Dam Search Results
- Dimensions
- Height: 21 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Hudson River Nº11 | USA | W | Mountain Creek | 11/92 | 04/93 | 08/93 | - /93 | 21 | 168 | 26 | 28 | V | (6) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 119 | 84 | (F) | ||
New Peterson Lake | USA | W | Tributary of Cache La Poudre | 3 | 05/95 | 09/95 | 11/95 | 12/95 | 21 | 70 | 7 | 8 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 145 | 48 | (F) | |
Juba I | Brazil | H | Juba | - /93 | - /94 | - /95 | - /96 | 21 | 238 | 96 | 113 | 60 | 15 | (N) | ||||||||||
Juba II | Brazil | H | Juba | - /93 | - /94 | - /95 | - /96 | 21 | 238 | 105 | 113 | 60 | 15 | (N) | ||||||||||
El Esparragal | Spain | E | Viar | 5 | - /02 | 05/03 | 08/03 | 03/04 | 21 | 383 | 62 | 89 | 0.30 | (3')* | 0.90 | (3')* | 0.90 | (3')* | 300 | 300 | 68 | 157 | (F) | |
Barra do Rio Chapéu | Brazil | H W | Braço do Norte | 21 | - /12 | - /12 | - /13 | - /13 | 21 | |||||||||||||||
Jubinha I | Brazil | H | Jubinha | 480 | - /15 | - /15 | - /15 | - /15 | 21 | 1540 | ||||||||||||||
Colonia | Brazil | W | Colonia | 62 | 09/15 | - /17 | - /18 | 09/18 | 21 | 195 | 30 | 34 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Mountain Creek
Reservoir capacity: -
Construction Dates
Start of Project: 11/92
Start of RCC: 11/92
End of RCC: 08/93
End of Project: -/93
Specifications
Height: 21 metres
Length: 168 metres
Volume of RCC: 26 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
119 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
84 | Low-lime flyash (ASTM Class F) |
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tributary of Cache La Poudre
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: 11/95
End of Project: 12/95
Specifications
Height: 21 metres
Length: 70 metres
Volume of RCC: 7 m3x103
Total volume: 8 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
145 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
48 | Low-lime flyash (ASTM Class F) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: -
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 21 metres
Length: 238 metres
Volume of RCC: 96 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: -
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 21 metres
Length: 238 metres
Volume of RCC: 105 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Environmental
River: Viar
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: 08/03
End of Project: 03/04
Specifications
Height: 21 metres
Length: 383 metres
Volume of RCC: 62 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.30 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
Slope | Type |
---|---|
0.90 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.90 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
68 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
157 | Low-lime flyash (ASTM Class F) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Braço do Norte
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: -/13
Specifications
Height: 21 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Jubinha
Reservoir capacity: 480 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/15
End of Project: -/15
Specifications
Height: 21 metres
Length: 1540 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Colonia
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 09/15
Start of RCC: 09/15
End of RCC: -/18
End of Project: 09/18
Specifications
Height: 21 metres
Length: 195 metres
Volume of RCC: 30 m3x103
Total volume: 34 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates