Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
YeywaMyanmarHMyitnge260010/0102/0612/0812/1013768024732843V(3')0.80(3')*0.80(12)30030075145(N)
Middle YeywaMyanmarHMyitnge45317/00- /19- /23- /251602441700            
Upper Yeywa (Kyaukme)MyanmarHMyitnge341- /1511/2210/2506/26102266532580V(3')0.80(3')*0.80(12)300300   

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Myanmar

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Myitnge

Reservoir capacity: 2600 m3x106

Construction Dates

Start of Project: 10/01

Start of RCC: 10/01

End of RCC: 12/08

End of Project: 12/10

Specifications

Height: 137 metres

Length: 680 metres

Volume of RCC: 2473 m3x103

Total volume: 2843 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
145Natural pozzolan (ASTM Class N)
  
Yeywa completed
Yeywa completed

Full Dam Information

Details

Country: Myanmar

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Myitnge

Reservoir capacity: 453 m3x106

Construction Dates

Start of Project: 17/00

Start of RCC: 17/00

End of RCC: -/23

End of Project: -/25

Specifications

Height: 160 metres

Length: 244 metres

Volume of RCC: 1700 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Myanmar

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Myitnge

Reservoir capacity: 341 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: 10/25

End of Project: 06/26

Specifications

Height: 102 metres

Length: 266 metres

Volume of RCC: 532 m3x103

Total volume: 580 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  