NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Dona FranciscaBrazilHJacuí6308/9806/9910/0012/0063670485503V(1)0.75(3)*0.75(1)*3003007218(N)
TakizawaJapanF N WNakatu6303/9910/0106/0303/0713942481016700.15
0.70
(1)
(1)
0.72(1)0.72(1)250100084
72
36
48
(F)
Feke IITurkeyHGöksu6312/0712/0802/1008/10702561942270.07(6)0.80(3')*separate 30030060
60
60
50
(F)
BurçTurkeyHGöksu6301/0701/12- /15- /17702352322600.07(8)0.80(1)separate 3003006050 to  60(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Jacuí

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 08/98

Start of RCC: 08/98

End of RCC: 10/00

End of Project: 12/00

Specifications

Height: 63 metres

Length: 670 metres

Volume of RCC: 485 m3x103

Total volume: 503 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Dona Francisca completed
Dona Francisca completed

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Navigation / Water Supply

River: Nakatu

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 03/99

Start of RCC: 03/99

End of RCC: 06/03

End of Project: 03/07

Specifications

Height: 139 metres

Length: 424 metres

Volume of RCC: 810 m3x103

Total volume: 1670 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15Traditional concrete against formwork
0.70Traditional concrete against formwork
Downstream
SlopeType
0.72Traditional concrete against formwork
Spillway
SlopeType
0.72Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
84
72
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
48 
Takizawa completed
Takizawa completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 12/07

Start of RCC: 12/07

End of RCC: 02/10

End of Project: 08/10

Specifications

Height: 70 metres

Length: 256 metres

Volume of RCC: 194 m3x103

Total volume: 227 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.07Traditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
60
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
50 
Feke II completed
Feke II completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 01/07

Start of RCC: 01/07

End of RCC: -/15

End of Project: -/17

Specifications

Height: 70 metres

Length: 235 metres

Volume of RCC: 232 m3x103

Total volume: 260 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.07RCC against precast concrete panels with geomembrane
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
50  toLow-lime flyash (ASTM Class F)
  
Burç completed
Burç completed

 