Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Glen Melville | South Africa | W | Ecca | 7 | 02/88 | 04/89 | 12/90 | 04/91 | 32 | 380 | 66 | 114 | V | (1) | V 0.75 | (1) (1)* | 0.75 | (1)* | 330 | 330 | 65 | 65 | (F) | |
Pedro Moura Junior (formerly Belo Jardim) | Brazil | W | Ipojuca (Gravata) | 37 | 05/95 | 09/96 | - /97 | - /98 | 56 | 380 | 113 | 125 | (1) | (1)* | (1)* | 300 | 300 | 64 | 16 | (N) | ||||
João Leite | Brazil | W | João Leite | 129 | 03/01 | 01/03 | - /04 | - /04 | 55 | 380 | 270 | 290 | 300 | 300 | 80 | 20 | (N) | |||||||
El Bolsón | Argentina | I W | Albigasta | 38 | - /08 | - /13 | - /17 | - /19 | 64 | 380 | 279 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Ecca
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 02/88
Start of RCC: 02/88
End of RCC: 12/90
End of Project: 04/91
Specifications
Height: 32 metres
Length: 380 metres
Volume of RCC: 66 m3x103
Total volume: 114 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
330 | 330 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
65 | Low-lime flyash (ASTM Class F) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Ipojuca (Gravata)
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 56 metres
Length: 380 metres
Volume of RCC: 113 m3x103
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: João Leite
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: 03/01
Start of RCC: 03/01
End of RCC: -/04
End of Project: -/04
Specifications
Height: 55 metres
Length: 380 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Natural pozzolan (ASTM Class N) |
Details
Country: Argentina
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Albigasta
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/17
End of Project: -/19
Specifications
Height: 64 metres
Length: 380 metres
Volume of RCC: -
Total volume: 279 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates