Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
SuçatiTurkeyHGüredin Creek901/9802/9910/9910/99361925560V(7)0.80(7)0.80(12)30030050100(S)
Akköy ITurkeyHHarsit307/0510/0604/0709/0838144871010.10(1)0.80(1)0.80(12)300300100100(N)
Feke IITurkeyHGöksu6312/0712/0802/1008/10702561942270.07(6)0.80(3')*separate 30030060
60
60
50
(F)
Adnan Mendres (formerly Çine)TurkeyF H I WÇine35012/9511/0404/1010/11137300156016500.10
0.20
(7')0.85(7')0.85(7')30030085
75
105
95
(F)
ŞirnakTurkeyHOrtasui18- /0811/0908/1009/10671981572310.10(1)0.80(1)0.80(12)3006001250(-) -
GüllübagTurkeyHÇoruh2105/0902/1106/1102/127297160175V(1)0.50
0.70
(1)
(1)
0.70(12)3003007070(F)
MengeTurkeyHGöksu5105/0908/1010/1112/11683043493840.25(1)0.80(3')0.80(12)3003008040(F)
SefaköyTurkeyHAras21- /08- /10- /1110/1155148120  (1) (1)       
SilopiTurkeyH WHezil2908/08- /10- /1102/12893567187520.10(7)0.70(3')*0.70(1)3003008139(-) -
BalkusanTurkeyHBalkusan15- /09- /10- /11- /12481896076V(1)0.75(1)*0.75(12)30012007550 
KöprüTurkeyHGöksu9807/0912/1004/12- /131094139751050V
0.60
(1)
(1)
0.80(1)0.80(12)3003008545(F)
GökkayaTurkeyHGöksu1802/1007/1005/1207/1269118961220.067(1)0.80(1)0.80(11)3003005555(F)
DevecikonagiTurkeyH IEmet605/1003/1109/1201/13393131802100.10(2)0.75(1)0.80(12)3003008040(F)
Akköy II (Aladereçam)TurkeyHKaraovacik14- /0705/1109/12- /1360260226306V(1)0.80(1)0.80(12)3003008585(N)
ÇetintepeTurkeyHRobozik4409/08- /11- /12- /133917360640.10(1)0.80(1)*0.80(12)30012007763(N)
NarasTurkeyF IManavgat104- /1012/1201/1405/14784486206770.15(1)0.80(1)*0.80(12)30030011090(N)
AslandagTurkeyH I WBembo1109/0811/1102/1411/14692101622020.10(1)0.80(1)*0.80(12)300120010080(N)
YalnızardıçTurkeyHGöksu109- /09- /11- /14- /15113300490            
KayabeyiTurkeyH IKura14801/10- /12- /1402/15159230637780       300   
MamakTurkeyFBağ1- /13- /13- /14- /143111830            
OguzlarTurkeyHOrtasu2009/08- /13- /14- /15534313924600.10(1)0.80(1)*0.80(12)3006001000(-) -
MusatepeTurkeyHRobozik1309/08- /13- /14- /15661651311380.10(1)0.80(3')0.80(12)30012007763(N)
KarakuzTurkeyHKökün5- /12- /13- /14- /1545162400            
Adigüzel IITurkeyHBüyük Menderes 15- /12- /13- /14- /1561145150            
AyvaliTurkeyHOltu30804/1102/1302/1510/1517740516501900V(3')0.75(3')*0.75(12)30030050
100
110
120
(F)
Kotanli II
[A-G]
TurkeyHKura2010/1205/1404/1511/15702502482520.15(3)0.70(3')0.70(12)30030085130(N)
BurçTurkeyHGöksu6301/0701/12- /15- /17702352322600.07(8)0.80(1)separate 3003006050 to  60(F)
KasimlarTurkeyHAyvalı43- /12- /13- /15- /1690235330            
Güneysinir AlanözüTurkeyIYangılı3- /13- /14- /15- /153827071            
Sariveliler GöktepeTurkeyIGelenalan1- /13- /14- /15- /153933069         600(-) -
Bergama ÇamavluTurkeyIHasanderesi1- /14- /14- /15- /154024169 0.10(1)0.80(1)  3003008535(F)
Yukari (Upper) KaleköTurkeyHMurat78406/1206/1409/1604/18150516222424140.25(7)0.80(1)  3003009040(M)
AkçakocaTurkeyI WSarma201/1305/1510/16- /1766148851300.10(1)0.80(1)0.80(12)300    
ArdilTurkeyIArdil1103/1305/1412/1602/1754266108158V(1)0.80(1)*0.80(12)3006007575 
KargiTurkeyHSakarya50- /11- /1512/1606/1795270535            
UludereTurkeyHOrtasu17- /08- /12- /16- /18774318008870.10(1)0.80(1)  3003009545(N)
Kirazlı KöprüTurkeyH IGökırmak66- /99- /13- /16- /1773280330 0.10(1)0.90(1)  300 7550(F)
BeyyurduTurkeyHBembo809/08- /13- /16- /17781761862090.10(1)0.80(1)0.80(12)300120010080(N)
KelebekTurkeyI WKelebek23- /12- /14- /16- /176219374970.10(1)0.80(1)0.80(12)300300120 (F)
Güdül KırkkavakTurkeyI WOrmanlik1- /14- /15- /1610/1749265114            
Nazilli İsabeyliTurkeyIİsabeyli Deresi1- /14- /15- /16- /174214870            
Oltu SivridereTurkeyILimontozu1- /14- /15- /16- /174663269            
KarareisTurkeyWCamibogazi10- /14- /15- /16- /17502951421730.05(3')0.80(3')0.80(12)3003009852(F)
Köroglu Kotanli 1
[A-G]
TurkeyHKura7303/1506/1502/1704/17100404640680V(3')0.60(3')*0.60(12)30030085130(N)
ÜniversiteTurkeyWÇırçıp1- /15- /16- /17- /173611020            
IncirTurkeyHBuyuk Cay - /13- /16- /17- /18150              
ErganiTurkeyIGolkum15- /14- /16- /17- /18542291271610.10(1)0.80(1)0.80(12)300 9060(F)
Çamoluk AlısızTurkeyIAlısızın Deresi1- /16- /16- /17- /18238314 V 0.70 0.70      
BalliTurkeyHOrtasu6- /08- /14- /18- /2051188144 0.10(1)0.80(1)0.70(3')3003009545(N)
KavsaktepeTurkeyIRobozik1609/08- /14- /18- /20762685185400.10(1)0.80(1)*0.80(1)3003009545(N)
Cudi-CircipTurkeyICircip2- /16- /17- /18- /193021348590.10(1)0.80(1)0.80(12)30012009852 
Yeşilvadi (Beylerderesi)TurkeyIBeyler5- /16- /17- /18- /1939249170 V(1)1.00(1)  3303309362(F)
NarliTurkeyHGöksu27- /16- /17- /18- /19471534968 (14) (14)  3003006550(F)
MelenTurkeyH I WMelen693- /1306/1503/1905/19124944187120960.15(3')0.70(3')*0.70(3')3003009060(F)
Taşköprü HasanlıTurkeyI WAyvali98806/1404/1708/1911/194315737460.10(1)0.80(1)  300 6644(F)
Tasköprü ÇayTurkeyI WUludere103/1707/1809/1908/205212255 0.10(1)0.80(1)  300 7550 
Karamürsel IhsaniyeTurkeyI WSuludere903/1607/1709/1910/19692121301850.10(1)0.80(1)  3003007545(F)
Asagi (Lower) KaleköyTurkeyHMurat55603/13- /15- /2004/21125346119213420.25(7)0.80(3)separate 3003009040(M)
BallikayaTurkeyWMudurnu143- /13- /15- /20- /2398357800 0.10
0.35
(1)0.70(1)  30030063
83
63
83
 
DereçatiTurkeyIBüyükdere2- /16- /18- /20- /2151174110            
Gürsöğüt 1TurkeyHSakarya77- /19- /19- /20- /2067135207            
Gürsöğüt 2TurkeyHSakarya10- /19- /19- /20- /2156275262            
Gümüshane BahçecikTurkeyWŞenkale Deresi306/1711/18- /21- /2267273148 0.10(1)0.80(1)*  300300  (N)
DavarlıTurkeyIKara Creek1- /16- /19- /21- /233911934            
Gürün ÇamlıcaTurkeyIKırkgöz Creek1- /17- /19- /21- /232814228 0.10 0.80   300 8032 
SalipazanTurkeyI WDegimendere16- /17- /20- /21- /2289396430            
KapiçayTurkeyH IBasgöz5- /14- /18- /22- /2450136126 V(1)0.80(1)  300 8456 
KağızmanTurkeyI WKötek22- /16- /19- /22- /2469163180 0.10(1)0.80(1)       
Ulus EldeşTurkeyI WKarakuz Creek1- /16- /20- /22- /234612538 V
0.10
(1)
(1)
0.80(1)  300 8368(F)
HaciömerTurkeyISay4- /18- /20- /22- /235017394 V(1)0.80(1)       
ÇalıcaalanTurkeyIGök Creek1- /15- /20- /22- /243319550            
TersunTurkeyITersun9- /16- /20- /22- /2454273205 0.05(1)0.80(1)       
UluhanTurkeyIGök Creek1- /17- /20- /22- /243122830            
KızlaryoluTurkeyH IDevrez115- /17- /20- /22- /2392261447            
Manavgat ÇardakTurkeyH ISağırın Çayı8- /17- /21- /22- /244418564            
Yozgat (Akdagmadeni) BahçecikTurkeyIGökdelen33- /15- /18- /23- /2470494614 V(1)0.80(1)  300 8456(F)
Göle DurançamTurkeyIKür Çayı37- /16- /19- /23- /242210722 V 0.70        
Akçali-2TurkeyISagin1- /16- /19- /23- /2440148 720.10(1)0.70(1)*0.70(12)3003009060(F)
Akçali-1TurkeyISağın Creek3- /16- /19- /23- /2443291120 0.10(1)0.80(1)*0.80(12)300300  (F)
GündüzlerTurkeyIDegirmen8- /16- /19- /23- /2465 280 V(1)0.75(1)  30030011337(F)
BahçecikTurkeyW 3- /16- /19- /23- /2469 204            
UzundereTurkeyIUzun Creek1- /16- /20- /23- /24425935            
AldegirmenTurkeyI WAkasya24- /17- /20- /23- /2459227 189V(1)0.80(1)*0.80(12)3003005545(F)
Akçakoca AltunçayTurkeyIKilsuyu Creek1- /18- /20- /23- /243395             
InandikTurkeyIInandik3104/18- /20- /23- /2463343271 0.15(1)0.80(1)  300 8080 
ZimariTurkeyWZimari2- /18- /21- /23- /2437126 80           
ÜzengiliTurkeyIBüyük Creek1- /18- /21- /23- /245015794 0.10(1)0.80(1)       
GölecikTurkeyI WGölecik3612/1602/2106/24- /2495424 900V(3')0.80(3')*0.80(12)3003007248(F)
Tekke KavakliTurkeyI WÇat2- /19- /22- /24- /2542325225            
Ula ÇıtlıkTurkeyIBüyükdere1- /17- /22- /24- /262912530            
SarıçayTurkeyWSançay67- /20- /22- /26- /271254411163            

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Güredin Creek

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: 01/98

Start of RCC: 01/98

End of RCC: 10/99

End of Project: 10/99

Specifications

Height: 36 metres

Length: 192 metres

Volume of RCC: 55 m3x103

Total volume: 60 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels
Downstream
SlopeType
0.80RCC against precast concrete panels
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
100Ground-granulated blast-furnace slag
  
Suçati completed
Suçati completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Harsit

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 07/05

Start of RCC: 07/05

End of RCC: 04/07

End of Project: 09/08

Specifications

Height: 38 metres

Length: 144 metres

Volume of RCC: 87 m3x103

Total volume: 101 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
100Natural pozzolan (ASTM Class N)
  
Akköy I completed
Akköy I completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 12/07

Start of RCC: 12/07

End of RCC: 02/10

End of Project: 08/10

Specifications

Height: 70 metres

Length: 256 metres

Volume of RCC: 194 m3x103

Total volume: 227 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.07Traditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
60
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
50 
Feke II completed
Feke II completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Çine

Reservoir capacity: 350 m3x106

Construction Dates

Start of Project: 12/95

Start of RCC: 12/95

End of RCC: 04/10

End of Project: 10/11

Specifications

Height: 137 metres

Length: 300 metres

Volume of RCC: 1560 m3x103

Total volume: 1650 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10RCC against precast concrete panels (GEVR/GE-RCC)
0.20 
Downstream
SlopeType
0.85RCC against precast concrete panels (GEVR/GE-RCC)
Spillway
SlopeType
0.85RCC against precast concrete panels (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
75
Pozzolan (kg/m3)Pozzolan Type
105Low-lime flyash (ASTM Class F)
95 
Adnan Mendres (formerly Çine) completed
Adnan Mendres (formerly Çine) completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ortasui

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 08/10

End of Project: 09/10

Specifications

Height: 67 metres

Length: 198 metres

Volume of RCC: 157 m3x103

Total volume: 231 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
125
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Şirnak completed
Şirnak completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Çoruh

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: 05/09

Start of RCC: 05/09

End of RCC: 06/11

End of Project: 02/12

Specifications

Height: 72 metres

Length: 97 metres

Volume of RCC: 160 m3x103

Total volume: 175 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.50Traditional concrete against formwork
0.70Traditional concrete against formwork
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
70Low-lime flyash (ASTM Class F)
  
Güllübag completed
Güllübag completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 51 m3x106

Construction Dates

Start of Project: 05/09

Start of RCC: 05/09

End of RCC: 10/11

End of Project: 12/11

Specifications

Height: 68 metres

Length: 304 metres

Volume of RCC: 349 m3x103

Total volume: 384 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25Traditional concrete against formwork
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
40Low-lime flyash (ASTM Class F)
  
Menge completed
Menge completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Aras

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: 10/11

Specifications

Height: 55 metres

Length: 148 metres

Volume of RCC: 120 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sefaköy completed
Sefaköy completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Hezil

Reservoir capacity: 29 m3x106

Construction Dates

Start of Project: 08/08

Start of RCC: 08/08

End of RCC: -/11

End of Project: 02/12

Specifications

Height: 89 metres

Length: 356 metres

Volume of RCC: 718 m3x103

Total volume: 752 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10RCC against precast concrete panels
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
81
Pozzolan (kg/m3)Pozzolan Type
39No pozzolan used  -
  
Silopi on Google Earth
Silopi on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Balkusan

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 48 metres

Length: 189 metres

Volume of RCC: 60 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
50 
  
Balkusan completed
Balkusan completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 98 m3x106

Construction Dates

Start of Project: 07/09

Start of RCC: 07/09

End of RCC: 04/12

End of Project: -/13

Specifications

Height: 109 metres

Length: 413 metres

Volume of RCC: 975 m3x103

Total volume: 1050 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.60Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
45Low-lime flyash (ASTM Class F)
  
Köprü completed
Köprü completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 02/10

Start of RCC: 02/10

End of RCC: 05/12

End of Project: 07/12

Specifications

Height: 69 metres

Length: 118 metres

Volume of RCC: 96 m3x103

Total volume: 122 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.067Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast before RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
55Low-lime flyash (ASTM Class F)
  
Gökkaya completed
Gökkaya completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Emet

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 05/10

Start of RCC: 05/10

End of RCC: 09/12

End of Project: 01/13

Specifications

Height: 39 metres

Length: 313 metres

Volume of RCC: 180 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
40Low-lime flyash (ASTM Class F)
  
Devecikonagi completed
Devecikonagi completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Karaovacik

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: 09/12

End of Project: -/13

Specifications

Height: 60 metres

Length: 260 metres

Volume of RCC: 226 m3x103

Total volume: 306 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
85Natural pozzolan (ASTM Class N)
  
Akköy II (Aladereçam) completed
Akköy II (Aladereçam) completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Robozik

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/12

End of Project: -/13

Specifications

Height: 39 metres

Length: 173 metres

Volume of RCC: 60 m3x103

Total volume: 64 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
77
Pozzolan (kg/m3)Pozzolan Type
63Natural pozzolan (ASTM Class N)
  
Çetintepe completed
Çetintepe completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation

River: Manavgat

Reservoir capacity: 104 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: 01/14

End of Project: 05/14

Specifications

Height: 78 metres

Length: 448 metres

Volume of RCC: 620 m3x103

Total volume: 677 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
Pozzolan (kg/m3)Pozzolan Type
90Natural pozzolan (ASTM Class N)
  
Naras completed
Naras completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Bembo

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: 02/14

End of Project: 11/14

Specifications

Height: 69 metres

Length: 210 metres

Volume of RCC: 162 m3x103

Total volume: 202 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
80Natural pozzolan (ASTM Class N)
  
Aslandag completed
Aslandag completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 109 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/14

End of Project: -/15

Specifications

Height: 113 metres

Length: 300 metres

Volume of RCC: 490 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yalnızardıç completed
Yalnızardıç completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Kura

Reservoir capacity: 148 m3x106

Construction Dates

Start of Project: 01/10

Start of RCC: 01/10

End of RCC: -/14

End of Project: 02/15

Specifications

Height: 159 metres

Length: 230 metres

Volume of RCC: 637 m3x103

Total volume: 780 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
 300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Kayabeyi completed
Kayabeyi completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Bağ

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/14

End of Project: -/14

Specifications

Height: 31 metres

Length: 118 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Mamak completed
Mamak completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ortasu

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/14

End of Project: -/15

Specifications

Height: 53 metres

Length: 431 metres

Volume of RCC: 392 m3x103

Total volume: 460 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Oguzlar completed
Oguzlar completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Robozik

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/14

End of Project: -/15

Specifications

Height: 66 metres

Length: 165 metres

Volume of RCC: 131 m3x103

Total volume: 138 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
77
Pozzolan (kg/m3)Pozzolan Type
63Natural pozzolan (ASTM Class N)
  
Musatepe completed
Musatepe completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Kökün

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/14

End of Project: -/15

Specifications

Height: 45 metres

Length: 162 metres

Volume of RCC: 400 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Karakuz completed
Karakuz completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Büyük Menderes

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/14

End of Project: -/15

Specifications

Height: 61 metres

Length: 145 metres

Volume of RCC: 150 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Adigüzel II completed
Adigüzel II completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Oltu

Reservoir capacity: 308 m3x106

Construction Dates

Start of Project: 04/11

Start of RCC: 04/11

End of RCC: 02/15

End of Project: 10/15

Specifications

Height: 177 metres

Length: 405 metres

Volume of RCC: 1650 m3x103

Total volume: 1900 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
100
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
120 
Ayvali completed
Ayvali completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower

River: Kura

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 10/12

Start of RCC: 10/12

End of RCC: 04/15

End of Project: 11/15

Specifications

Height: 70 metres

Length: 250 metres

Volume of RCC: 248 m3x103

Total volume: 252 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15RCC against formwork
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
Kotanli II completed
Kotanli II completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 01/07

Start of RCC: 01/07

End of RCC: -/15

End of Project: -/17

Specifications

Height: 70 metres

Length: 235 metres

Volume of RCC: 232 m3x103

Total volume: 260 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.07RCC against precast concrete panels with geomembrane
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
50  toLow-lime flyash (ASTM Class F)
  
Burç completed
Burç completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ayvalı

Reservoir capacity: 43 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/15

End of Project: -/16

Specifications

Height: 90 metres

Length: 235 metres

Volume of RCC: 330 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Kasimlar completed
Kasimlar completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Yangılı

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/15

End of Project: -/15

Specifications

Height: 38 metres

Length: 270 metres

Volume of RCC: 71 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Güneysinir Alanözü completed
Güneysinir Alanözü completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Gelenalan

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/15

End of Project: -/15

Specifications

Height: 39 metres

Length: 330 metres

Volume of RCC: 69 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Sariveliler Göktepe completed
Sariveliler Göktepe completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Hasanderesi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/15

End of Project: -/15

Specifications

Height: 40 metres

Length: 241 metres

Volume of RCC: 69 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
35Low-lime flyash (ASTM Class F)
  
Bergama Çamavlu completed
Bergama Çamavlu completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 784 m3x106

Construction Dates

Start of Project: 06/12

Start of RCC: 06/12

End of RCC: 09/16

End of Project: 04/18

Specifications

Height: 150 metres

Length: 516 metres

Volume of RCC: 2224 m3x103

Total volume: 2414 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
40Milled sand
  
Yukari (Upper) Kalekö under construction
Yukari (Upper) Kalekö under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Sarma

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 01/13

Start of RCC: 01/13

End of RCC: 10/16

End of Project: -/17

Specifications

Height: 66 metres

Length: 148 metres

Volume of RCC: 85 m3x103

Total volume: 130 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Akçakoca completed
Akçakoca completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Ardil

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 03/13

Start of RCC: 03/13

End of RCC: 12/16

End of Project: 02/17

Specifications

Height: 54 metres

Length: 266 metres

Volume of RCC: 108 m3x103

Total volume: 158 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
75 
  
Ardil completed
Ardil completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Sakarya

Reservoir capacity: 50 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: 12/16

End of Project: 06/17

Specifications

Height: 95 metres

Length: 270 metres

Volume of RCC: 535 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Kargi completed
Kargi completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ortasu

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/16

End of Project: -/18

Specifications

Height: 77 metres

Length: 431 metres

Volume of RCC: 800 m3x103

Total volume: 887 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
45Natural pozzolan (ASTM Class N)
  
Uludere completed
Uludere completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Gökırmak

Reservoir capacity: 66 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/16

End of Project: -/17

Specifications

Height: 73 metres

Length: 280 metres

Volume of RCC: 330 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.90Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Kirazlı Köprü completed
Kirazlı Köprü completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bembo

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/16

End of Project: -/17

Specifications

Height: 78 metres

Length: 176 metres

Volume of RCC: 186 m3x103

Total volume: 209 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
80Natural pozzolan (ASTM Class N)
  
Beyyurdu completed
Beyyurdu completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Kelebek

Reservoir capacity: 23 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/16

End of Project: -/17

Specifications

Height: 62 metres

Length: 193 metres

Volume of RCC: 74 m3x103

Total volume: 97 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Kelebek completed
Kelebek completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Ormanlik

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: 10/17

Specifications

Height: 49 metres

Length: 265 metres

Volume of RCC: 114 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Güdül Kırkkavak completed
Güdül Kırkkavak completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: İsabeyli Deresi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 42 metres

Length: 148 metres

Volume of RCC: 70 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nazilli İsabeyli completed
Nazilli İsabeyli completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Limontozu

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 46 metres

Length: 63 metres

Volume of RCC: 269 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Oltu Sivridere completed
Oltu Sivridere completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Camibogazi

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 50 metres

Length: 295 metres

Volume of RCC: 142 m3x103

Total volume: 173 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.05RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
98
Pozzolan (kg/m3)Pozzolan Type
52Low-lime flyash (ASTM Class F)
  
Karareis completed
Karareis completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower

River: Kura

Reservoir capacity: 73 m3x106

Construction Dates

Start of Project: 03/15

Start of RCC: 03/15

End of RCC: 02/17

End of Project: 04/17

Specifications

Height: 100 metres

Length: 404 metres

Volume of RCC: 640 m3x103

Total volume: 680 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.60RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.60Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
Köroglu Kotanli 1 completed
Köroglu Kotanli 1 completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Çırçıp

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/17

End of Project: -/17

Specifications

Height: 36 metres

Length: 110 metres

Volume of RCC: 20 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Üniversite completed
Üniversite completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Buyuk Cay

Reservoir capacity: -

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/17

End of Project: -/18

Specifications

Height: 150 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Golkum

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/17

End of Project: -/18

Specifications

Height: 54 metres

Length: 229 metres

Volume of RCC: 127 m3x103

Total volume: 161 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
  
Ergani completed
Ergani completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Alısızın Deresi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/17

End of Project: -/18

Specifications

Height: 23 metres

Length: 83 metres

Volume of RCC: 14 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.70 
Spillway
SlopeType
0.70 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Çamoluk Alısız completed
Çamoluk Alısız completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ortasu

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/18

End of Project: -/20

Specifications

Height: 51 metres

Length: 188 metres

Volume of RCC: 144 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
45Natural pozzolan (ASTM Class N)
  
Balli completed
Balli completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Robozik

Reservoir capacity: 16 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/18

End of Project: -/20

Specifications

Height: 76 metres

Length: 268 metres

Volume of RCC: 518 m3x103

Total volume: 540 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
45Natural pozzolan (ASTM Class N)
  
Kavsaktepe completed
Kavsaktepe completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Circip

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 30 metres

Length: 213 metres

Volume of RCC: 48 m3x103

Total volume: 59 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
98
Pozzolan (kg/m3)Pozzolan Type
52 
  
Cudi-Circip on Google Earth
Cudi-Circip on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Beyler

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 39 metres

Length: 249 metres

Volume of RCC: 170 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
1.00Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
330330

Cementitious material

Cement (kg/m3)
93
Pozzolan (kg/m3)Pozzolan Type
62Low-lime flyash (ASTM Class F)
  
Yeşilvadi (Beylerderesi) completed
Yeşilvadi (Beylerderesi) completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 47 metres

Length: 153 metres

Volume of RCC: 49 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Slip-formed/extruded facing elements
Downstream
SlopeType
 Slip-formed/extruded facing elements
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Melen

Reservoir capacity: 693 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: 03/19

End of Project: 05/19

Specifications

Height: 124 metres

Length: 944 metres

Volume of RCC: 1871 m3x103

Total volume: 2096 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
  
Melen completed
Melen completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Ayvali

Reservoir capacity: 988 m3x106

Construction Dates

Start of Project: 06/14

Start of RCC: 06/14

End of RCC: 08/19

End of Project: 11/19

Specifications

Height: 43 metres

Length: 157 metres

Volume of RCC: 37 m3x103

Total volume: 46 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
66
Pozzolan (kg/m3)Pozzolan Type
44Low-lime flyash (ASTM Class F)
  
Taşköprü Hasanlı completed
Taşköprü Hasanlı completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Uludere

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/17

Start of RCC: 03/17

End of RCC: 09/19

End of Project: 08/20

Specifications

Height: 52 metres

Length: 122 metres

Volume of RCC: 55 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
50 
  
Tasköprü Çay completed
Tasköprü Çay completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Suludere

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: 03/16

Start of RCC: 03/16

End of RCC: 09/19

End of Project: 10/19

Specifications

Height: 69 metres

Length: 212 metres

Volume of RCC: 130 m3x103

Total volume: 185 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
45Low-lime flyash (ASTM Class F)
  
Karamürsel Ihsaniye completed
Karamürsel Ihsaniye completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 556 m3x106

Construction Dates

Start of Project: 03/13

Start of RCC: 03/13

End of RCC: -/20

End of Project: 04/21

Specifications

Height: 125 metres

Length: 346 metres

Volume of RCC: 1192 m3x103

Total volume: 1342 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against precast concrete panels
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
40Milled sand
  
Asagi (Lower) Kaleköy completed
Asagi (Lower) Kaleköy completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Mudurnu

Reservoir capacity: 143 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/20

End of Project: -/23

Specifications

Height: 98 metres

Length: 357 metres

Volume of RCC: 800 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
0.35 
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
63
83
Pozzolan (kg/m3)Pozzolan Type
63 
83 
Ballikaya completed
Ballikaya completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Büyükdere

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/20

End of Project: -/21

Specifications

Height: 51 metres

Length: 174 metres

Volume of RCC: 110 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dereçati completed
Dereçati completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Sakarya

Reservoir capacity: 77 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/20

End of Project: -/20

Specifications

Height: 67 metres

Length: 135 metres

Volume of RCC: 207 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Gürsöğüt 1 completed
Gürsöğüt 1 completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Sakarya

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/20

End of Project: -/21

Specifications

Height: 56 metres

Length: 275 metres

Volume of RCC: 262 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Gürsöğüt 2 completed
Gürsöğüt 2 completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Şenkale Deresi

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 06/17

Start of RCC: 06/17

End of RCC: -/21

End of Project: -/22

Specifications

Height: 67 metres

Length: 273 metres

Volume of RCC: 148 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Natural pozzolan (ASTM Class N)
  
Gümüshane Bahçecik completed
Gümüshane Bahçecik completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Kara Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/21

End of Project: -/23

Specifications

Height: 39 metres

Length: 119 metres

Volume of RCC: 34 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Davarlı under construction
Davarlı under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Kırkgöz Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/21

End of Project: -/23

Specifications

Height: 28 metres

Length: 142 metres

Volume of RCC: 28 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.80 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
32 
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Degimendere

Reservoir capacity: 16 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/21

End of Project: -/22

Specifications

Height: 89 metres

Length: 396 metres

Volume of RCC: 430 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Basgöz

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/22

End of Project: -/24

Specifications

Height: 50 metres

Length: 136 metres

Volume of RCC: 126 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
56 
  
Kapiçay completed
Kapiçay completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Kötek

Reservoir capacity: 22 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/22

End of Project: -/24

Specifications

Height: 69 metres

Length: 163 metres

Volume of RCC: 180 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Karakuz Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/22

End of Project: -/23

Specifications

Height: 46 metres

Length: 125 metres

Volume of RCC: 38 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
83
Pozzolan (kg/m3)Pozzolan Type
68Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Say

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/22

End of Project: -/23

Specifications

Height: 50 metres

Length: 173 metres

Volume of RCC: 94 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Gök Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/22

End of Project: -/24

Specifications

Height: 33 metres

Length: 195 metres

Volume of RCC: 50 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Tersun

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/22

End of Project: -/24

Specifications

Height: 54 metres

Length: 273 metres

Volume of RCC: 205 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.05Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tersun completed
Tersun completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Gök Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/22

End of Project: -/24

Specifications

Height: 31 metres

Length: 228 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Devrez

Reservoir capacity: 115 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/22

End of Project: -/23

Specifications

Height: 92 metres

Length: 261 metres

Volume of RCC: 447 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Kızlaryolu under construction
Kızlaryolu under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Sağırın Çayı

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/22

End of Project: -/24

Specifications

Height: 44 metres

Length: 185 metres

Volume of RCC: 64 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Gökdelen

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/23

End of Project: -/24

Specifications

Height: 70 metres

Length: 494 metres

Volume of RCC: 614 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
56Low-lime flyash (ASTM Class F)
  
Yozgat (Akdagmadeni) Bahçecik under construction
Yozgat (Akdagmadeni) Bahçecik under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Kür Çayı

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 22 metres

Length: 107 metres

Volume of RCC: 22 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.70 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Sagin

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 40 metres

Length: 148 metres

Volume of RCC: -

Total volume: 72 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
  
Akçali-2 under construction
Akçali-2 under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Sağın Creek

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 43 metres

Length: 291 metres

Volume of RCC: 120 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Degirmen

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 65 metres

Length: -

Volume of RCC: 280 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
113
Pozzolan (kg/m3)Pozzolan Type
37Low-lime flyash (ASTM Class F)
  
Gündüzler under construction
Gündüzler under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 69 metres

Length: -

Volume of RCC: 204 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Bahçecik on Google Earth
Bahçecik on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Uzun Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 42 metres

Length: 59 metres

Volume of RCC: 35 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Akasya

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/23

End of Project: -/24

Specifications

Height: 59 metres

Length: 227 metres

Volume of RCC: -

Total volume: 189 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
45Low-lime flyash (ASTM Class F)
  
Aldegirmen on Google Earth
Aldegirmen on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Kilsuyu Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/23

End of Project: -/24

Specifications

Height: 33 metres

Length: 95 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Inandik

Reservoir capacity: 31 m3x106

Construction Dates

Start of Project: 04/18

Start of RCC: 04/18

End of RCC: -/23

End of Project: -/24

Specifications

Height: 63 metres

Length: 343 metres

Volume of RCC: 271 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.15Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
80 
  
Inandik under construction
Inandik under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Zimari

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/23

End of Project: -/24

Specifications

Height: 37 metres

Length: 126 metres

Volume of RCC: -

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Büyük Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/23

End of Project: -/24

Specifications

Height: 50 metres

Length: 157 metres

Volume of RCC: 94 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Gölecik

Reservoir capacity: 36 m3x106

Construction Dates

Start of Project: 12/16

Start of RCC: 12/16

End of RCC: 06/24

End of Project: -/24

Specifications

Height: 95 metres

Length: 424 metres

Volume of RCC: -

Total volume: 900 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
48Low-lime flyash (ASTM Class F)
  
Gölecik completed
Gölecik completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Çat

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/24

End of Project: -/25

Specifications

Height: 42 metres

Length: 325 metres

Volume of RCC: 225 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tekke Kavakli under construction
Tekke Kavakli under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Büyükdere

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/24

End of Project: -/26

Specifications

Height: 29 metres

Length: 125 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Sançay

Reservoir capacity: 67 m3x106

Construction Dates

Start of Project: -/20

Start of RCC: -/20

End of RCC: -/26

End of Project: -/27

Specifications

Height: 125 metres

Length: 441 metres

Volume of RCC: 1163 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sarıçay on Google Earth
Sarıçay on Google Earth

 