Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Rialb | Spain | I W | Segre | 402 | 01/93 | 10/95 | 12/98 | 01/00 | 99 | 630 | 980 | 1016 | 0.15 0.35 | (1) (1) | 0.40 0.65 | (1) (1) | 0.65 | (1) | 330 | 330 | 70 65 | 130 130 | (F) | |
Gibe III | Ethiopia | H | Omo | 14690 | 04/08 | 12/11 | 10/15 | - /16 | 246 | 630 | 6200 | 6400 | 0.25 | (3') | 1.00 | (3')* | 1.00 | (3')* | 400 | 400 | 70 to 120 | 45 to 60 | (S) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Segre
Reservoir capacity: 402 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 12/98
End of Project: 01/00
Specifications
Height: 99 metres
Length: 630 metres
Volume of RCC: 980 m3x103
Total volume: 1016 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork |
0.35 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.40 | Traditional concrete against formwork |
0.65 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.65 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
330 | 330 |
Cementitious material
Cement (kg/m3) |
---|
70 |
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
130 | Low-lime flyash (ASTM Class F) |
130 |
Details
Country: Ethiopia
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Omo
Reservoir capacity: 14690 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 10/15
End of Project: -/16
Specifications
Height: 246 metres
Length: 630 metres
Volume of RCC: 6200 m3x103
Total volume: 6400 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.25 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
70 to |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 to | Ground-granulated blast-furnace slag |