Dam Search Results
- Reservoir Capacity: 1175 m3x106
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Urugua-i | Argentina | H | Urugua-i | 1175 | 10/85 | 04/88 | 04/89 | - /89 | 77 | 687 | 590 | 626 | V | (6) | 0.80 | (17) | 0.80 | (1) | 400 | 400 | 60 | 0 | (-) - | |
Guxian | China | Luohe | 1175 | - /78 | - /89 | - /93 | - /95 | 125 | 315 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Argentina
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Urugua-i
Reservoir capacity: 1175 m3x106
Construction Dates
Start of Project: 10/85
Start of RCC: 10/85
End of RCC: 04/89
End of Project: -/89
Specifications
Height: 77 metres
Length: 687 metres
Volume of RCC: 590 m3x103
Total volume: 626 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: China
Owner: -
Type: -
Purpose(s): unknown
River: Luohe
Reservoir capacity: 1175 m3x106
Construction Dates
Start of Project: -/78
Start of RCC: -/78
End of RCC: -/93
End of Project: -/95
Specifications
Height: 125 metres
Length: 315 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates