Dam Search Results
- Dimensions
- Height: 83 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Wanyao | China | F H I W | Dahexi | 223 | 10/93 | 01/95 | 05/97 | 07/97 | 83 | 390 | 320 | 458 | V 0.20 | (1) (1) | 0.70 | (5) | 0.75 | (13) | 300 | 300 | 64 | 96 | (F) | |
| A Vuong | Vietnam | H | Vugia Thubon | 340 | 08/03 | 01/06 | 10/07 | 11/08 | 83 | 240 | 260 | 350 | V | (1) | 0.80 | (1) | 1.00 | (1) | 300 | 300 | 90 | 150 | (N) | |
| Milanhe | China | Milanhe | 41 | - /09 | - /10 | - /12 | - /13 | 83 | ||||||||||||||||
| Huong Dien | Vietnam | H | Bo | 821 | - /10 | - /11 | - /12 | - /13 | 83 | 260 | 400 | 90 | 100 | (N) | ||||||||||
| Chuanjiang | China | Chuanjiang | 98 | - /10 | - /11 | - /13 | - /14 | 83 | ||||||||||||||||
| Metolong | Lesotho | W | South Phuthiatsana | 64 | 09/11 | 08/13 | 11/14 | 04/15 | 83 | 278 | 280 | 314 | (3') | (3') | (3') | 300 | 300 | 60 | 145 | (F) | ||||
| Neckartal | Namibia | I | Fish | 857 | 09/13 | 11/15 | 05/18 | 04/19 | 83 | 520 | 836 | 1043 | 0.20 | (3') | 0.70 | (3')* | 0.70 | (12) | 300 | 300 | 65 65 | 120 45 | (F) | |
| Hekou [A] | China | 37 | - /17 | - /19 | 12/21 | - /22 | 83 | 193 | ||||||||||||||||
| El Tornillito | Honduras | H | Ulua | 242 | - /17 | - /21 | 05/23 | 10/24 | 83 | 440 | ||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dahexi
Reservoir capacity: 223 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 05/97
End of Project: 07/97
Specifications
Height: 83 metres
Length: 390 metres
Volume of RCC: 320 m3x103
Total volume: 458 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Vugia Thubon
Reservoir capacity: 340 m3x106
Construction Dates
Start of Project: 08/03
Start of RCC: 08/03
End of RCC: 10/07
End of Project: 11/08
Specifications
Height: 83 metres
Length: 240 metres
Volume of RCC: 260 m3x103
Total volume: 350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 150 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Milanhe
Reservoir capacity: 41 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/12
End of Project: -/13
Specifications
Height: 83 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Bo
Reservoir capacity: 821 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 83 metres
Length: -
Volume of RCC: 260 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Chuanjiang
Reservoir capacity: 98 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/13
End of Project: -/14
Specifications
Height: 83 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Lesotho
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: South Phuthiatsana
Reservoir capacity: 64 m3x106
Construction Dates
Start of Project: 09/11
Start of RCC: 09/11
End of RCC: 11/14
End of Project: 04/15
Specifications
Height: 83 metres
Length: 278 metres
Volume of RCC: 280 m3x103
Total volume: 314 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Low-lime flyash (ASTM Class F) |

Details
Country: Namibia
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Fish
Reservoir capacity: 857 m3x106
Construction Dates
Start of Project: 09/13
Start of RCC: 09/13
End of RCC: 05/18
End of Project: 04/19
Specifications
Height: 83 metres
Length: 520 metres
Volume of RCC: 836 m3x103
Total volume: 1043 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 45 |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: -
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: 12/21
End of Project: -/22
Specifications
Height: 83 metres
Length: 193 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Ulua
Reservoir capacity: 242 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: 05/23
End of Project: 10/24
Specifications
Height: 83 metres
Length: 440 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates
