SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Knellpoort
[A-G]
South AfricaWRietspruit 13704/8805/8811/8809/89502004559V(1)0.60(1)*0.60(1)*25025061142(F)
Wolwedans
[A-G]
South AfricaWGreat Brak2411/8710/8810/8911/9070268180210V(1)0.50(1)*0.50(1)*25025058136(F)
Xibingxi
[A-G]
ChinaH WLongshanxi908/9312/9407/9510/9564932533V
0.08
(4)
(4)
0.65(3)ogee
0.65
(13)300 -
350
300 -
350
80
79
120
105
(F)
Hongpo
[A-G]
ChinaWQinggoushui310/9707/9811/9912/99552447177V(3')0.50(1)0.50(1)30030005499(F)
Longshou Nº1
[A-G]
ChinaHHeihe1304/9903/0006/0109/0180258187210V
0.20
(1)
(1)
0.75(1)0.75(1)300300096
58
109
113
(F)
Gomal Zam
[A-G]
PakistanF H IGomal142407/0212/0803/1109/11133231390474V 0.60 0.60 3003000 to
4000
9191(F)
Changuinola 1
[A-G]
PanamaHChanguinola34704/0712/0904/1110/11105595884910V(3')0.50
0.70
(3')*
(3')*
0.50(12)30030070
65
145
150
(F)
Portugues
[A-G]
USAFPortugues2004/0801/1105/1212/1367375270310V(3')0.35(3')*0.35(1)30030011451(F)
Kotanli II
[A-G]
TurkeyHKura2010/1205/1404/1511/15702502482520.15(3)0.70(3')0.70(12)30030085130(N)
Tabellout
[A-G]
AlgeriaI WDjen Djen29403/1003/1308/1512/15121366975  (12) (12) (12)*3003008545 
Köroglu Kotanli 1
[A-G]
TurkeyHKura7303/1506/1502/1704/17100404640680V(3')0.60(3')*0.60(12)30030085130(N)
Sanhekou
[A-G]
ChinaZiwuhe710- /1110/1612/1906/20142472             
Arenal I-II
[A-G]
HondurasHYaguala7201/1804/1911/2001/21932732493050.04(3')0.40
0.67
(3')
(3')
0.40(13)     
Chame Shir
[A-G]
IranF H I WZohreh2300- /11- /16- /22- /2315168011001200V 0.70   3003001600(-) -
El-Janneh
[A-G]
LebanonH I WIbrahim (Abraham)38- /1502/20- /22- /221603501450       300300   
Asuwagawa
[A-G]
JapanFBeko2907/06- /18- /24- /2696              
Porvenir II
[A-G]
ColombiaHNorth Samaná - /18- /22- /26- /27140548  V(3')0.50(3')*  300300   

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: South Africa

Owner: -

Type: Arch-Gravity

Purpose(s): Water Supply

River: Rietspruit

Reservoir capacity: 137 m3x106

Construction Dates

Start of Project: 04/88

Start of RCC: 04/88

End of RCC: 11/88

End of Project: 09/89

Specifications

Height: 50 metres

Length: 200 metres

Volume of RCC: 45 m3x103

Total volume: 59 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.60Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.60Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
250250

Cementitious material

Cement (kg/m3)
61
Pozzolan (kg/m3)Pozzolan Type
142Low-lime flyash (ASTM Class F)
  
Knellpoort completed
Knellpoort completed

Full Dam Information

Details

Country: South Africa

Owner: -

Type: Arch-Gravity

Purpose(s): Water Supply

River: Great Brak

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: 11/87

Start of RCC: 11/87

End of RCC: 10/89

End of Project: 11/90

Specifications

Height: 70 metres

Length: 268 metres

Volume of RCC: 180 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.50Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.50Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
250250

Cementitious material

Cement (kg/m3)
58
Pozzolan (kg/m3)Pozzolan Type
136Low-lime flyash (ASTM Class F)
  
Wolwedans completed
Wolwedans completed

Full Dam Information

Details

Country: China

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower / Water Supply

River: Longshanxi

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: 08/93

Start of RCC: 08/93

End of RCC: 07/95

End of Project: 10/95

Specifications

Height: 64 metres

Length: 93 metres

Volume of RCC: 25 m3x103

Total volume: 33 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane
0.08RCC against formwork with external geomembrane
Downstream
SlopeType
0.65RCC against formwork
Spillway
SlopeType
ogeeReinforced concrete cast against precast units or slip-formed facing elements
0.65 

Placement

Layers (mm)Lifts (mm)
300  -300  -
350350

Cementitious material

Cement (kg/m3)
80
79
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
105 
Xibingxi completed
Xibingxi completed

Full Dam Information

Details

Country: China

Owner: -

Type: Arch-Gravity

Purpose(s): Water Supply

River: Qinggoushui

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 10/97

Start of RCC: 10/97

End of RCC: 11/99

End of Project: 12/99

Specifications

Height: 55 metres

Length: 244 metres

Volume of RCC: 71 m3x103

Total volume: 77 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.50Traditional concrete against formwork
Spillway
SlopeType
0.50Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
54
Pozzolan (kg/m3)Pozzolan Type
99Low-lime flyash (ASTM Class F)
  
Hongpo under construction
Hongpo under construction

Full Dam Information

Details

Country: China

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower

River: Heihe

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: 04/99

Start of RCC: 04/99

End of RCC: 06/01

End of Project: 09/01

Specifications

Height: 80 metres

Length: 258 metres

Volume of RCC: 187 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
96
58
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)
113 
Longshou Nº1 completed
Longshou Nº1 completed

Full Dam Information

Details

Country: Pakistan

Owner: -

Type: Arch-Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Gomal

Reservoir capacity: 1424 m3x106

Construction Dates

Start of Project: 07/02

Start of RCC: 07/02

End of RCC: 03/11

End of Project: 09/11

Specifications

Height: 133 metres

Length: 231 metres

Volume of RCC: 390 m3x103

Total volume: 474 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.60 
Spillway
SlopeType
0.60 

Placement

Layers (mm)Lifts (mm)
3003000  to
 4000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
91Low-lime flyash (ASTM Class F)
  
Gomal Zam completed
Gomal Zam completed

Full Dam Information

Details

Country: Panama

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower

River: Changuinola

Reservoir capacity: 347 m3x106

Construction Dates

Start of Project: 04/07

Start of RCC: 04/07

End of RCC: 04/11

End of Project: 10/11

Specifications

Height: 105 metres

Length: 595 metres

Volume of RCC: 884 m3x103

Total volume: 910 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.50RCC against formwork (GEVR/GE-RCC)  [stepped face]
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.50Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
65
Pozzolan (kg/m3)Pozzolan Type
145Low-lime flyash (ASTM Class F)
150 
Changuinola 1 completed
Changuinola 1 completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Arch-Gravity

Purpose(s): Flood Control

River: Portugues

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 04/08

Start of RCC: 04/08

End of RCC: 05/12

End of Project: 12/13

Specifications

Height: 67 metres

Length: 375 metres

Volume of RCC: 270 m3x103

Total volume: 310 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.35RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.35Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
114
Pozzolan (kg/m3)Pozzolan Type
51Low-lime flyash (ASTM Class F)
  
Portugues completed
Portugues completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower

River: Kura

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 10/12

Start of RCC: 10/12

End of RCC: 04/15

End of Project: 11/15

Specifications

Height: 70 metres

Length: 250 metres

Volume of RCC: 248 m3x103

Total volume: 252 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15RCC against formwork
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
Kotanli II completed
Kotanli II completed

Full Dam Information

Details

Country: Algeria

Owner: -

Type: Arch-Gravity

Purpose(s): Irrigation / Water Supply

River: Djen Djen

Reservoir capacity: 294 m3x106

Construction Dates

Start of Project: 03/10

Start of RCC: 03/10

End of RCC: 08/15

End of Project: 12/15

Specifications

Height: 121 metres

Length: 366 metres

Volume of RCC: 975 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
45 
  
Tabellout completed
Tabellout completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower

River: Kura

Reservoir capacity: 73 m3x106

Construction Dates

Start of Project: 03/15

Start of RCC: 03/15

End of RCC: 02/17

End of Project: 04/17

Specifications

Height: 100 metres

Length: 404 metres

Volume of RCC: 640 m3x103

Total volume: 680 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.60RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.60Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
Köroglu Kotanli 1 completed
Köroglu Kotanli 1 completed

Full Dam Information

Details

Country: China

Owner: -

Type: Arch-Gravity

Purpose(s): unknown

River: Ziwuhe

Reservoir capacity: 710 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: 12/19

End of Project: 06/20

Specifications

Height: 142 metres

Length: 472 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Honduras

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower

River: Yaguala

Reservoir capacity: 72 m3x106

Construction Dates

Start of Project: 01/18

Start of RCC: 01/18

End of RCC: 11/20

End of Project: 01/21

Specifications

Height: 93 metres

Length: 273 metres

Volume of RCC: 249 m3x103

Total volume: 305 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.04RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.40RCC against formwork (GEVR/GE-RCC)
0.67RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.40Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Arenal I-II completed
Arenal I-II completed

Full Dam Information

Details

Country: Iran

Owner: -

Type: Arch-Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Zohreh

Reservoir capacity: 2300 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/22

End of Project: -/23

Specifications

Height: 151 metres

Length: 680 metres

Volume of RCC: 1100 m3x103

Total volume: 1200 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.70 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
160
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Chame Shir under construction
Chame Shir under construction

Full Dam Information

Details

Country: Lebanon

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Ibrahim (Abraham)

Reservoir capacity: 38 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/22

End of Project: -/22

Specifications

Height: 160 metres

Length: 350 metres

Volume of RCC: 1450 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
El-Janneh on Google Earth
El-Janneh on Google Earth

Full Dam Information

Details

Country: Japan

Owner: -

Type: Arch-Gravity

Purpose(s): Flood Control

River: Beko

Reservoir capacity: 29 m3x106

Construction Dates

Start of Project: 07/06

Start of RCC: 07/06

End of RCC: -/24

End of Project: -/26

Specifications

Height: 96 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Colombia

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower

River: North Samaná

Reservoir capacity: -

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/26

End of Project: -/27

Specifications

Height: 140 metres

Length: 548 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.50RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates