Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Ain al Koreima | Morocco | I | Akreuch | 1 | 06/87 | 09/87 | 02/88 | 03/88 | 26 | 124 | 17 | 20 | 0.20 | (5)* | 0.20 0.75 | (5) (17) | 0.60 | (1)* | 350 | 350 | 70 140 | 30 60 | (S) | |
Aoulouz | Morocco | F G I | Souss | 110 | 03/88 | 11/89 | 09/90 | 11/91 | 79 | 476 | 680 | 850 | V | (1) | 0.85 | (1)* | 0.85 | (1) | 500 | 500 | 120 90 | 0 0 | (M) | |
Joumoua | Morocco | W | Joumoua | 7 | 07/89 | 06/90 | 11/92 | 12/92 | 57 | 250 | 150 | 200 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 350 | 350 | 105 180 | 45 0 | (-) - | |
Imi el Kheng | Morocco | G I | Oued Berhil | 12 | 04/92 | 09/92 | 07/93 | 04/94 | 39 | 170 | 97 | 109 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 110 | 20 20 | (N) | |
Sahla | Morocco | I W | Sahla | 62 | 05/92 | 11/92 | 12/93 | 07/94 | 55 | 160 | 130 | 160 | 0.20 | (5) | 0.90 | (1)* | 0.80 | (1)* | 300 | 300 | 85 125 | 15 25 | (N) | |
Enjil | Morocco | I W | Taghoucht | 12 | 11/93 | 03/94 | 10/95 | 03/96 | 36 | 80 | 45 | 57 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 110 150 | 0 0 | (N) | |
Bouhouda | Morocco | I W | Sraa | 56 | 05/95 | 04/96 | 05/98 | 09/98 | 55 | 174 | 165 | 186 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 120 | 0 0 | (N) | |
Bab Louta | Morocco | W | Bous Sbaa | 37 | 01/97 | 02/98 | 02/99 | 03/99 | 54 | 110 | 63 | 77 | V | (5) | 0.75 | (1)* | 0.75 | (13) | 300 | 300 | 65 80 | 15 20 | (N) | |
Ahl Souss (Ait M’Zal) | Morocco | I W | Izig | 5 | 11/01 | 01/03 | 05/03 | 01/04 | 49 | 222 | 50 | 27 | 0.20 | (1) | 0.80 | (1)* | 0.85 | (12) | 300 | 300 | 80 100 | 0 0 | (-) - | |
Hassan II (formerly Sidi Said) | Morocco | F I W | Moulouya | 400 | 02/01 | 03/03 | 04/04 | 03/05 | 115 | 577 | 590 | 690 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 80 | 15 20 | (N) | |
Tamesna (formerly Boukerkour) | Morocco | F I W | Zamrine | 56 | 05/03 | 04/04 | 09/04 | 05/05 | 66 | 220 | 190 | 215 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 | 0 | (N) | |
R’Mel (formerly Tanger-Med) | Morocco | F W | R’Mel | 25 | 05/05 | 06/06 | 06/07 | 10/07 | 79 | 250 | 230 | 243 | V | (11) | 0.75 | (1) | 0.75 | (1) | 300 | 3000 | 100 90 | 0 0 | (-) - | |
Yacoub El Mansour (formerly Ouirgane) | Morocco | W | N’Fis | 70 | 07/05 | 10/06 | 07/07 | 03/08 | 71 | 233 | 202 | 216 | V | (11) | 0.75 | (1)* | 0.75 | (1)* | 300 | 3000 | 100 | 0 | (-) - | |
Sidi Yahya (formerly Ain Kwachia) | Morocco | I W | Khellata | 11 | 01/07 | 05/07 | 07/08 | 11/08 | 30 | 213 | 60 | 78 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 105 | 0 | (-) - | |
Chibka | Morocco | I | Chbika | 2 | - /04 | - /06 | - /08 | - /09 | 24 | |||||||||||||||
El Handak | Morocco | I | El Handak | 1 | - /05 | - /06 | - /08 | - /09 | 27 | |||||||||||||||
Sidi el Mahjoub | Morocco | Ifrane | 1 | - /06 | - /07 | - /08 | - /09 | 22 | 15 | 18 | V | (5) | 1.00 | (1)* | 1.00 | (1)* | ||||||||
El Malleh Amont | Morocco | F | El Malleh | 35 | 01/07 | 09/07 | 06/09 | 10/09 | 49 | 174 | 100 | 140 | 0.20 | (5) | 0.60 | (5) | 0.60 | (5) | 300 | 300 | 120 | 0 | (-) - | |
Sehb el Merga | Morocco | F I W | Sehb el Merga | 7 | 06/07 | - /08 | - /09 | - /10 | 37 | 480 | 85 | 95 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 | 25 | (N) | |
Abou Al Abbas Sebti (formerly Taskourt) | Morocco | I W | Al Mal | 25 | 01/08 | 04/09 | 09/10 | 04/11 | 75 | 408 | 415 | 490 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 73 | 32 | (N) | |
Sfeissif | Morocco | Safsaf | 20 | - /08 | - /09 | - /10 | - /11 | 29 | V | (5) | 0.85 | (1)* | 0.85 | (1)* | 300 | 300 | 120 | 0 | (-) - | |||||
Ait Moulay Ahmed | Morocco | I W | Ain Leuh | 2 | 10/09 | - /10 | 01/11 | 10/11 | 29 | 136 | 18 | 20 | V | (5) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 70 | 30 | (N) | |
Ahl Lafouim | Morocco | W | 3 | - /09 | - /10 | - /11 | - /12 | 15 | 20 | 24 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | ||||||||
Laananat | Morocco | W | 1 | - /09 | - /10 | - /11 | - /12 | 15 | 18 | 20 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | ||||||||
Krayma | Morocco | W | Tiyoughza | 3 | - /09 | - /10 | - /11 | - /12 | 32 | 45 | 53 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 120 100 | 0 | (-) - | ||||
Tamelast | Morocco | 1 | - /11 | - /12 | - /13 | - /14 | 19 | 27 | V | (5) | 1.00 | (1)* | 1.00 | (1)* | ||||||||||
Tiouine | Morocco | F I W | Iriri | 270 | 05/10 | - /11 | - /14 | - /15 | 84 | 202 | 270 | 380 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 100 | 0 | (-) - | |||
Rkiza | Morocco | F I W | 17 | - /13 | - /15 | - /16 | - /17 | 26 | 500 | 55 | 60 | V | (5) | 0.85 | (1)* | 0.85 | (1)* | |||||||
Ain Ksob | Morocco | Daliya | 17 | - /15 | - /17 | - /18 | - /19 | 47 | ||||||||||||||||
Agdez | Morocco | F I W | Draa | 247 | 05/16 | 03/19 | 09/20 | 06/21 | 110 | 317 | 833 | 993 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | (N) | |||||
Kaddoussa | Morocco | F I W | Guir | 220 | - /16 | - /18 | - /21 | - /21 | 62 | 271 | 180 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | (N) | |||
Tiddas | Morocco | F I W | Bou Regreg | 500 | - /16 | - /18 | - /21 | - /22 | 106 | 345 | 900 | 1 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | ||||
Toudgha | Morocco | F I W | Toudgha | 33 | 11/17 | - /19 | - /21 | - /22 | 68 | V | (1) | 0.90 | (1)* | 0.90 | (1)* | |||||||||
Sidi Abbou | Morocco | F H I W | Leben | 198 | 01/20 | 10/20 | 10/22 | 10/24 | 71 | 111 | 200 | |||||||||||||
Fask | Morocco | F I W | Assayad | 79 | 07/17 | 01/19 | 12/22 | 07/23 | 77 | 830 | 1400 | 0.10 | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | (N) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Akreuch
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/87
Start of RCC: 06/87
End of RCC: 02/88
End of Project: 03/88
Specifications
Height: 26 metres
Length: 124 metres
Volume of RCC: 17 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels [stepped face] |
Downstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
0.75 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.60 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
350 | 350 |
Cementitious material
Cement (kg/m3) |
---|
70 |
140 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
30 | Ground-granulated blast-furnace slag |
60 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Groundwater Recharge / Irrigation
River: Souss
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 03/88
Start of RCC: 03/88
End of RCC: 09/90
End of Project: 11/91
Specifications
Height: 79 metres
Length: 476 metres
Volume of RCC: 680 m3x103
Total volume: 850 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.85 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.85 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
500 | 500 |
Cementitious material
Cement (kg/m3) |
---|
120 |
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | Milled sand |
0 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Joumoua
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/89
Start of RCC: 07/89
End of RCC: 11/92
End of Project: 12/92
Specifications
Height: 57 metres
Length: 250 metres
Volume of RCC: 150 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
350 | 350 |
Cementitious material
Cement (kg/m3) |
---|
105 |
180 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | No pozzolan used - |
0 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation
River: Oued Berhil
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 04/92
Start of RCC: 04/92
End of RCC: 07/93
End of Project: 04/94
Specifications
Height: 39 metres
Length: 170 metres
Volume of RCC: 97 m3x103
Total volume: 109 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
110 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Natural pozzolan (ASTM Class N) |
20 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sahla
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 05/92
Start of RCC: 05/92
End of RCC: 12/93
End of Project: 07/94
Specifications
Height: 55 metres
Length: 160 metres
Volume of RCC: 130 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.90 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
125 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
25 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Taghoucht
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 11/93
Start of RCC: 11/93
End of RCC: 10/95
End of Project: 03/96
Specifications
Height: 36 metres
Length: 80 metres
Volume of RCC: 45 m3x103
Total volume: 57 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
110 |
150 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | Natural pozzolan (ASTM Class N) |
0 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sraa
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: 05/98
End of Project: 09/98
Specifications
Height: 55 metres
Length: 174 metres
Volume of RCC: 165 m3x103
Total volume: 186 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
120 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | Natural pozzolan (ASTM Class N) |
0 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Bous Sbaa
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 01/97
Start of RCC: 01/97
End of RCC: 02/99
End of Project: 03/99
Specifications
Height: 54 metres
Length: 110 metres
Volume of RCC: 63 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
20 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Izig
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 11/01
Start of RCC: 11/01
End of RCC: 05/03
End of Project: 01/04
Specifications
Height: 49 metres
Length: 222 metres
Volume of RCC: 50 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
0 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Moulouya
Reservoir capacity: 400 m3x106
Construction Dates
Start of Project: 02/01
Start of RCC: 02/01
End of RCC: 04/04
End of Project: 03/05
Specifications
Height: 115 metres
Length: 577 metres
Volume of RCC: 590 m3x103
Total volume: 690 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
20 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Zamrine
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/03
Start of RCC: 05/03
End of RCC: 09/04
End of Project: 05/05
Specifications
Height: 66 metres
Length: 220 metres
Volume of RCC: 190 m3x103
Total volume: 215 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | Natural pozzolan (ASTM Class N) |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: R’Mel
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: 06/07
End of Project: 10/07
Specifications
Height: 79 metres
Length: 250 metres
Volume of RCC: 230 m3x103
Total volume: 243 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
100 |
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
0 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: N’Fis
Reservoir capacity: 70 m3x106
Construction Dates
Start of Project: 07/05
Start of RCC: 07/05
End of RCC: 07/07
End of Project: 03/08
Specifications
Height: 71 metres
Length: 233 metres
Volume of RCC: 202 m3x103
Total volume: 216 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Khellata
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 07/08
End of Project: 11/08
Specifications
Height: 30 metres
Length: 213 metres
Volume of RCC: 60 m3x103
Total volume: 78 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
105 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Chbika
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/08
End of Project: -/09
Specifications
Height: 24 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: El Handak
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/08
End of Project: -/09
Specifications
Height: 27 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): unknown
River: Ifrane
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 22 metres
Length: -
Volume of RCC: 15 m3x103
Total volume: 18 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
1.00 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
1.00 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: El Malleh
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 06/09
End of Project: 10/09
Specifications
Height: 49 metres
Length: 174 metres
Volume of RCC: 100 m3x103
Total volume: 140 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.60 | Traditional concrete against precast concrete panels |
Spillway
Slope | Type |
---|---|
0.60 | Traditional concrete against precast concrete panels |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
120 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sehb el Merga
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 37 metres
Length: 480 metres
Volume of RCC: 85 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
25 | Natural pozzolan (ASTM Class N) |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Al Mal
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 01/08
Start of RCC: 01/08
End of RCC: 09/10
End of Project: 04/11
Specifications
Height: 75 metres
Length: 408 metres
Volume of RCC: 415 m3x103
Total volume: 490 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
73 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
32 | Natural pozzolan (ASTM Class N) |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): unknown
River: Safsaf
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 29 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.85 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.85 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
120 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ain Leuh
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 10/09
Start of RCC: 10/09
End of RCC: 01/11
End of Project: 10/11
Specifications
Height: 29 metres
Length: 136 metres
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
30 | Natural pozzolan (ASTM Class N) |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 15 metres
Length: -
Volume of RCC: 20 m3x103
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 15 metres
Length: -
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tiyoughza
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 32 metres
Length: -
Volume of RCC: 45 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
120 |
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): unknown
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/14
Specifications
Height: 19 metres
Length: -
Volume of RCC: 27 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
1.00 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
1.00 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Iriri
Reservoir capacity: 270 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: -/14
End of Project: -/15
Specifications
Height: 84 metres
Length: 202 metres
Volume of RCC: 270 m3x103
Total volume: 380 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: -
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/17
Specifications
Height: 26 metres
Length: 500 metres
Volume of RCC: 55 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.85 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.85 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): unknown
River: Daliya
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 47 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Draa
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: 05/16
Start of RCC: 05/16
End of RCC: 09/20
End of Project: 06/21
Specifications
Height: 110 metres
Length: 317 metres
Volume of RCC: 833 m3x103
Total volume: 993 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Natural pozzolan (ASTM Class N) | |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Guir
Reservoir capacity: 220 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/21
Specifications
Height: 62 metres
Length: 271 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Natural pozzolan (ASTM Class N) | |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Bou Regreg
Reservoir capacity: 500 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 106 metres
Length: 345 metres
Volume of RCC: 900 m3x103
Total volume: 1 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Toudgha
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 11/17
Start of RCC: 11/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 68 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.90 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.90 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Leben
Reservoir capacity: 198 m3x106
Construction Dates
Start of Project: 01/20
Start of RCC: 01/20
End of RCC: 10/22
End of Project: 10/24
Specifications
Height: 71 metres
Length: 111 metres
Volume of RCC: 200 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Assayad
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 07/17
Start of RCC: 07/17
End of RCC: 12/22
End of Project: 07/23
Specifications
Height: 77 metres
Length: 830 metres
Volume of RCC: 1400 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Natural pozzolan (ASTM Class N) | |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates