Dam Search Results
- Volume
- Volume of RCC: 75 m3x103
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Cuchillo Negro | USA | F | Cuchillo Negro | 10/89 | 03/90 | 05/91 | 07/91 | 50 | 186 | 75 | 82 | V | (7) | 0.90 | (17) | separate | 300 | 300 | 77 | 59 | (F) | |||
Cova da Mandioca | Brazil | I W | Cova da Mandioca | 126 | 01/93 | 09/93 | 12/94 | 12/94 | 26 | 360 | 75 | 79 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 400 | 400 | 64 | 16 | (-) - | |
Zanja Honda | Colombia | I | Chenche | - /97 | - /98 | - /99 | - /00 | 24 | 75 | 75 | 0 | (-) - | ||||||||||||
Pindobaçu | Brazil | I W | Itapicuru-aço | 17 | - /01 | - /03 | - /04 | - /05 | 45 | 191 | 75 | 85 | 300 | 300 | 56 | 14 | (N) | |||||||
Bandeira de Melo | Brazil | I W | Paraguaçu | 112 | - /02 | 09/03 | - /04 | - /05 | 19 | 320 | 75 | 85 | (1) | (1)* | (1)* | 300 | 300 | 56 | 14 | (N) | ||||
Quatorze (XIV) de Julho | Brazil | H | Das Antas | 55 | - /05 | - /06 | - /07 | 10/08 | 37 | 281 | 75 | 212 | V | 1.30 | 1.30 | 75 | 15 | (N) | ||||||
Capillucas | Peru | H | Canete | 5 | 01/07 | 10/08 | 04/09 | 10/09 | 34 | 60 | 75 | 75 | 0.375 | (3') | 0.75 | (3')* | 300 | 300 | 65 | 90 | (N) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Cuchillo Negro
Reservoir capacity: -
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 05/91
End of Project: 07/91
Specifications
Height: 50 metres
Length: 186 metres
Volume of RCC: 75 m3x103
Total volume: 82 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.90 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
77 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
59 | Low-lime flyash (ASTM Class F) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Cova da Mandioca
Reservoir capacity: 126 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 12/94
End of Project: 12/94
Specifications
Height: 26 metres
Length: 360 metres
Volume of RCC: 75 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | No pozzolan used - |
Details
Country: Colombia
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Chenche
Reservoir capacity: -
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/99
End of Project: -/00
Specifications
Height: 24 metres
Length: -
Volume of RCC: 75 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-aço
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 45 metres
Length: 191 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
14 | Natural pozzolan (ASTM Class N) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Paraguaçu
Reservoir capacity: 112 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 19 metres
Length: 320 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
14 | Natural pozzolan (ASTM Class N) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Das Antas
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 10/08
Specifications
Height: 37 metres
Length: 281 metres
Volume of RCC: 75 m3x103
Total volume: 212 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
1.30 |
Spillway
Slope | Type |
---|---|
1.30 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
Details
Country: Peru
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Canete
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 04/09
End of Project: 10/09
Specifications
Height: 34 metres
Length: 60 metres
Volume of RCC: 75 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.375 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
90 | Natural pozzolan (ASTM Class N) |