Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Beni Haroun | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | I W | El Kebir | 963 | 01/93 | 10/98 | 07/00 | 12/00 | 118 | 714 | 1690 | 1900 | V | (1) | 0.80 | (1)* | 0.80 | (13) | 300 | 300 | 82 | 143 | (F) |
| Koudiat Acerdoune [H-F] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Wadi Isser | 800 | 11/02 | 05/06 | 06/08 | 09/08 | 121 | 492 | 1650 | 1850 | 0.65 | (1)* | 0.65 | (1)* | 0.65 | (1)* | 300 to 400 | 300 to 400 | 77 | 87 | (F) |
| Boussiaba | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | W | Boussiaba | 120 | 12/06 | 05/08 | 11/08 | 08/09 | 51 | 310 | 160 | 190 | V | (2) | (1)* | (1) | 300 | 300 | 112 | 28 | (F) | ||
| Saf-Saf [H-F] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | F I W | Saf-Saf | 18 | 03/06 | - /08 | 10/09 | 03/11 | 36 | 270 | 120 | 175 | 0.70 | (12) | 0.70 | (7) | 0.70 | (12) | 300 | 300 | 120 | 0 | (-) |
| Tabellout [A-G] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Djen Djen | 294 | 03/10 | 03/13 | 08/15 | 12/15 | 121 | 366 | 975 | (12) | (12) | (12)* | 300 | 300 | 85 | 45 | (S) | ||||
| Ouldjet Mellegue | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Mellegue | 155 | 10/11 | - /13 | - /17 | - /18 | 51 | 900 | 245 | 320 | V | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 110 | 0 | (-) |
| Bouzina | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | I W | 18 | - /14 | 02/18 | 07/19 | 01/23 | 77 | 177 | 250 | 330 | V | (1) | 0.89 | (1)* | 0.89 | (12) | 300 | 300 | 110 77 | 0 33 | (F) | |
| Bouhdid | Algeria | Direction de l’Hydralique de la Wilaya de Annaba | F | Oued Bouhdid | 1 | - /18 | - /19 | 07/25 | - /25 | 30 | 260 | 60 | 0.10 | 0.90 | (1)* | |||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: El Kebir
Reservoir capacity: 963 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 07/00
End of Project: 12/00
Specifications
Height: 118 metres
Length: 714 metres
Volume of RCC: 1690 m3x103
Total volume: 1900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 143 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Wadi Isser
Reservoir capacity: 800 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: 06/08
End of Project: 09/08
Specifications
Height: 121 metres
Length: 492 metres
Volume of RCC: 1650 m3x103
Total volume: 1850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 to | 300 to |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 87 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Water Supply
River: Boussiaba
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: 11/08
End of Project: 08/09
Specifications
Height: 51 metres
Length: 310 metres
Volume of RCC: 160 m3x103
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 112 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 28 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Saf-Saf
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 03/06
Start of RCC: 03/06
End of RCC: 10/09
End of Project: 03/11
Specifications
Height: 36 metres
Length: 270 metres
Volume of RCC: 120 m3x103
Total volume: 175 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Arch-Gravity
Purpose(s): Irrigation / Water Supply
River: Djen Djen
Reservoir capacity: 294 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: 08/15
End of Project: 12/15
Specifications
Height: 121 metres
Length: 366 metres
Volume of RCC: 975 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Ground-granulated blast-furnace slag |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mellegue
Reservoir capacity: 155 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: -/17
End of Project: -/18
Specifications
Height: 51 metres
Length: 900 metres
Volume of RCC: 245 m3x103
Total volume: 320 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: 07/19
End of Project: 01/23
Specifications
Height: 77 metres
Length: 177 metres
Volume of RCC: 250 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.89 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.89 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Low-lime flyash (ASTM Class F) |
| 33 |

Details
Country: Algeria
Owner: Direction de l’Hydralique de la Wilaya de Annaba
Type: Gravity
Purpose(s): Flood Control
River: Oued Bouhdid
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: 07/25
End of Project: -/25
Specifications
Height: 30 metres
Length: 260 metres
Volume of RCC: -
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates