Dam Search Results
- Total Volume: 160 m3x103
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Sahla | Morocco | I W | Sahla | 62 | 05/92 | 11/92 | 12/93 | 07/94 | 55 | 160 | 130 | 160 | 0.20 | (5) | 0.90 | (1)* | 0.80 | (1)* | 300 | 300 | 85 125 | 15 25 | (N) | |
R'mil | Tunisia | I | R’mil | 44 | 08/99 | 10/00 | 05/01 | 11/01 | 18 | 260 | 64 | 160 | V | (15) | 0.90 | (16) | 0.90 | (12)* | 300 | 300 | 100 | 0 | (-) - | |
Longqiao [A] | China | H R | Yu | 26 | 12/05 | 03/06 | 02/07 | 05/07 | 95 | 156 | 135 | 160 | curve | (3') | curve | (3) | (3) | |||||||
Patuca 3 | Honduras | H | Patuca | 208 | - /12 | - /16 | 02/17 | - /19 | 54 | 160 | 120 | 160 | 0.20 | (1) | 0.75 | (1) | 0.75 | (12) | 300 | 3000 | 107 | 57 | (N) | |
Ibn Hammad | Jordan | G W | Ibn Hammad | 4 | - /15 | 12/16 | 07/17 | - /22 | 56 | 160 | 160 | 160 | 0.30 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 90 100 | 0 0 | (-) - |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sahla
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 05/92
Start of RCC: 05/92
End of RCC: 12/93
End of Project: 07/94
Specifications
Height: 55 metres
Length: 160 metres
Volume of RCC: 130 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.90 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
125 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
25 |
Details
Country: Tunisia
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: R’mil
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 08/99
Start of RCC: 08/99
End of RCC: 05/01
End of Project: 11/01
Specifications
Height: 18 metres
Length: 260 metres
Volume of RCC: 64 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC supported by fill shoulders |
Downstream
Slope | Type |
---|---|
0.90 | Mechanically compacted unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.90 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Recreation
River: Yu
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 12/05
Start of RCC: 12/05
End of RCC: 02/07
End of Project: 05/07
Specifications
Height: 95 metres
Length: 156 metres
Volume of RCC: 135 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork |
Spillway
Slope | Type |
---|---|
RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Patuca
Reservoir capacity: 208 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: 02/17
End of Project: -/19
Specifications
Height: 54 metres
Length: 160 metres
Volume of RCC: 120 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
107 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
57 | Natural pozzolan (ASTM Class N) |
Details
Country: Jordan
Owner: -
Type: Gravity
Purpose(s): Groundwater Recharge / Water Supply
River: Ibn Hammad
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: 07/17
End of Project: -/22
Specifications
Height: 56 metres
Length: 160 metres
Volume of RCC: 160 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.30 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
0 |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates