SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
La Puebla de CazallaSpainICorbones7403/8808/8910/9112/9171220205220V
0.20
(3)
(3)
0.80(3)*0.80(3)*30030080130(F)
Tamesna (formerly Boukerkour)MoroccoF I WZamrine5605/0304/0409/0405/05662201902150.20(5)0.80(1)*0.80(1)*3003001000(N)
JahginIranF I WJahgin30012/0105/0405/0509/0778220232382V
0.30
(3')
(3')*
0.75(3')*0.75(12)300300105
160
90
90
(N)
Engenheiro Ernesto Jorge DreherBrazilHIvaí4- /07- /08- /0804/09232202935        6817(N)
CajuBrazilHRio Grande10- /09- /09- /1003/11382206682           
Tang e MashoorehIranF I WKaskkan55- /13- /22- /28- /2973220             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Corbones

Reservoir capacity: 74 m3x106

Construction Dates

Start of Project: 03/88

Start of RCC: 03/88

End of RCC: 10/91

End of Project: 12/91

Specifications

Height: 71 metres

Length: 220 metres

Volume of RCC: 205 m3x103

Total volume: 220 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
0.20RCC against formwork
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
  
La Puebla de Cazalla completed
La Puebla de Cazalla completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Zamrine

Reservoir capacity: 56 m3x106

Construction Dates

Start of Project: 05/03

Start of RCC: 05/03

End of RCC: 09/04

End of Project: 05/05

Specifications

Height: 66 metres

Length: 220 metres

Volume of RCC: 190 m3x103

Total volume: 215 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0Natural pozzolan (ASTM Class N)
  
Tamesna (formerly Boukerkour) completed
Tamesna (formerly Boukerkour) completed

Full Dam Information

Details

Country: Iran

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Jahgin

Reservoir capacity: 300 m3x106

Construction Dates

Start of Project: 12/01

Start of RCC: 12/01

End of RCC: 05/05

End of Project: 09/07

Specifications

Height: 78 metres

Length: 220 metres

Volume of RCC: 232 m3x103

Total volume: 382 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.30RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
105
160
Pozzolan (kg/m3)Pozzolan Type
90Natural pozzolan (ASTM Class N)
90 
Jahgin completed
Jahgin completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ivaí

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: 04/09

Specifications

Height: 23 metres

Length: 220 metres

Volume of RCC: 29 m3x103

Total volume: 35 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
68
Pozzolan (kg/m3)Pozzolan Type
17Natural pozzolan (ASTM Class N)
  
Engenheiro Ernesto Jorge Dreher completed
Engenheiro Ernesto Jorge Dreher completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Rio Grande

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/10

End of Project: 03/11

Specifications

Height: 38 metres

Length: 220 metres

Volume of RCC: 66 m3x103

Total volume: 82 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Caju under construction
Caju under construction

Full Dam Information

Details

Country: Iran

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Kaskkan

Reservoir capacity: 55 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/28

End of Project: -/29

Specifications

Height: 73 metres

Length: 220 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates