Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Guangzhou PSS- Lower damChinaHLiuxihe3012/9410/9112/9210/00611533257V(1)0.70(3)*ogee
0.78
(1)
(1)
30030062108(F)
HelongChinaH R WHailanhe3011/9808/9901/0212/02302444389V(1)0.75(10)ogee(10)*3002000113113(F)
OlivenhainUSAWEscondido Creek3006/0102/0210/0207/039778810701140V(4')0.80(3)*0.80(1)*30030074121(F)
Huizhou PSS - Lower damChinaHCaitouhe30- /02- /03- /05- /1161420235242           
KintaMalaysiaWKinta3001/0302/0403/0607/0690792952975V(3')0.80(3')*0.80(3')*300300100100(F)
Huizhou PSS - Upper damChinaHXiaojinhe3010/0412/0505/07- /11561688493V(1)0.75(1)0.70(1)30030064125(F)
Sông Côn 2VietnamHSong Con30- /06- /07- /09- /1058260             
LonghuakouChinaLonghua30- /08- /09- /10- /1063353 414           
HiraseJapanF H WNishiki30- /10- /16- /20- /2273300 340           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Liuxihe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 12/94

Start of RCC: 12/94

End of RCC: 12/92

End of Project: 10/00

Specifications

Height: 61 metres

Length: 153 metres

Volume of RCC: 32 m3x103

Total volume: 57 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70RCC against formwork  [stepped face]
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
62
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
  
Guangzhou PSS- Lower dam on Google Earth
Guangzhou PSS- Lower dam on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Recreation / Water Supply

River: Hailanhe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 11/98

Start of RCC: 11/98

End of RCC: 01/02

End of Project: 12/02

Specifications

Height: 30 metres

Length: 244 metres

Volume of RCC: 43 m3x103

Total volume: 89 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
ogeeRCC against precast concrete blocks  [stepped face]

Placement

Layers (mm)Lifts (mm)
3002000

Cementitious material

Cement (kg/m3)
113
Pozzolan (kg/m3)Pozzolan Type
113Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Escondido Creek

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 06/01

Start of RCC: 06/01

End of RCC: 10/02

End of Project: 07/03

Specifications

Height: 97 metres

Length: 788 metres

Volume of RCC: 1070 m3x103

Total volume: 1140 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
74
Pozzolan (kg/m3)Pozzolan Type
121Low-lime flyash (ASTM Class F)
  
Olivenhain completed
Olivenhain completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Caitouhe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/05

End of Project: -/11

Specifications

Height: 61 metres

Length: 420 metres

Volume of RCC: 235 m3x103

Total volume: 242 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Huizhou PSS - Lower dam on Google Earth
Huizhou PSS - Lower dam on Google Earth

Full Dam Information

Details

Country: Malaysia

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Kinta

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 01/03

Start of RCC: 01/03

End of RCC: 03/06

End of Project: 07/06

Specifications

Height: 90 metres

Length: 792 metres

Volume of RCC: 952 m3x103

Total volume: 975 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Kinta completed
Kinta completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Xiaojinhe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 10/04

Start of RCC: 10/04

End of RCC: 05/07

End of Project: -/11

Specifications

Height: 56 metres

Length: 168 metres

Volume of RCC: 84 m3x103

Total volume: 93 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
125Low-lime flyash (ASTM Class F)
  
Huizhou PSS - Upper dam on Google Earth
Huizhou PSS - Upper dam on Google Earth

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Song Con

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 58 metres

Length: 260 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sông Côn 2 under construction
Sông Côn 2 under construction

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Longhua

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: -/10

Specifications

Height: 63 metres

Length: 353 metres

Volume of RCC: -

Total volume: 414 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Longhuakou completed
Longhuakou completed

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Nishiki

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/20

End of Project: -/22

Specifications

Height: 73 metres

Length: 300 metres

Volume of RCC: -

Total volume: 340 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Hirase on Google Earth
Hirase on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates