Dam Search Results
- Reservoir Capacity: 63 m3x106
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Dona Francisca | Brazil | H | Jacuí | 63 | 08/98 | 06/99 | 10/00 | 12/00 | 63 | 670 | 485 | 503 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 300 | 300 | 72 | 18 | (N) | |
Takizawa | Japan | F N W | Nakatu | 63 | 03/99 | 10/01 | 06/03 | 03/07 | 139 | 424 | 810 | 1670 | 0.15 0.70 | (1) (1) | 0.72 | (1) | 0.72 | (1) | 250 | 1000 | 84 72 | 36 48 | (F) | |
Feke II | Turkey | H | Göksu | 63 | 12/07 | 12/08 | 02/10 | 08/10 | 70 | 256 | 194 | 227 | 0.07 | (6) | 0.80 | (3')* | separate | 300 | 300 | 60 60 | 60 50 | (F) | ||
Burç | Turkey | H | Göksu | 63 | 01/07 | 01/12 | - /15 | - /17 | 70 | 235 | 232 | 260 | 0.07 | (8) | 0.80 | (1) | separate | 300 | 300 | 60 | 50 to 60 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Jacuí
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 08/98
Start of RCC: 08/98
End of RCC: 10/00
End of Project: 12/00
Specifications
Height: 63 metres
Length: 670 metres
Volume of RCC: 485 m3x103
Total volume: 503 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Nakatu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 03/99
Start of RCC: 03/99
End of RCC: 06/03
End of Project: 03/07
Specifications
Height: 139 metres
Length: 424 metres
Volume of RCC: 810 m3x103
Total volume: 1670 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork |
0.70 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.72 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.72 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
84 |
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
48 |
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 12/07
Start of RCC: 12/07
End of RCC: 02/10
End of Project: 08/10
Specifications
Height: 70 metres
Length: 256 metres
Volume of RCC: 194 m3x103
Total volume: 227 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.07 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
60 | Low-lime flyash (ASTM Class F) |
50 |
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/15
End of Project: -/17
Specifications
Height: 70 metres
Length: 235 metres
Volume of RCC: 232 m3x103
Total volume: 260 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.07 | RCC against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
50 to | Low-lime flyash (ASTM Class F) |