Dam Search Results
- Reservoir Capacity: 17 m3x106
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Willow Creek | USA | F R | Willow Creek | 17 | 11/81 | 04/82 | 09/82 | 04/83 | 52 | 543 | 331 | 331 | V | (7) | 0.80 | (17) | 0.80 | (17) | 300 | 300 | 47 | 19 | (F) | |
Santa Eugenia | Spain | H | Xallas | 17 | 01/87 | 06/87 | 06/88 | 10/88 | 84 | 290 | 225 | 254 | 0.05 | (3) | 0.75 0.35 | (3)* (3)* | 0.75 | (1) | 250 | 250 | 88 72 | 152 145 | (F) | |
Nunome | Japan | F W | Nunome | 17 | 05/86 | 01/88 | 10/88 | 12/89 | 72 | 322 | 110 | 330 | V 0.40 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 78 | 42 | (F) | |
Hayachine | Japan | F H I W | Hienuki | 17 | 03/93 | 10/95 | 06/98 | 03/00 | 74 | 333 | 141 | 333 | V 0.20 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 84 | 36 | (F) | |
Rosal | Brazil | H | Itabapoana | 17 | 04/98 | - /98 | 09/99 | - /00 | 37 | 212 | 45 | 75 | (1) | (3)* | (1)* | 300 | 300 | 45 | 55 | (S) | ||||
Tannur | Jordan | I | Wadi al Hasa | 17 | 02/99 | 12/99 | 12/00 | 09/01 | 60 | 270 | 250 | 250 | V 1.00 | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 1200 | 125 120 | 75 50 | (N) | |
Koyama | Japan | F I W | Ohkita | 17 | 11/94 | 05/00 | 12/02 | 03/05 | 65 | 462 | 270 | 531 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (S) | |
Changtan [A] | China | H | Tuwushui | 17 | - /03 | - /03 | - /04 | - /04 | 53 | 124 | 29 | |||||||||||||
Pindobaçu | Brazil | I W | Itapicuru-aço | 17 | - /01 | - /03 | - /04 | - /05 | 45 | 191 | 75 | 85 | 300 | 300 | 56 | 14 | (N) | |||||||
Yongdingqiao | China | Liushahe | 17 | - /05 | - /07 | - /10 | - /12 | 123 | ||||||||||||||||
Santo Antonio | Brazil | H | Rio Grande | 17 | - /09 | - /10 | - /11 | 02/12 | 44 | 285 | 81 | 105 | ||||||||||||
Ivan Botelho I (fomerly Ponte) | Brazil | H | Pomba | 17 | - /10 | - /11 | - /12 | - /13 | 32 | |||||||||||||||
Uludere | Turkey | H | Ortasu | 17 | - /08 | - /12 | - /16 | - /18 | 77 | 431 | 800 | 887 | 0.10 | (1) | 0.80 | (1) | 300 | 300 | 95 | 45 | (N) | |||
Rkiza | Morocco | F I W | 17 | - /13 | - /15 | - /16 | - /17 | 26 | 500 | 55 | 60 | V | (5) | 0.85 | (1)* | 0.85 | (1)* | |||||||
Ximihe | China | H I W | Ximihe | 17 | - /14 | - /16 | - /17 | - /18 | 88 | 147 | ||||||||||||||
Ain Ksob | Morocco | Daliya | 17 | - /15 | - /17 | - /18 | - /19 | 47 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control / Recreation
River: Willow Creek
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 11/81
Start of RCC: 11/81
End of RCC: 09/82
End of Project: 04/83
Specifications
Height: 52 metres
Length: 543 metres
Volume of RCC: 331 m3x103
Total volume: 331 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.80 | Unformed face of RCC |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
47 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
19 | Low-lime flyash (ASTM Class F) |
Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Xallas
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 01/87
Start of RCC: 01/87
End of RCC: 06/88
End of Project: 10/88
Specifications
Height: 84 metres
Length: 290 metres
Volume of RCC: 225 m3x103
Total volume: 254 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.05 | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
0.35 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
88 |
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
152 | Low-lime flyash (ASTM Class F) |
145 |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Nunome
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 05/86
Start of RCC: 05/86
End of RCC: 10/88
End of Project: 12/89
Specifications
Height: 72 metres
Length: 322 metres
Volume of RCC: 110 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.40 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
78 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
42 | Low-lime flyash (ASTM Class F) |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Hienuki
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: 06/98
End of Project: 03/00
Specifications
Height: 74 metres
Length: 333 metres
Volume of RCC: 141 m3x103
Total volume: 333 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Itabapoana
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 09/99
End of Project: -/00
Specifications
Height: 37 metres
Length: 212 metres
Volume of RCC: 45 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
45 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
55 | Ground-granulated blast-furnace slag |
Details
Country: Jordan
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Wadi al Hasa
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 02/99
Start of RCC: 02/99
End of RCC: 12/00
End of Project: 09/01
Specifications
Height: 60 metres
Length: 270 metres
Volume of RCC: 250 m3x103
Total volume: 250 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
1.00 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
125 |
120 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
75 | Natural pozzolan (ASTM Class N) |
50 |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ohkita
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 11/94
Start of RCC: 11/94
End of RCC: 12/02
End of Project: 03/05
Specifications
Height: 65 metres
Length: 462 metres
Volume of RCC: 270 m3x103
Total volume: 531 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Ground-granulated blast-furnace slag |
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Tuwushui
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/04
End of Project: -/04
Specifications
Height: 53 metres
Length: 124 metres
Volume of RCC: -
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-aço
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 45 metres
Length: 191 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
14 | Natural pozzolan (ASTM Class N) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Liushahe
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/10
End of Project: -/12
Specifications
Height: 123 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Rio Grande
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: 02/12
Specifications
Height: 44 metres
Length: 285 metres
Volume of RCC: 81 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Pomba
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 32 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Ortasu
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/16
End of Project: -/18
Specifications
Height: 77 metres
Length: 431 metres
Volume of RCC: 800 m3x103
Total volume: 887 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
95 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | Natural pozzolan (ASTM Class N) |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: -
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/17
Specifications
Height: 26 metres
Length: 500 metres
Volume of RCC: 55 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.85 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.85 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Ximihe
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 88 metres
Length: 147 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): unknown
River: Daliya
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 47 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates