Dam Search Results
- Reservoir Capacity: 37 m3x106
 
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Upper Stillwater | USA | I W | Rock Creek | 37 | 12/83 | 09/85 | 08/87 | 12/87 | 91 | 815 | 1125 | 1281 | V | (14) | 0.32 0.60  | (14) (14)  | 0.32 0.60  | (14)* (14)*  | 300 | 300 | 79 | 173 | (F) | |
| Pedro Moura Junior (formerly Belo Jardim) | Brazil | W | Ipojuca (Gravata) | 37 | 05/95 | 09/96 | - /97 | - /98 | 56 | 380 | 113 | 125 | (1) | (1)* | (1)* | 300 | 300 | 64 | 16 | (N) | ||||
| Bab Louta | Morocco | W | Bous Sbaa | 37 | 01/97 | 02/98 | 02/99 | 03/99 | 54 | 110 | 63 | 77 | V | (5) | 0.75 | (1)* | 0.75 | (13) | 300 | 300 | 65 80  | 15 20  | (N) | |
| Teesta low dam (Stage IV) | India | H | Teesta | 37 | 05/06 | 01/13 | 05/15 | 08/16 | 45 | 196 | 167 | 170 | 0.40 | (3')* | 0.80 | (3')* | separate | 300 | 300 | 85 | 135 | (F) | ||
| Cerro del Águila | Peru | H | Mantaro | 37 | 11/12 | 08/14 | 06/15 | - /16 | 89 | 270 | 250 | 450 | 0.10 | (1) | 0.75 | (1)* | 0.75 | (12) | 300 | 600 | 115 | 23 | ||
| Shuishimen [A]  | China | Tianhe | 37 | - /13 | - /14 | - /15 | - /16 | 86 | 150 | |||||||||||||||
| Hekou [A]  | China | 37 | - /17 | - /19 | 12/21 | - /22 | 83 | 193 | ||||||||||||||||
| Göle Durançam | Turkey | I | Kür Çayı | 37 | - /16 | - /19 | - /23 | - /24 | 22 | 107 | 22 | V | 0.70 | |||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Rock Creek
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 08/87
End of Project: 12/87
Specifications
Height: 91 metres
Length: 815 metres
Volume of RCC: 1125 m3x103
Total volume: 1281 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Slip-formed/extruded facing elements | 
Downstream
| Slope | Type | 
|---|---|
| 0.32 | Slip-formed/extruded facing elements | 
| 0.60 | Slip-formed/extruded facing elements | 
Spillway
| Slope | Type | 
|---|---|
| 0.32 | Slip-formed/extruded facing elements [stepped face] | 
| 0.60 | Slip-formed/extruded facing elements [stepped face] | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 79 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 173 | Low-lime flyash (ASTM Class F) | 

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Ipojuca (Gravata)
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 56 metres
Length: 380 metres
Volume of RCC: 113 m3x103
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
| Traditional concrete against formwork | 
Downstream
| Slope | Type | 
|---|---|
| Traditional concrete against formwork [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| Traditional concrete against formwork [stepped face] | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 64 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 16 | Natural pozzolan (ASTM Class N) | 

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Bous Sbaa
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 01/97
Start of RCC: 01/97
End of RCC: 02/99
End of Project: 03/99
Specifications
Height: 54 metres
Length: 110 metres
Volume of RCC: 63 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Traditional concrete against precast concrete panels | 
Downstream
| Slope | Type | 
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 65 | 
| 80 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 15 | Natural pozzolan (ASTM Class N) | 
| 20 | 

Details
Country: India
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Teesta
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: 05/15
End of Project: 08/16
Specifications
Height: 45 metres
Length: 196 metres
Volume of RCC: 167 m3x103
Total volume: 170 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
| 0.40 | RCC against formwork (GEVR/GE-RCC) [stepped face] | 
Downstream
| Slope | Type | 
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| separate | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 85 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 135 | Low-lime flyash (ASTM Class F) | 

Details
Country: Peru
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Mantaro
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 11/12
Start of RCC: 11/12
End of RCC: 06/15
End of Project: -/16
Specifications
Height: 89 metres
Length: 270 metres
Volume of RCC: 250 m3x103
Total volume: 450 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
| 0.10 | Traditional concrete against formwork | 
Downstream
| Slope | Type | 
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 600 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 115 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 23 | |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Tianhe
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 86 metres
Length: -
Volume of RCC: -
Total volume: 150 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: -
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: 12/21
End of Project: -/22
Specifications
Height: 83 metres
Length: 193 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Kür Çayı
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 22 metres
Length: 107 metres
Volume of RCC: 22 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | 
Downstream
| Slope | Type | 
|---|---|
| 0.70 | 
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates
