Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
ThornleaSouth AfricaIMlazi306/9010/9012/9002/91171351617V(1)0.90(3)*0.90(1)1701703887(S)
Várzea GrandeBrazilWPicuí2110/9310/9410/94- /95311352728 (1) (3)*  3003005614(N)
Gürsöğüt 1TurkeyHSakarya77- /19- /19- /20- /2067135207            

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: South Africa

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Mlazi

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 06/90

Start of RCC: 06/90

End of RCC: 12/90

End of Project: 02/91

Specifications

Height: 17 metres

Length: 135 metres

Volume of RCC: 16 m3x103

Total volume: 17 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.90RCC against formwork  [stepped face]
Spillway
SlopeType
0.90Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
170170

Cementitious material

Cement (kg/m3)
38
Pozzolan (kg/m3)Pozzolan Type
87Ground-granulated blast-furnace slag
  
Thornlea completed
Thornlea completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Picuí

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: 10/93

Start of RCC: 10/93

End of RCC: 10/94

End of Project: -/95

Specifications

Height: 31 metres

Length: 135 metres

Volume of RCC: 27 m3x103

Total volume: 28 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
56
Pozzolan (kg/m3)Pozzolan Type
14Natural pozzolan (ASTM Class N)
  
Várzea Grande completed
Várzea Grande completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Sakarya

Reservoir capacity: 77 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/20

End of Project: -/20

Specifications

Height: 67 metres

Length: 135 metres

Volume of RCC: 207 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Gürsöğüt 1 completed
Gürsöğüt 1 completed

 