Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Guangzhao | China | H | Beipan | 3245 | 10/04 | 02/06 | 05/08 | - /09 | 201 | 412 | 2420 | 280 | V 0.25 | (9) | 0.75 | (1) | 0.75 | (1) | 300 | 300 | 61 71 | 91 87 | (F) | |
Maojiahe | China | H | Beipan | 13 | - /06 | - /07 | - /08 | - /08 | 75 | 1166 | ||||||||||||||
Mamaya Nº1 | China | H | Beipan | 137 | - /08 | - /10 | - /13 | - /14 | 109 | 250 | 591 | |||||||||||||
Shannipo [A] | China | H | Beipan | 85 | - /09 | - /11 | - /13 | - /15 | 119 | 205 | 199 | 267 | curve | (3') | curve | (3) | ogee | (3) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 3245 m3x106
Construction Dates
Start of Project: 10/04
Start of RCC: 10/04
End of RCC: 05/08
End of Project: -/09
Specifications
Height: 201 metres
Length: 412 metres
Volume of RCC: 2420 m3x103
Total volume: 280 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with hot poured membrane |
0.25 |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
61 |
71 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
91 | Low-lime flyash (ASTM Class F) |
87 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/08
Specifications
Height: 75 metres
Length: 1166 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 137 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/13
End of Project: -/14
Specifications
Height: 109 metres
Length: 250 metres
Volume of RCC: -
Total volume: 591 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/15
Specifications
Height: 119 metres
Length: 205 metres
Volume of RCC: 199 m3x103
Total volume: 267 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork |
Spillway
Slope | Type |
---|---|
ogee | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|