Dam Search Results
- Dimensions
- Height: 103 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Al Wehdah | Jordan/ Syria | W | Yarmouk | 110 | 06/03 | 02/05 | 07/06 | 12/07 | 103 | 485 | 1426 | 1478 | V 0.60 | (3') | 0.80 | (3')* | 0.80 | 300 | 300 | 70 60 | 60 60 | (F) | ||
Wuyi | China | Dina | 99 | - /05 | - /07 | - /10 | - /12 | 103 | ||||||||||||||||
San Vicente Dam Raise | USA | W | San Diego | 299 | 06/09 | 08/11 | 09/12 | 09/14 | 103 | 474 | 459 | 465 | V | (4') | 0.78 | (3')* | 0.78 | (3')* | 300 | 300 | 86 | 127 | (F) | |
Upper Paung Laung | Myanmar | H | Paung Laung | 1300 | 01/06 | 01/11 | 12/13 | - /14 | 103 | 530 | 936 | 1100 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 90 | 140 | (N) | |
Gokayama | Japan | F N W | Naka | 40 | 06/12 | 06/14 | 07/15 | 03/18 | 103 | 556 | 634 | 935 | V 1.00 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 1000 | 104 | 26 | (F) | |
Enciso | Spain | I W | Cidacos | 47 | - /08 | 08/14 | 07/17 | 09/18 | 103 | 376 | 695 | 765 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 60 | 140 | (F) | |
Caculo-Cabaça | Angola | H | Kwanza | 436 | 08/17 | - /20 | - /23 | 03/24 | 103 | 553 | 1075 | 1450 | V | 0.85 | 0.85 | 300 | 2400 | 100 | 0 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Jordan/ Syria
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Yarmouk
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 06/03
Start of RCC: 06/03
End of RCC: 07/06
End of Project: 12/07
Specifications
Height: 103 metres
Length: 485 metres
Volume of RCC: 1426 m3x103
Total volume: 1478 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.60 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
60 | Low-lime flyash (ASTM Class F) |
60 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Dina
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/10
End of Project: -/12
Specifications
Height: 103 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: San Diego
Reservoir capacity: 299 m3x106
Construction Dates
Start of Project: 06/09
Start of RCC: 06/09
End of RCC: 09/12
End of Project: 09/14
Specifications
Height: 103 metres
Length: 474 metres
Volume of RCC: 459 m3x103
Total volume: 465 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
86 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
127 | Low-lime flyash (ASTM Class F) |
Details
Country: Myanmar
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Paung Laung
Reservoir capacity: 1300 m3x106
Construction Dates
Start of Project: 01/06
Start of RCC: 01/06
End of RCC: 12/13
End of Project: -/14
Specifications
Height: 103 metres
Length: 530 metres
Volume of RCC: 936 m3x103
Total volume: 1100 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
140 | Natural pozzolan (ASTM Class N) |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Naka
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: 06/12
Start of RCC: 06/12
End of RCC: 07/15
End of Project: 03/18
Specifications
Height: 103 metres
Length: 556 metres
Volume of RCC: 634 m3x103
Total volume: 935 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
1.00 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
104 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
26 | Low-lime flyash (ASTM Class F) |
Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Cidacos
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 07/17
End of Project: 09/18
Specifications
Height: 103 metres
Length: 376 metres
Volume of RCC: 695 m3x103
Total volume: 765 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
140 | Low-lime flyash (ASTM Class F) |
Details
Country: Angola
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Kwanza
Reservoir capacity: 436 m3x106
Construction Dates
Start of Project: 08/17
Start of RCC: 08/17
End of RCC: -/23
End of Project: 03/24
Specifications
Height: 103 metres
Length: 553 metres
Volume of RCC: 1075 m3x103
Total volume: 1450 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.85 |
Spillway
Slope | Type |
---|---|
0.85 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 2400 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | |