 215 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 | 0 | (N) |
| Hassan II (formerly Sidi Said) | Morocco | Direction des Aménagements Hydrauliques | F I W | Moulouya | 400 | 02/01 | 03/03 | 04/05 | 03/06 | 115 | 577 | 590 | 690 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 80 | 15 20 | (N) |
| Tanger-Med (formerly R’Mel) | Morocco | Direction des Aménagements Hydrauliques | F W | R’Mel | 25 | 05/05 | 06/06 | 06/07 | 10/07 | 80 | 250 | 230 | 243 | V | (11) | 0.75 | (1)* | 0.75 | (1) | 300 | 3000 | 100 90 | 0 0 | (-) |
| Yacoub El Mansour (formerly Ouirgane) | Morocco | Direction des Aménagements Hydrauliques | W | N’Fis | 70 | 07/05 | 10/06 | 07/07 | 03/08 | 71 | 233 | 202 | 216 | V | (11) | 0.75 | (1)* | 0.75 | (1)* | 300 | 3000 | 100 | 0 | (-) |
| Sidi Yahya (formerly Ain Kwachia) | Morocco | Direction des Aménagements Hydrauliques | I W | Khellata | 11 | 01/07 | 05/07 | 07/08 | 11/08 | 30 | 213 | 60 | 78 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 105 | 0 | (-) |
| Sidi el Mahjoub | Morocco | Direction des Aménagements Hydrauliques | Ifrane | 1 | - /06 | - /07 | - /08 | - /09 | 22 | 15 | 18 | V | (5) | 1.00 | (1)* | 1.00 | (1)* | |||||||
| Sehb el Merga | Morocco | Direction des Aménagements Hydrauliques | F I W | Sehb el Merga | 7 | 06/07 | - /08 | - /09 | - /10 | 37 | 480 | 85 | 95 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 | 25 | (N) |
| Abou Abbas Al-Sabti (formerly Taskourt) | Morocco | Direction des Aménagements Hydrauliques | I W | Al Mal | 25 | 01/08 | 04/09 | 09/10 | 04/11 | 75 | 408 | 415 | 490 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 73 | 32 | (N) |
| Sfeissif | Morocco | Direction des Aménagements Hydrauliques | Safsaf | 20 | - /08 | - /09 | - /10 | - /11 | 29 | V | (5) | 0.85 | (1)* | 0.85 | (1)* | 300 | 300 | 120 | 0 | (-) | ||||
| Ait Moulay Ahmed | Morocco | Direction des Aménagements Hydrauliques | I W | Ain Leuh | 2 | 10/09 | - /10 | 01/11 | 10/11 | 29 | 136 | 18 | 20 | V | (5) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 70 | 30 | (N) |
| El Maleh Amont | Morocco | Direction des Aménagements Hydrauliques | F | Maleh | 35 | 01/07 | 09/07 | 06/11 | 10/12 | 49 | 174 | 100 | 140 | 0.20 | (5) | 0.60 | (5) | 0.60 | (5) | 300 | 300 | 120 | 0 | (-) |
| Ahl Lafouim | Morocco | Direction des Aménagements Hydrauliques | W | Ahl Lafouim | 3 | - /09 | - /10 | - /11 | - /12 | 15 | 95 | 20 | 24 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | |||||
| Krayma | Morocco | Direction des Aménagements Hydrauliques | W | Tiyoughza | 3 | - /09 | - /10 | - /11 | - /12 | 32 | 170 | 45 | 53 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 120 100 | 0 | (-) | ||
| Sultan Moulay Ali Cherif (formely Tiouine) | Morocco | Direction des Aménagements Hydrauliques | F I W | Iriri | 270 | 05/10 | - /11 | - /13 | - /13 | 90 | 202 | 270 | 380 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 100 | 0 | (-) | ||
| Tamellast | Morocco | Direction des Aménagements Hydrauliques | 1 | - /11 | - /12 | - /13 | - /14 | 19 | 27 | V | (5) | 1.00 | (1)* | 1.00 | (1)* | |||||||||
| Imin Tlit | Morocco | Direction des Aménagements Hydrauliques | Tlit | - /13 | - /14 | - /14 | - /15 | 18 | ||||||||||||||||
| Rkiza | Morocco | Direction des Aménagements Hydrauliques | F I W | Rkiza | 17 | - /12 | - /13 | - /15 | - /15 | 26 | 500 | 55 | 60 | V | (5) | 0.85 | (1)* | 0.85 | (1)* | |||||
| Tamalout [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Ansegmir | 50 | 10/10 | - /13 | - /17 | - /18 | 61 | 320 | 380 | 405 | 0.50 | (5) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 80 70 60 | 0 0 | (-) |
| Ouljet Es Soltane [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Beht | 510 | 05/10 | - /14 | - /17 | - /18 | 98 | 383 | 900 | 930 | 0.50 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 55 | 25 | (N) |
| Ouagjdit | Morocco | Direction des Aménagements Hydrauliques | I W | Asif N Talaght | 1 | - /13 | - /15 | - /17 | - /18 | 44 | ||||||||||||||
| Timkit [H-F] | Morocco | Direction des Aménagements Hydrauliques | G I | Ifegh | 14 | - /10 | - /15 | - /18 | - /19 | 56 | 183 | 124 | 146 | 0.65 | (5) | 0.65 | (1)* | 0.65 | (1)* | 300 | 300 | 56 | 24 | (N) |
| Sidi Abdellah [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Ouaar | 10 | 04/10 | - /13 | - /20 | - /20 | 68 | 370 | 580 | 610 | 0.50 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 80 100 | 0 0 | (-) |
| Agdez | Morocco | Direction des Aménagements Hydrauliques | F I W | Daraa | 247 | 05/16 | 03/19 | 09/21 | 06/22 | 110 | 317 | 833 | 993 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | (N) | ||||
| Kaddoussa | Morocco | Direction des Aménagements Hydrauliques | F I W | Guir | 220 | - /16 | - /18 | - /21 | - /21 | 62 | 271 | 180 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | (N) | ||
| Tiddas | Morocco | Direction des Aménagements Hydrauliques | F I W | Bou Regreg | 507 | - /16 | - /18 | - /21 | - /22 | 106 | 345 | 900 | 1 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | |||
| Toudgha | Morocco | Direction des Aménagements Hydrauliques | F I W | Toudgha | 33 | 11/17 | - /19 | - /21 | - /22 | 68 | V | (1) | 0.90 | (1)* | 0.90 | (1)* | ||||||||
| Fask | Morocco | Direction des Aménagements Hydrauliques | F I W | Assayad | 79 | 07/17 | 01/19 | 12/22 | 07/23 | 77 | 830 | 1400 | 0.10 | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | (N) | |||
| Sidi Abbou | Morocco | Direction des Aménagements Hydrauliques | F H I W | Leben | 200 | 03/21 | 01/23 | 06/24 | - /25 | 71 | 149 | 207 | 257 | V | (1) | 0.90 | (1)* | 0.90 | (1) | 300 | 300 | 110 | 0 | |
| Beni Azimane [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Kert | 44 | 01/22 | 10/22 | 01/26 | 10/26 | 70 | 684 | 800 | 0.50 | (1)* | 0.90 | (1)* | 0.90 | (1)* | 300 | 300 | 100 | 0 | ||
| Kheng Grou | Morocco | Direction des Aménagements Hydrauliques | F I W | Kheng Grou | 1070 | 04/22 | 01/24 | 08/26 | - /26 | 79 | 196 | 550 | 55 | 0.20 | (5) | 1.00 | (5) | 1.00 | (13) | 300 | 3000 | |||
| Taghzirt | Morocco | Direction des Aménagements Hydrauliques | H I | Derna | 85 | - /22 | - /24 | - /26 | - /27 | 95 | ||||||||||||||
| Oued Lakhdar | Morocco | Direction des Aménagements Hydrauliques | F H I W | Lakhdar | 150 | - /23 | - /25 | - /27 | - /27 | 110 | ||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation
River: Akrech
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/87
Start of RCC: 06/87
End of RCC: 02/88
End of Project: 03/88
Specifications
Height: 26 metres
Length: 124 metres
Volume of RCC: 17 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
| 0.75 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 350 | 350 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 140 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Ground-granulated blast-furnace slag |
| 60 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Rouidat
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/87
Start of RCC: 05/87
End of RCC: 10/88
End of Project: 12/88
Specifications
Height: 24 metres
Length: 125 metres
Volume of RCC: 25 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | RCC against precast concrete panels [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.40 | RCC against precast concrete panels [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.40 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Groundwater Recharge / Irrigation
River: Souss
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 03/88
Start of RCC: 03/88
End of RCC: 09/90
End of Project: 11/91
Specifications
Height: 79 metres
Length: 476 metres
Volume of RCC: 680 m3x103
Total volume: 850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 63 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Milled sand |
| 27 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Joumoua
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/89
Start of RCC: 07/89
End of RCC: 11/92
End of Project: 12/92
Specifications
Height: 57 metres
Length: 250 metres
Volume of RCC: 150 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 350 | 350 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| 180 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | No pozzolan used |
| 0 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation
River: Berhil
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 04/92
Start of RCC: 04/92
End of RCC: 07/93
End of Project: 04/94
Specifications
Height: 39 metres
Length: 170 metres
Volume of RCC: 97 m3x103
Total volume: 109 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |
| 20 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sahla
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 05/92
Start of RCC: 05/92
End of RCC: 12/93
End of Project: 07/94
Specifications
Height: 55 metres
Length: 160 metres
Volume of RCC: 130 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 25 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Taghoucht
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 11/93
Start of RCC: 11/93
End of RCC: 10/95
End of Project: 03/96
Specifications
Height: 36 metres
Length: 80 metres
Volume of RCC: 45 m3x103
Total volume: 57 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 150 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |
| 0 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Bous Sbaa
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 01/97
Start of RCC: 01/97
End of RCC: 02/99
End of Project: 03/99
Specifications
Height: 55 metres
Length: 110 metres
Volume of RCC: 63 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 20 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Izig
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 11/01
Start of RCC: 11/01
End of RCC: 05/03
End of Project: 01/04
Specifications
Height: 49 metres
Length: 222 metres
Volume of RCC: 50 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Zamrine
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/03
Start of RCC: 05/03
End of RCC: 09/04
End of Project: 05/05
Specifications
Height: 69 metres
Length: 220 metres
Volume of RCC: 190 m3x103
Total volume: 215 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Moulouya
Reservoir capacity: 400 m3x106
Construction Dates
Start of Project: 02/01
Start of RCC: 02/01
End of RCC: 04/05
End of Project: 03/06
Specifications
Height: 115 metres
Length: 577 metres
Volume of RCC: 590 m3x103
Total volume: 690 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 20 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: R’Mel
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: 06/07
End of Project: 10/07
Specifications
Height: 80 metres
Length: 250 metres
Volume of RCC: 230 m3x103
Total volume: 243 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: N’Fis
Reservoir capacity: 70 m3x106
Construction Dates
Start of Project: 07/05
Start of RCC: 07/05
End of RCC: 07/07
End of Project: 03/08
Specifications
Height: 71 metres
Length: 233 metres
Volume of RCC: 202 m3x103
Total volume: 216 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Khellata
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 07/08
End of Project: 11/08
Specifications
Height: 30 metres
Length: 213 metres
Volume of RCC: 60 m3x103
Total volume: 78 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): unknown
River: Ifrane
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 22 metres
Length: -
Volume of RCC: 15 m3x103
Total volume: 18 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sehb el Merga
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 37 metres
Length: 480 metres
Volume of RCC: 85 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Al Mal
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 01/08
Start of RCC: 01/08
End of RCC: 09/10
End of Project: 04/11
Specifications
Height: 75 metres
Length: 408 metres
Volume of RCC: 415 m3x103
Total volume: 490 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 32 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): unknown
River: Safsaf
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 29 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ain Leuh
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 10/09
Start of RCC: 10/09
End of RCC: 01/11
End of Project: 10/11
Specifications
Height: 29 metres
Length: 136 metres
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control
River: Maleh
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 06/11
End of Project: 10/12
Specifications
Height: 49 metres
Length: 174 metres
Volume of RCC: 100 m3x103
Total volume: 140 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against precast concrete panels |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Ahl Lafouim
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 15 metres
Length: 95 metres
Volume of RCC: 20 m3x103
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Tiyoughza
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 32 metres
Length: 170 metres
Volume of RCC: 45 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Iriri
Reservoir capacity: 270 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: -/13
End of Project: -/13
Specifications
Height: 90 metres
Length: 202 metres
Volume of RCC: 270 m3x103
Total volume: 380 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): unknown
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/14
Specifications
Height: 19 metres
Length: -
Volume of RCC: 27 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): unknown
River: Tlit
Reservoir capacity: -
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/14
End of Project: -/15
Specifications
Height: 18 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Rkiza
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/15
Specifications
Height: 26 metres
Length: 500 metres
Volume of RCC: 55 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ansegmir
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 10/10
Start of RCC: 10/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 61 metres
Length: 320 metres
Volume of RCC: 380 m3x103
Total volume: 405 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 70 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Beht
Reservoir capacity: 510 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 98 metres
Length: 383 metres
Volume of RCC: 900 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Asif N Talaght
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/17
End of Project: -/18
Specifications
Height: 44 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Groundwater Recharge / Irrigation
River: Ifegh
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/18
End of Project: -/19
Specifications
Height: 56 metres
Length: 183 metres
Volume of RCC: 124 m3x103
Total volume: 146 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ouaar
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 04/10
Start of RCC: 04/10
End of RCC: -/20
End of Project: -/20
Specifications
Height: 68 metres
Length: 370 metres
Volume of RCC: 580 m3x103
Total volume: 610 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Daraa
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: 05/16
Start of RCC: 05/16
End of RCC: 09/21
End of Project: 06/22
Specifications
Height: 110 metres
Length: 317 metres
Volume of RCC: 833 m3x103
Total volume: 993 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Guir
Reservoir capacity: 220 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/21
Specifications
Height: 62 metres
Length: 271 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Bou Regreg
Reservoir capacity: 507 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 106 metres
Length: 345 metres
Volume of RCC: 900 m3x103
Total volume: 1 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Toudgha
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 11/17
Start of RCC: 11/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 68 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Assayad
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 07/17
Start of RCC: 07/17
End of RCC: 12/22
End of Project: 07/23
Specifications
Height: 77 metres
Length: 830 metres
Volume of RCC: 1400 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Leben
Reservoir capacity: 200 m3x106
Construction Dates
Start of Project: 03/21
Start of RCC: 03/21
End of RCC: 06/24
End of Project: -/25
Specifications
Height: 71 metres
Length: 149 metres
Volume of RCC: 207 m3x103
Total volume: 257 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Kert
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 01/22
Start of RCC: 01/22
End of RCC: 01/26
End of Project: 10/26
Specifications
Height: 70 metres
Length: 684 metres
Volume of RCC: 800 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Kheng Grou
Reservoir capacity: 1070 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 08/26
End of Project: -/26
Specifications
Height: 79 metres
Length: 196 metres
Volume of RCC: 550 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Derna
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/26
End of Project: -/27
Specifications
Height: 95 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Lakhdar
Reservoir capacity: 150 m3x106
Construction Dates
Start of Project: -/23
Start of RCC: -/23
End of RCC: -/27
End of Project: -/27
Specifications
Height: 110 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates