Dam Search Results
- Purposes: Navigation
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Tongjiezi (with Niurixigou saddle dam) | China | F H I N | Dadu | 200 | 01/85 | 10/88 | 12/89 | 10/94 | 88 | 284 | 407 | 855 | V | (1) | 0.75 | (10) | 0.75 | (1) | 300 - 500 | 300 - 500 | 79 82 | 79 83 | (F) | |
Yantan | China | F H N | Hongshui | 34 | 03/85 | 02/89 | 03/92 | 12/95 | 110 | 525 | 626 | 905 | V | (1) | V 0.80 | (1) (1)* | ogee | (1) | 300 | 300 | 55 | 104 | (F) | |
Shuikou | China | F H N | Min | 2613 | 03/87 | 10/90 | 05/92 | 05/95 | 101 | 791 | 600 | 1710 | V | (1) | 0.73 | (1) | ogee | (1) | 200 - 330 | 200 - 330 | 60 70 | 110 90 | (F) | |
Wan’an | China | F H I N | Gan | 2216 | 11/84 | 12/90 | 12/92 | 06/94 | 68 | 1104 | 156 | 1480 | V | (1) | 0.80 | (1) | ogee | (1) | 300 | 300 | 65 | 105 | (F) | |
Shuidong | China | H N | Youxi | 108 | 04/91 | 11/92 | 10/93 | 12/95 | 63 | 197 | 126 | 184 | V | (7) | 0.75 | (10) | 0.75 | (1) | 300 | 300 | 50 | 90 | (F) | |
Bailongtan | China | H I N | Hongshuihe | 340 | 02/93 | 10/95 | 04/96 | 08/97 | 34 | 710 | 62 | 80 | V | (1) | 0.70 | (10)* | 0.70 | (5)* | 300 | 300 | 73 99 | 110 60 | (F) | |
Jiangya | China | F H I N W | Loushui | 1741 | 07/95 | 10/96 | 04/99 | - /01 | 131 | 368 | 1100 | 1310 | V | (3') | 0.80 | (3)* | ogee 0.80 | (13) | 300 | 3000 | 87 64 46 | 107 96 107 | (F) | |
Gaobazhou | China | F H N | Qingjiang | 536 | 05/97 | 11/98 | 04/00 | 01/01 | 57 | 440 | 210 | 940 | V | (9) | 0.75 | (1) | 0.75 | (1) | 300 | 300 | 123 86 | 100 86 | (F) | |
Origawa | Japan | F N | Ori | 15 | 02/93 | 11/96 | 07/00 | 03/04 | 114 | 331 | 673 | 742 | V 0.60 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 750 | 91 | 39 | (F) | |
Mianhuatan | China | F H N W | Ting | 2035 | 04/98 | 12/98 | 11/01 | 04/02 | 111 | 302 | 500 | 615 | V | (9) | 0.75 | (10) | 0.70 | (13) | 300 | 3000 | 82 59 48 | 100 88 88 | (F) | |
Fukuchiyama | Japan | F N W | Fukuti | 3 | 10/98 | - /99 | 12/01 | 03/03 | 65 | 255 | 115 | 201 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) | |
Wanmipo | China | H N | Youshui | 378 | 08/01 | 11/02 | 05/03 | 05/04 | 65 | 238 | 141 | 376 | V | (3') | 0.75 | (12) | ogee | (12) | 300 | 3000 | 86 68 | 103 83 | (F) | |
Takizawa | Japan | F N W | Nakatu | 63 | 03/99 | 10/01 | 06/03 | 03/07 | 139 | 424 | 810 | 1670 | 0.15 0.70 | (1) (1) | 0.72 | (1) | 0.72 | (1) | 250 | 1000 | 84 72 | 36 48 | (F) | |
Letan | China | H I N | Xijiang | 950 | - /02 | - /03 | - /04 | - /05 | 66 | 586 | 50 | 210 | ||||||||||||
Xihe | China | F H N | Hanjiang | 229 | 11/03 | 02/04 | 05/05 | 06/07 | 63 | 346 | 194 | 631 | (F) | |||||||||||
Suofengying | China | F H I N W | Wu | 201 | 10/00 | 06/03 | 08/05 | 03/06 | 122 | 165 | 421 | 739 | V 0.25 | (3') (3') | 0.70 | (3') | 0.70 | (1) | 300 | 3000 | 64 | 95 | (F) | |
Kido | Japan | F I N W | Kido | 19 | 10/00 | 06/03 | 08/05 | 03/08 | 94 | 350 | 291 | 501 | V 0.10 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 1000 | 84 | 36 | (F) | |
Baise | China | F H I N W | Youjiang | 5660 | 12/01 | 12/02 | 04/06 | 07/06 | 130 | 720 | 1995 | 2672 | V | (9) | 0.80 | (1) | 0.80 | (1) | 300 | 3000 | 80 50 | 132 110 | (F) | |
Nagai | Japan | F H N W | Okitamano | 51 | 03/00 | 10/02 | 11/06 | 03/11 | 126 | 381 | 703 | 1200 | V 0.50 | (1) (1) | 0.73 | (1) | 0.73 | (1) | 250 | 1000 | 91 | 39 | (F) | |
Zaoshi | China | F H N W | Dieshui | 1439 | - /04 | - /05 | - /06 | - /07 | 88 | 351 | 450 | 930 | V 0.25 | (3') | 0.80 | (3') | 0.75 | (1) | 300 | 3000 | 53 83 | 99 102 | (F) | |
Longtan (Stage 1) | China | F H N W | Hongshui | 16210 | 07/01 | 10/04 | 06/07 | 12/09 | 192 | 832 | 4623 | 7400 | V 0.25 | (3') | 0.70 | (3') | 0.68 | (12) | 300 | 300 | 99 86 | 121 109 | (F) | |
Yumen | China | F H N | Luohe | 28 | - /05 | - /06 | - /07 | - /08 | 62 | 244 | 133 | 234 | ||||||||||||
Silin | China | F H I N | Wujiang | 1593 | 11/05 | 11/06 | 03/08 | - /09 | 117 | 310 | 825 | 1100 | V | (1) | 0.70 | (1) | 0.70 | (1) | 66 89 | 100 109 | (F) | |||
Jin’anqiao | China | H N R | Jinsha | 913 | 12/03 | 05/07 | - /10 | - /11 | 160 | 640 | 2400 | 4430 | V | (3) | 0.75 | (3) | 0.75 | (1) | 72 96 | 108 117 | (F) | |||
Lechangxia | China | H I N | Bei | 374 | - /08 | - /09 | - /10 | - /11 | 85 | 256 | ||||||||||||||
Madushan | China | H N W | Honghe | 552 | - /08 | - /09 | - /11 | - /12 | 108 | 353 | 987 | |||||||||||||
Longkaikou | China | F H N R W | Jinsha | 558 | 08/07 | 09/08 | - /12 | - /13 | 119 | 768 | 2840 | 3853 | V | (3) | 0.75 | (3) | 300 | 3000 | 96 60 | 96 90 | (F) | |||
Shatuo | China | F H N | Wu | 910 | 05/06 | - /10 | - /12 | - /13 | 101 | 631 | 1510 | 1980 | V 0.15 | (3') | 0.75 | (3') | 0.75 | (3) | 300 | 3000 | ||||
Guanyinyan | China | F H N R | Jinsha | 2263 | - /08 | 09/11 | 05/14 | - /16 | 159 | 1250 | 6473 | 9364 | V 0.10 | (3') | 0.75 | (3') | 0.75 | (1) | 300 | 53 | 99 | (F) | ||
Gokayama | Japan | F N W | Naka | 40 | 06/12 | 06/14 | 07/15 | 03/18 | 103 | 556 | 634 | 935 | V 1.00 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 1000 | 104 | 26 | (F) | |
Yamba | Japan | F H I N W | Agatsuma | 108 | 08/14 | 05/17 | 05/19 | 10/19 | 116 | 291 | 911 | 0.15 | (1) | 0.80 | (1) | 0.08 | (1) | 250 | 1000 | 84 | 36 | (F) | ||
Toga | Japan | F I N | Toga | 31 | - /17 | - /19 | - /21 | - /22 | 112 | 232 | 570 | 0.10 0.60 | (1) (1) | 0.69 | (1) | 0.69 | (1) | |||||||
Biratori | Japan | F H I N W | Nukabira | 46 | - /13 | - /17 | - /22 | - /24 | 57 | 600 | 180 | V | (1) | 0.78 | (1) | 0.78 | (1) | |||||||
Tingzikou | China | F H I N W | Jialing | 4067 | 11/09 | - /19 | - /22 | - /25 | 116 | 995 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Dadu
Reservoir capacity: 200 m3x106
Construction Dates
Start of Project: 01/85
Start of RCC: 01/85
End of RCC: 12/89
End of Project: 10/94
Specifications
Height: 88 metres
Length: 284 metres
Volume of RCC: 407 m3x103
Total volume: 855 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 - | 300 - |
500 | 500 |
Cementitious material
Cement (kg/m3) |
---|
79 |
82 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
79 | Low-lime flyash (ASTM Class F) |
83 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Hongshui
Reservoir capacity: 34 m3x106
Construction Dates
Start of Project: 03/85
Start of RCC: 03/85
End of RCC: 03/92
End of Project: 12/95
Specifications
Height: 110 metres
Length: 525 metres
Volume of RCC: 626 m3x103
Total volume: 905 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
104 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Min
Reservoir capacity: 2613 m3x106
Construction Dates
Start of Project: 03/87
Start of RCC: 03/87
End of RCC: 05/92
End of Project: 05/95
Specifications
Height: 101 metres
Length: 791 metres
Volume of RCC: 600 m3x103
Total volume: 1710 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.73 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
200 - | 200 - |
330 | 330 |
Cementitious material
Cement (kg/m3) |
---|
60 |
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
110 | Low-lime flyash (ASTM Class F) |
90 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Gan
Reservoir capacity: 2216 m3x106
Construction Dates
Start of Project: 11/84
Start of RCC: 11/84
End of RCC: 12/92
End of Project: 06/94
Specifications
Height: 68 metres
Length: 1104 metres
Volume of RCC: 156 m3x103
Total volume: 1480 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
105 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Navigation
River: Youxi
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 04/91
Start of RCC: 04/91
End of RCC: 10/93
End of Project: 12/95
Specifications
Height: 63 metres
Length: 197 metres
Volume of RCC: 126 m3x103
Total volume: 184 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
50 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
90 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Navigation
River: Hongshuihe
Reservoir capacity: 340 m3x106
Construction Dates
Start of Project: 02/93
Start of RCC: 02/93
End of RCC: 04/96
End of Project: 08/97
Specifications
Height: 34 metres
Length: 710 metres
Volume of RCC: 62 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | RCC against precast concrete blocks [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against precast concrete panels [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
73 |
99 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
110 | Low-lime flyash (ASTM Class F) |
60 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Loushui
Reservoir capacity: 1741 m3x106
Construction Dates
Start of Project: 07/95
Start of RCC: 07/95
End of RCC: 04/99
End of Project: -/01
Specifications
Height: 131 metres
Length: 368 metres
Volume of RCC: 1100 m3x103
Total volume: 1310 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
0.80 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
87 |
64 46 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
107 | Low-lime flyash (ASTM Class F) |
96 107 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Qingjiang
Reservoir capacity: 536 m3x106
Construction Dates
Start of Project: 05/97
Start of RCC: 05/97
End of RCC: 04/00
End of Project: 01/01
Specifications
Height: 57 metres
Length: 440 metres
Volume of RCC: 210 m3x103
Total volume: 940 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
123 |
86 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |
86 |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation
River: Ori
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 02/93
Start of RCC: 02/93
End of RCC: 07/00
End of Project: 03/04
Specifications
Height: 114 metres
Length: 331 metres
Volume of RCC: 673 m3x103
Total volume: 742 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.77 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.77 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Ting
Reservoir capacity: 2035 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 11/01
End of Project: 04/02
Specifications
Height: 111 metres
Length: 302 metres
Volume of RCC: 500 m3x103
Total volume: 615 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
82 |
59 48 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |
88 88 |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Fukuti
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: 12/01
End of Project: 03/03
Specifications
Height: 65 metres
Length: 255 metres
Volume of RCC: 115 m3x103
Total volume: 201 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Navigation
River: Youshui
Reservoir capacity: 378 m3x106
Construction Dates
Start of Project: 08/01
Start of RCC: 08/01
End of RCC: 05/03
End of Project: 05/04
Specifications
Height: 65 metres
Length: 238 metres
Volume of RCC: 141 m3x103
Total volume: 376 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Spillway
Slope | Type |
---|---|
ogee | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
86 |
68 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
103 | Low-lime flyash (ASTM Class F) |
83 |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Nakatu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 03/99
Start of RCC: 03/99
End of RCC: 06/03
End of Project: 03/07
Specifications
Height: 139 metres
Length: 424 metres
Volume of RCC: 810 m3x103
Total volume: 1670 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork |
0.70 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.72 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.72 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
48 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Navigation
River: Xijiang
Reservoir capacity: 950 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 66 metres
Length: 586 metres
Volume of RCC: 50 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Hanjiang
Reservoir capacity: 229 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 05/05
End of Project: 06/07
Specifications
Height: 63 metres
Length: 346 metres
Volume of RCC: 194 m3x103
Total volume: 631 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Wu
Reservoir capacity: 201 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/06
Specifications
Height: 122 metres
Length: 165 metres
Volume of RCC: 421 m3x103
Total volume: 739 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.25 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
95 | Low-lime flyash (ASTM Class F) |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Navigation / Water Supply
River: Kido
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/08
Specifications
Height: 94 metres
Length: 350 metres
Volume of RCC: 291 m3x103
Total volume: 501 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Youjiang
Reservoir capacity: 5660 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 04/06
End of Project: 07/06
Specifications
Height: 130 metres
Length: 720 metres
Volume of RCC: 1995 m3x103
Total volume: 2672 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
80 |
50 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
132 | Low-lime flyash (ASTM Class F) |
110 |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Okitamano
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: 03/00
Start of RCC: 03/00
End of RCC: 11/06
End of Project: 03/11
Specifications
Height: 126 metres
Length: 381 metres
Volume of RCC: 703 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.50 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.73 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.73 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Dieshui
Reservoir capacity: 1439 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 351 metres
Volume of RCC: 450 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.25 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
53 |
83 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
99 | Low-lime flyash (ASTM Class F) |
102 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Hongshui
Reservoir capacity: 16210 m3x106
Construction Dates
Start of Project: 07/01
Start of RCC: 07/01
End of RCC: 06/07
End of Project: 12/09
Specifications
Height: 192 metres
Length: 832 metres
Volume of RCC: 4623 m3x103
Total volume: 7400 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.25 |
Downstream
Slope | Type |
---|---|
0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.68 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
99 |
86 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
121 | Low-lime flyash (ASTM Class F) |
109 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Luohe
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 62 metres
Length: 244 metres
Volume of RCC: 133 m3x103
Total volume: 234 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Wujiang
Reservoir capacity: 1593 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 03/08
End of Project: -/09
Specifications
Height: 117 metres
Length: 310 metres
Volume of RCC: 825 m3x103
Total volume: 1100 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
66 |
89 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |
109 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Navigation / Recreation
River: Jinsha
Reservoir capacity: 913 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: -/10
End of Project: -/11
Specifications
Height: 160 metres
Length: 640 metres
Volume of RCC: 2400 m3x103
Total volume: 4430 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
72 |
96 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
108 | Low-lime flyash (ASTM Class F) |
117 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Navigation
River: Bei
Reservoir capacity: 374 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 85 metres
Length: 256 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Navigation / Water Supply
River: Honghe
Reservoir capacity: 552 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 108 metres
Length: 353 metres
Volume of RCC: -
Total volume: 987 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply
River: Jinsha
Reservoir capacity: 558 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 119 metres
Length: 768 metres
Volume of RCC: 2840 m3x103
Total volume: 3853 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
96 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
96 | Low-lime flyash (ASTM Class F) |
90 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Wu
Reservoir capacity: 910 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: -/12
End of Project: -/13
Specifications
Height: 101 metres
Length: 631 metres
Volume of RCC: 1510 m3x103
Total volume: 1980 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.15 |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation
River: Jinsha
Reservoir capacity: 2263 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 05/14
End of Project: -/16
Specifications
Height: 159 metres
Length: 1250 metres
Volume of RCC: 6473 m3x103
Total volume: 9364 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.10 |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 |
Cementitious material
Cement (kg/m3) |
---|
53 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
99 | Low-lime flyash (ASTM Class F) |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Naka
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: 06/12
Start of RCC: 06/12
End of RCC: 07/15
End of Project: 03/18
Specifications
Height: 103 metres
Length: 556 metres
Volume of RCC: 634 m3x103
Total volume: 935 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
1.00 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
104 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
26 | Low-lime flyash (ASTM Class F) |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Agatsuma
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 08/14
Start of RCC: 08/14
End of RCC: 05/19
End of Project: 10/19
Specifications
Height: 116 metres
Length: 291 metres
Volume of RCC: -
Total volume: 911 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.08 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Navigation
River: Toga
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 112 metres
Length: 232 metres
Volume of RCC: -
Total volume: 570 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.69 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.69 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Nukabira
Reservoir capacity: 46 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/22
End of Project: -/24
Specifications
Height: 57 metres
Length: 600 metres
Volume of RCC: -
Total volume: 180 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Jialing
Reservoir capacity: 4067 m3x106
Construction Dates
Start of Project: 11/09
Start of RCC: 11/09
End of RCC: -/22
End of Project: -/25
Specifications
Height: 116 metres
Length: 995 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again