Dam Search Results
- Dimensions
- Height: 23 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Carroll E. Ecton - formerly Winchester | USA | W | Upper Howard Creek | 2 | 06/84 | 08/84 | 11/84 | 01/85 | 23 | 363 | 24 | 27 | V | (6) | V 1.00 | (5) (17) | 1.00 | (1) | 300 | 300 | 104 | 0 | (-) - | |
Cachoeirão | Brazil | H | Manhuaçu | - /07 | - /07 | - /08 | - /08 | 23 | 90 | |||||||||||||||
Engenheiro Ernesto Jorge Dreher | Brazil | H | Ivaí | 4 | - /07 | - /08 | - /08 | 04/09 | 23 | 220 | 29 | 35 | 68 | 17 | (N) | |||||||||
Autódromo | Brazil | H | Carreiro | 4 | - /10 | - /10 | - /11 | - /11 | 23 | 200 | 21 | 47 | 67 | 17 | (N) | |||||||||
Rastro de Auto | Brazil | H | Forqueta | - /11 | - /11 | - /13 | - /13 | 23 | 190 | |||||||||||||||
Piedra Puntuda | Nicaragua | H | Río Mico | - /15 | - /16 | - /17 | - /18 | 23 | 0.70 1.00 | (5) (5) | 0.70 1.00 | (1)* (1)* | 0.70 | (1)* | ||||||||||
Çamoluk Alısız | Turkey | I | Alısızın Deresi | 1 | - /16 | - /16 | - /17 | - /18 | 23 | 83 | 14 | V | 0.70 | 0.70 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Upper Howard Creek
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/84
Start of RCC: 06/84
End of RCC: 11/84
End of Project: 01/85
Specifications
Height: 23 metres
Length: 363 metres
Volume of RCC: 24 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
1.00 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
1.00 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
104 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Manhuaçu
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: -/08
Specifications
Height: 23 metres
Length: 90 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Ivaí
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 04/09
Specifications
Height: 23 metres
Length: 220 metres
Volume of RCC: 29 m3x103
Total volume: 35 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
68 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
17 | Natural pozzolan (ASTM Class N) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/11
End of Project: -/11
Specifications
Height: 23 metres
Length: 200 metres
Volume of RCC: 21 m3x103
Total volume: 47 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
67 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
17 | Natural pozzolan (ASTM Class N) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Forqueta
Reservoir capacity: -
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/13
Specifications
Height: 23 metres
Length: 190 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Nicaragua
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Río Mico
Reservoir capacity: -
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 23 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.70 | Traditional concrete against precast concrete panels |
1.00 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
1.00 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Alısızın Deresi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/17
End of Project: -/18
Specifications
Height: 23 metres
Length: 83 metres
Volume of RCC: 14 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.70 |
Spillway
Slope | Type |
---|---|
0.70 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again