Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Caraibas - CEMIG | Brazil | F I | Caraibas | 10 | 04/90 | 07/90 | 09/90 | 02/91 | 26 | 160 | 18 | 22 | 0.10 | (1) | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 70 | 20 | (N) | |
Belén-Cagüela | Spain | F | Belén | 1 | 03/91 | 06/91 | 10/91 | 10/91 | 31 | 160 | 24 | 29 | 0.05 | (3) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 73 | 109 | (F) | |
Sahla | Morocco | I W | Sahla | 62 | 05/92 | 11/92 | 12/93 | 07/94 | 55 | 160 | 130 | 160 | 0.20 | (5) | 0.90 | (1)* | 0.80 | (1)* | 300 | 300 | 85 125 | 15 25 | (N) | |
Daxia | China | H I | Quan | 20 | - /04 | - /05 | - /06 | - /07 | 88 | 160 | 205 | |||||||||||||
Khasooyeh | Iran | I | Tang Charkhi | 15 | - /03 | - /05 | - /06 | - /08 | 19 | 160 | 22 | 28 | ||||||||||||
Tianhuaban [A] | China | H | Niulan | 66 | 12/06 | - /07 | - /09 | - /10 | 113 | 160 | 182 | 360 | curve | (3') | curve | (3') | ogee | (3) | ||||||
Shaizhu [A] | China | H | Xima | 3 | - /06 | - /08 | - /10 | - /11 | 72 | 160 | 100 | |||||||||||||
Saizhu [A] | China | H | Xima | 3 | 04/06 | - /09 | - /10 | - /11 | 72 | 160 | 107 | 115 | curve | (3') | curve | (3') | (3) | |||||||
Patuca 3 | Honduras | H | Patuca | 208 | - /12 | - /16 | 02/17 | - /19 | 54 | 160 | 120 | 160 | 0.20 | (1) | 0.75 | (1) | 0.75 | (12) | 300 | 3000 | 107 | 57 | (N) | |
Ibn Hammad | Jordan | G W | Ibn Hammad | 4 | - /15 | 12/16 | 07/17 | - /22 | 56 | 160 | 160 | 160 | 0.30 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 90 100 | 0 0 | (-) - |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Caraibas
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 04/90
Start of RCC: 04/90
End of RCC: 09/90
End of Project: 02/91
Specifications
Height: 26 metres
Length: 160 metres
Volume of RCC: 18 m3x103
Total volume: 22 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Natural pozzolan (ASTM Class N) |
Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/91
Start of RCC: 03/91
End of RCC: 10/91
End of Project: 10/91
Specifications
Height: 31 metres
Length: 160 metres
Volume of RCC: 24 m3x103
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.05 | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
73 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
109 | Low-lime flyash (ASTM Class F) |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sahla
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 05/92
Start of RCC: 05/92
End of RCC: 12/93
End of Project: 07/94
Specifications
Height: 55 metres
Length: 160 metres
Volume of RCC: 130 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.90 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
125 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
25 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Quan
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 160 metres
Volume of RCC: -
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Iran
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Tang Charkhi
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/06
End of Project: -/08
Specifications
Height: 19 metres
Length: 160 metres
Volume of RCC: 22 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Niulan
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 113 metres
Length: 160 metres
Volume of RCC: 182 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
ogee | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Xima
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 72 metres
Length: 160 metres
Volume of RCC: -
Total volume: 100 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Xima
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 04/06
Start of RCC: 04/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 72 metres
Length: 160 metres
Volume of RCC: 107 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Patuca
Reservoir capacity: 208 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: 02/17
End of Project: -/19
Specifications
Height: 54 metres
Length: 160 metres
Volume of RCC: 120 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
107 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
57 | Natural pozzolan (ASTM Class N) |
Details
Country: Jordan
Owner: -
Type: Gravity
Purpose(s): Groundwater Recharge / Water Supply
River: Ibn Hammad
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: 07/17
End of Project: -/22
Specifications
Height: 56 metres
Length: 160 metres
Volume of RCC: 160 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.30 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
0 |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates