Dam Search Results
- Dimensions
- Height: 131 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Jiangya | China | F H I N W | Loushui | 1741 | 07/95 | 10/96 | 04/99 | - /01 | 131 | 368 | 1100 | 1310 | V | (3') | 0.80 | (3)* | ogee 0.80 | (13) | 300 | 3000 | 87 64 46 | 107 96 107 | (F) | |
Lai Chau | Vietnam | H | Song Da (Black River) | 1215 | 06/10 | 03/13 | 05/15 | 07/17 | 131 | 620 | 1884 | 2500 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 60 | 160 | (F) | |
Kafue Gorge Lower (KGL) | Zambia | H | Kafue | 83 | 01/16 | 06/18 | 04/20 | - /20 | 131 | 375 | 1290 | 1390 | 0.20 | (3') | 0.75 | (3') | 0.75 | (12) | 300 | 300 | 60 | 112 | (F) | |
Julius Nyerere (formerly Rufiji) | Tanzania | H | Rufiji | 3680 | 12/18 | 10/20 | - /22 | 12/23 | 131 | 1025 | 1420 | 1940 | 0.20 | (3') | 0.75 | (3') | 0.75 | (12) | 93 | 62 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Loushui
Reservoir capacity: 1741 m3x106
Construction Dates
Start of Project: 07/95
Start of RCC: 07/95
End of RCC: 04/99
End of Project: -/01
Specifications
Height: 131 metres
Length: 368 metres
Volume of RCC: 1100 m3x103
Total volume: 1310 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
0.80 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
87 |
64 46 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
107 | Low-lime flyash (ASTM Class F) |
96 107 |
Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Song Da (Black River)
Reservoir capacity: 1215 m3x106
Construction Dates
Start of Project: 06/10
Start of RCC: 06/10
End of RCC: 05/15
End of Project: 07/17
Specifications
Height: 131 metres
Length: 620 metres
Volume of RCC: 1884 m3x103
Total volume: 2500 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
160 | Low-lime flyash (ASTM Class F) |
Details
Country: Zambia
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Kafue
Reservoir capacity: 83 m3x106
Construction Dates
Start of Project: 01/16
Start of RCC: 01/16
End of RCC: 04/20
End of Project: -/20
Specifications
Height: 131 metres
Length: 375 metres
Volume of RCC: 1290 m3x103
Total volume: 1390 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
112 | Low-lime flyash (ASTM Class F) |
Details
Country: Tanzania
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Rufiji
Reservoir capacity: 3680 m3x106
Construction Dates
Start of Project: 12/18
Start of RCC: 12/18
End of RCC: -/22
End of Project: 12/23
Specifications
Height: 131 metres
Length: 1025 metres
Volume of RCC: 1420 m3x103
Total volume: 1940 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
93 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
62 | Low-lime flyash (ASTM Class F) |