Dam Search Results
- Dimensions
- Height: 16 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Caballar I | Spain | F | Belén | 1 | 09/91 | 09/91 | 12/91 | 12/91 | 16 | 98 | 6 | 7 | 0.05 | (3) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 73 | 109 | (F) | |
Villaumur (La Cantache) | France | F | Le Cantache | 7 | 07/93 | 10/93 | 12/93 | 03/94 | 16 | 147 | 11 | 15 | V | (11) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 90 | (R) | ||
Buckhorn | USA | W | Contentea Creek | 03/98 | - /98 | 04/99 | 06/09 | 16 | 781 | 64 | 69 | V | (6) | 300 | 300 | 89 | 0 | (-) - | ||||||
Bullard Creek | USA | F | Bullard Creek | 1 | 10/98 | 08/99 | - /99 | - /99 | 16 | 110 | 7 | 7 | V | (3) | v 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 148 | 44 | (F) | |
Pickle Jar | USA | W | 1 | 10/99 | 03/00 | 05/00 | 08/00 | 16 | 57 | 331 | 331 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 90 | 0 | (-) - | ||
Tiúma | Brazil | W | Tiúma | 6 | - /99 | - /00 | 01/01 | 05/01 | 16 | 290 | ||||||||||||||
Cachoeira Grande | Brazil | H | Jaqueira | 5 | - /04 | - /04 | - /05 | - /05 | 16 | 207 | 15 | |||||||||||||
Cotiporã | Brazil | H | Carreiro | - /07 | - /07 | - /07 | - /07 | 16 | 196 | 21 | 41 | |||||||||||||
Mulungu do Morro | Brazil | I W | Tijuco | 2 | - /07 | - /08 | - /09 | 03/10 | 16 | 156 | 13 | |||||||||||||
Figueirópolis | Brazil | H | Jauru | 35 | - /08 | - /09 | - /10 | 12/10 | 16 | 170 | V | 0.43 | 0.75 | |||||||||||
Ouro | Brazil | H | - /10 | - /10 | - /12 | - /12 | 16 | |||||||||||||||||
Katende | DR Congo | H | 08/11 | - /13 | - /14 | - /15 | 16 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 09/91
Start of RCC: 09/91
End of RCC: 12/91
End of Project: 12/91
Specifications
Height: 16 metres
Length: 98 metres
Volume of RCC: 6 m3x103
Total volume: 7 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.05 | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
73 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
109 | Low-lime flyash (ASTM Class F) |
Details
Country: France
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Le Cantache
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 12/93
End of Project: 03/94
Specifications
Height: 16 metres
Length: 147 metres
Volume of RCC: 11 m3x103
Total volume: 15 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
90 | ROLAC (mixture of flyash and slag with or without limestone fines) |
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Contentea Creek
Reservoir capacity: -
Construction Dates
Start of Project: 03/98
Start of RCC: 03/98
End of RCC: 04/99
End of Project: 06/09
Specifications
Height: 16 metres
Length: 781 metres
Volume of RCC: 64 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
89 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Bullard Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: -/99
End of Project: -/99
Specifications
Height: 16 metres
Length: 110 metres
Volume of RCC: 7 m3x103
Total volume: 7 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
v | RCC against formwork [stepped face] |
0.75 |
Spillway
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
148 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
44 | Low-lime flyash (ASTM Class F) |
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/99
Start of RCC: 10/99
End of RCC: 05/00
End of Project: 08/00
Specifications
Height: 16 metres
Length: 57 metres
Volume of RCC: 331 m3x103
Total volume: 331 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tiúma
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: 01/01
End of Project: 05/01
Specifications
Height: 16 metres
Length: 290 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Jaqueira
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/05
End of Project: -/05
Specifications
Height: 16 metres
Length: 207 metres
Volume of RCC: 15 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/07
End of Project: -/07
Specifications
Height: 16 metres
Length: 196 metres
Volume of RCC: 21 m3x103
Total volume: 41 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Tijuco
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: 03/10
Specifications
Height: 16 metres
Length: 156 metres
Volume of RCC: 13 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Jauru
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: 12/10
Specifications
Height: 16 metres
Length: 170 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.43 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/12
Specifications
Height: 16 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: DR Congo
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 08/11
Start of RCC: 08/11
End of RCC: -/14
End of Project: -/15
Specifications
Height: 16 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates