NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Los MoralesSpainWMorales206/8602/8710/8712/87282002226V(1)
(3)
0.75(3)*0.75(1)300 -
400
300 -
400
80
74
140
128
(F)
Tirgu JiuRomaniaHJiu208/8606/8805/8912/9324611326 (12) (12)ogee(12)3009001250(-) -
São Gonçalo (formerly Santa Bárbara)BrazilHSanta Bárbara6- /08- /09- /10- /11281541426V 0.75 0.75   6817(N)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Morales

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 06/86

Start of RCC: 06/86

End of RCC: 10/87

End of Project: 12/87

Specifications

Height: 28 metres

Length: 200 metres

Volume of RCC: 22 m3x103

Total volume: 26 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
 RCC against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300  -300  -
400400

Cementitious material

Cement (kg/m3)
80
74
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
128 
Los Morales completed
Los Morales completed

Full Dam Information

Details

Country: Romania

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Jiu

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 08/86

Start of RCC: 08/86

End of RCC: 05/89

End of Project: 12/93

Specifications

Height: 24 metres

Length: 61 metres

Volume of RCC: 13 m3x103

Total volume: 26 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300900

Cementitious material

Cement (kg/m3)
125
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Tirgu Jiu on Google Earth
Tirgu Jiu on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Santa Bárbara

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: -/11

Specifications

Height: 28 metres

Length: 154 metres

Volume of RCC: 14 m3x103

Total volume: 26 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
68
Pozzolan (kg/m3)Pozzolan Type
17Natural pozzolan (ASTM Class N)
  
São Gonçalo (formerly Santa Bárbara) completed
São Gonçalo (formerly Santa Bárbara) completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates