Dam Search Results
- Total Volume: 360 m3x103
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Pirika | Japan | F H I | Shirobeshit-oshibetsu | 18 | 10/82 | - /88 | - /89 | 10/91 | 40 | 755 | 163 | 360 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) | |
Kutani | Japan | F W | Daishoji | 25 | 12/96 | 04/00 | 07/02 | 03/06 | 76 | 280 | 188 | 360 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) | |
Tianhuaban [A] | China | H | Niulan | 66 | 12/06 | - /07 | - /09 | - /10 | 113 | 160 | 182 | 360 | curve | (3') | curve | (3') | ogee | (3) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Shirobeshit-oshibetsu
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 10/82
Start of RCC: 10/82
End of RCC: -/89
End of Project: 10/91
Specifications
Height: 40 metres
Length: 755 metres
Volume of RCC: 163 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.80 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Daishoji
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 12/96
Start of RCC: 12/96
End of RCC: 07/02
End of Project: 03/06
Specifications
Height: 76 metres
Length: 280 metres
Volume of RCC: 188 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.80 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Niulan
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 113 metres
Length: 160 metres
Volume of RCC: 182 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
ogee | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|