Dam Search Results
- Dimensions
- Height: 64 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Xibingxi [A-G] | China | H W | Longshanxi | 9 | 08/93 | 12/94 | 07/95 | 10/95 | 64 | 93 | 25 | 33 | V 0.08 | (4) (4) | 0.65 | (3) | ogee 0.65 | (13) | 300 - 350 | 300 - 350 | 80 79 | 120 105 | (F) | |
Qingyanggou | China | H | Sule | - /09 | - /10 | - /11 | - /12 | 64 | 147 | |||||||||||||||
El Bolsón | Argentina | I W | Albigasta | 38 | - /08 | - /13 | - /17 | - /19 | 64 | 380 | 279 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Arch-Gravity
Purpose(s): Hydropower / Water Supply
River: Longshanxi
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 08/93
Start of RCC: 08/93
End of RCC: 07/95
End of Project: 10/95
Specifications
Height: 64 metres
Length: 93 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane |
0.08 | RCC against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.65 | RCC against formwork |
Spillway
Slope | Type |
---|---|
ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
0.65 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 - | 300 - |
350 | 350 |
Cementitious material
Cement (kg/m3) |
---|
80 |
79 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |
105 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Sule
Reservoir capacity: -
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 64 metres
Length: 147 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Argentina
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Albigasta
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/17
End of Project: -/19
Specifications
Height: 64 metres
Length: 380 metres
Volume of RCC: -
Total volume: 279 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates