Dam Search Results
- Dimensions
- Height: 55 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Shiromizugawa | Japan | F I | Shiromizu | 5 | 10/84 | 10/85 | 06/88 | 04/90 | 55 | 367 | 142 | 314 | V | (1) | 0.80 | (1) | 0.80 | (1) | 150 - 200 | 500 | 96 | 24 | (F) | |
| Daguangba | China | H I W | Changhuajiang | 1710 | 06/90 | 12/91 | 12/93 | 07/95 | 55 | 827 | 485 | 860 | V | (1) | 0.75 | (10) (3) | 0.75 | (1) | 300 | 300 | 55 | 96 | (F) | |
| Sahla | Morocco | I W | Sahla | 62 | 05/92 | 11/92 | 12/93 | 07/94 | 55 | 160 | 130 | 160 | 0.20 | (5) | 0.90 | (1)* | 0.80 | (1)* | 300 | 300 | 85 125 | 15 25 | (N) | |
| Bouhouda | Morocco | I W | Sraa | 56 | 05/95 | 04/96 | 05/98 | 09/98 | 55 | 174 | 165 | 186 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 120 | 0 0 | (N) | |
| Hongpo [A-G] | China | W | Qinggoushui | 3 | 10/97 | 07/98 | 11/99 | 12/99 | 55 | 244 | 71 | 77 | V | (3') | 0.50 | (1) | 0.50 | (1) | 300 | 3000 | 54 | 99 | (F) | |
| João Leite | Brazil | W | João Leite | 129 | 03/01 | 01/03 | - /04 | - /04 | 55 | 380 | 270 | 290 | 300 | 300 | 80 | 20 | (N) | |||||||
| Hickory Log Creek | USA | W | Hickory Log Creek | 1 | 10/05 | 12/06 | 06/07 | 10/07 | 55 | 290 | 165 | V | (8) | 0.80 | (3')* | 0.80 | (1) | 300 | 300 | 89 80 74 | 89 98 104 | (F) | ||
| Dinh Binh | Vietnam | F H I W | Kon | 226 | 05/02 | 08/05 | 12/07 | 12/08 | 55 | 571 | 183 | 430 | V | (11) | 0.75 | (3') | ogee | (12) | 300 | 900 | 70 126 | 175 141 | (F) | |
| Binh Dien | Vietnam | H | Huu Trach | 424 | - /06 | - /07 | - /08 | - /09 | 55 | 571 | 189 | 423 | 300 | 300 | 70 | 105 | (F) | |||||||
| Sefaköy | Turkey | H | Aras | 21 | - /08 | - /10 | - /11 | 10/11 | 55 | 148 | 120 | (1) | (1) | |||||||||||
| Panelas II | Brazil | W | 23 | - /16 | - /17 | 06/19 | - /20 | 55 | ||||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Shiromizu
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 10/84
Start of RCC: 10/84
End of RCC: 06/88
End of Project: 04/90
Specifications
Height: 55 metres
Length: 367 metres
Volume of RCC: 142 m3x103
Total volume: 314 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 500 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Changhuajiang
Reservoir capacity: 1710 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 12/93
End of Project: 07/95
Specifications
Height: 55 metres
Length: 827 metres
Volume of RCC: 485 m3x103
Total volume: 860 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
| RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sahla
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 05/92
Start of RCC: 05/92
End of RCC: 12/93
End of Project: 07/94
Specifications
Height: 55 metres
Length: 160 metres
Volume of RCC: 130 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 25 |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sraa
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: 05/98
End of Project: 09/98
Specifications
Height: 55 metres
Length: 174 metres
Volume of RCC: 165 m3x103
Total volume: 186 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |
| 0 |

Details
Country: China
Owner: -
Type: Arch-Gravity
Purpose(s): Water Supply
River: Qinggoushui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 11/99
End of Project: 12/99
Specifications
Height: 55 metres
Length: 244 metres
Volume of RCC: 71 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: João Leite
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: 03/01
Start of RCC: 03/01
End of RCC: -/04
End of Project: -/04
Specifications
Height: 55 metres
Length: 380 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Hickory Log Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/05
Start of RCC: 10/05
End of RCC: 06/07
End of Project: 10/07
Specifications
Height: 55 metres
Length: 290 metres
Volume of RCC: 165 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| 80 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |
| 98 104 |

Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kon
Reservoir capacity: 226 m3x106
Construction Dates
Start of Project: 05/02
Start of RCC: 05/02
End of RCC: 12/07
End of Project: 12/08
Specifications
Height: 55 metres
Length: 571 metres
Volume of RCC: 183 m3x103
Total volume: 430 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 126 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 175 | Low-lime flyash (ASTM Class F) |
| 141 |

Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Huu Trach
Reservoir capacity: 424 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 55 metres
Length: 571 metres
Volume of RCC: 189 m3x103
Total volume: 423 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 105 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Aras
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: 10/11
Specifications
Height: 55 metres
Length: 148 metres
Volume of RCC: 120 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 06/19
End of Project: -/20
Specifications
Height: 55 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates
