Dam Search Results
- Dimensions
- Height: 113 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Pangue | Chile | H | Bio-Bio | 175 | 01/92 | 01/95 | 02/96 | 12/96 | 113 | 410 | 670 | 740 | V | (1) | 0.80 | (3)* | 0.80 | (12) | 300 | 300 | 80 | 100 | (N) | |
Gelantan | China | H | Lixian | 409 | 01/03 | 09/06 | 08/08 | - /09 | 113 | 466 | 903 | 1200 | V 0.20 | (3') | 0.75 | (3') | 0.75 | (1) | 77 93 | 77 93 | (S) | |||
Tianhuaban [A] | China | H | Niulan | 66 | 12/06 | - /07 | - /09 | - /10 | 113 | 160 | 182 | 360 | curve | (3') | curve | (3') | ogee | (3) | ||||||
Pirris | Costa Rica | H | Pirris | 36 | 12/06 | 03/09 | 06/10 | 07/11 | 113 | 258 | 695 | 755 | 0.33 | (3')* | 0.50 | (3')* | 0.50 | (12) | 300 | 300 | 88 | 132 | (N) | |
Yalnızardıç | Turkey | H | Göksu | 109 | - /09 | - /11 | - /14 | - /15 | 113 | 300 | 490 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Chile
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Bio-Bio
Reservoir capacity: 175 m3x106
Construction Dates
Start of Project: 01/92
Start of RCC: 01/92
End of RCC: 02/96
End of Project: 12/96
Specifications
Height: 113 metres
Length: 410 metres
Volume of RCC: 670 m3x103
Total volume: 740 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Natural pozzolan (ASTM Class N) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Lixian
Reservoir capacity: 409 m3x106
Construction Dates
Start of Project: 01/03
Start of RCC: 01/03
End of RCC: 08/08
End of Project: -/09
Specifications
Height: 113 metres
Length: 466 metres
Volume of RCC: 903 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.20 |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
77 |
93 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
77 | Ground-granulated blast-furnace slag |
93 |
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Niulan
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 113 metres
Length: 160 metres
Volume of RCC: 182 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
ogee | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Costa Rica
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Pirris
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: 06/10
End of Project: 07/11
Specifications
Height: 113 metres
Length: 258 metres
Volume of RCC: 695 m3x103
Total volume: 755 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.33 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
Slope | Type |
---|---|
0.50 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.50 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
88 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
132 | Natural pozzolan (ASTM Class N) |
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 109 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/14
End of Project: -/15
Specifications
Height: 113 metres
Length: 300 metres
Volume of RCC: 490 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates