SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
TannurJordanIWadi al Hasa1702/9912/9912/0009/0160270250250V
1.00
(3')0.80(3')*0.80(3')*3001200125
120
75
50
(N)
El RealitoMexicoSanta Maria57- /0807/0906/11- /1185270420 V(1)0.85 0.85 30030033 to  6627 to  54(S)
Anta (with Simplicio)BrazilHParaiba do Sul114- /09- /10- /1112/11302704455           
Cerro del ÁguilaPeruHMantaro3711/1208/1406/15- /16892702504500.10(1)0.75(1)*0.75(12)30060011523 
Güneysinir AlanözüTurkeyIYangılı3- /13- /14- /15- /153827071            
KargiTurkeyHSakarya50- /11- /1512/1606/1795270535            
UchigataniJapanF HUchigatani12- /14- /18- /21- /2384270 328           
KohalaPakistanHJhelum49- /16- /20- /23- /2469270             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Jordan

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Wadi al Hasa

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: 02/99

Start of RCC: 02/99

End of RCC: 12/00

End of Project: 09/01

Specifications

Height: 60 metres

Length: 270 metres

Volume of RCC: 250 m3x103

Total volume: 250 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
1.00 
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
125
120
Pozzolan (kg/m3)Pozzolan Type
75Natural pozzolan (ASTM Class N)
50 
Tannur completed
Tannur completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): unknown

River: Santa Maria

Reservoir capacity: 57 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 06/11

End of Project: -/11

Specifications

Height: 85 metres

Length: 270 metres

Volume of RCC: 420 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.85 
Spillway
SlopeType
0.85 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
33  to
Pozzolan (kg/m3)Pozzolan Type
27  toGround-granulated blast-furnace slag
  
El Realito completed
El Realito completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Paraiba do Sul

Reservoir capacity: 114 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: 12/11

Specifications

Height: 30 metres

Length: 270 metres

Volume of RCC: 44 m3x103

Total volume: 55 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Anta (with Simplicio) completed
Anta (with Simplicio) completed

Full Dam Information

Details

Country: Peru

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Mantaro

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: 11/12

Start of RCC: 11/12

End of RCC: 06/15

End of Project: -/16

Specifications

Height: 89 metres

Length: 270 metres

Volume of RCC: 250 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
115
Pozzolan (kg/m3)Pozzolan Type
23 
  
Cerro del Águila completed
Cerro del Águila completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Yangılı

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/15

End of Project: -/15

Specifications

Height: 38 metres

Length: 270 metres

Volume of RCC: 71 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Güneysinir Alanözü completed
Güneysinir Alanözü completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Sakarya

Reservoir capacity: 50 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: 12/16

End of Project: 06/17

Specifications

Height: 95 metres

Length: 270 metres

Volume of RCC: 535 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Kargi completed
Kargi completed

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Uchigatani

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/21

End of Project: -/23

Specifications

Height: 84 metres

Length: 270 metres

Volume of RCC: -

Total volume: 328 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Uchigatani on Google Earth
Uchigatani on Google Earth

Full Dam Information

Details

Country: Pakistan

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Jhelum

Reservoir capacity: 49 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 69 metres

Length: 270 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates