Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Concepción | Honduras | W | Concepción | 35 | 12/88 | 12/89 | 06/90 | 08/90 | 68 | 694 | 270 | 290 | 0.075 | (2) | 0.80 | (3)* | 0.80 | (1)* | 400 | 400 | 65 | 15 | (N) | |
Nacaome | Honduras | W | Rio Grande Nacaome | 42 | 06/93 | 08/94 | - /95 | - /95 | 54 | 320 | 250 | 300 | 0.15 | (2) | 0.80 | (3)* | 0.80 | (12)* | 400 | 400 | 64 | 21 | (N) | |
Patuca 3 | Honduras | H | Patuca | 208 | - /12 | - /16 | 02/17 | - /19 | 54 | 160 | 120 | 160 | 0.20 | (1) | 0.75 | (1) | 0.75 | (12) | 300 | 3000 | 107 | 57 | (N) | |
Arenal I-II [A-G] | Honduras | H | Yaguala | 72 | 01/18 | 04/19 | 11/20 | 01/21 | 93 | 273 | 249 | 305 | 0.04 | (3') | 0.40 0.67 | (3') (3') | 0.40 | (13) | ||||||
El Tablón | Honduras | H | Chamelecón | - /19 | - /21 | - /22 | - /23 | 61 | ||||||||||||||||
El Tornillito | Honduras | H | Ulua | 242 | - /17 | - /21 | 05/23 | 10/24 | 83 | 440 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Concepción
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 12/88
Start of RCC: 12/88
End of RCC: 06/90
End of Project: 08/90
Specifications
Height: 68 metres
Length: 694 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.075 | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Rio Grande Nacaome
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 06/93
Start of RCC: 06/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 54 metres
Length: 320 metres
Volume of RCC: 250 m3x103
Total volume: 300 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
21 | Natural pozzolan (ASTM Class N) |
Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Patuca
Reservoir capacity: 208 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: 02/17
End of Project: -/19
Specifications
Height: 54 metres
Length: 160 metres
Volume of RCC: 120 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
107 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
57 | Natural pozzolan (ASTM Class N) |
Details
Country: Honduras
Owner: -
Type: Arch-Gravity
Purpose(s): Hydropower
River: Yaguala
Reservoir capacity: 72 m3x106
Construction Dates
Start of Project: 01/18
Start of RCC: 01/18
End of RCC: 11/20
End of Project: 01/21
Specifications
Height: 93 metres
Length: 273 metres
Volume of RCC: 249 m3x103
Total volume: 305 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.04 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.40 | RCC against formwork (GEVR/GE-RCC) |
0.67 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.40 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Honduras
Owner: -
Type: -
Purpose(s): Hydropower
River: Chamelecón
Reservoir capacity: -
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/22
End of Project: -/23
Specifications
Height: 61 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Ulua
Reservoir capacity: 242 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: 05/23
End of Project: 10/24
Specifications
Height: 83 metres
Length: 440 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.