| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Spitskop | South Africa | I | Harts | 61 | 05/88 | 09/88 | 06/89 | 11/89 | 15 | 100 | 17 | 36 | V | (1) (15) | 0.70 | (15) | 0.70 | (1)* | 250 | 250 | 91 | 92 | (F) | |
| Amatisteros III | Spain | F | Belén | 1 | - /91 | 09/91 | 12/91 | - /92 | 15 | 75 | 4 | 5 | V | (3) | 0.75 | (3) | 0.75 | (3) | 300 | 300 | 73 | 109 | (F) | |
| Grand Falls spillway | Canada | H | Exploits | 08/96 | 09/96 | 09/96 | 12/96 | 15 | 180 | 7 | 11 | V | (1) | 0.67 | (1)* | 0.67 | (1)* | 200 | 200 | 130 | 75 | (F) | ||
| Nam Leuk spillway | Laos | H | Nam Leuk | 185 | - /98 | - /98 | - /99 | - /00 | 15 | 60 | ||||||||||||||
| Itiquira | Brazil | H | Itiquira | - /00 | - /00 | - /02 | - /02 | 15 | 22 | |||||||||||||||
| Ghatghar (Upper dam) | India | H | Pravara | 6 | 12/01 | 05/03 | 01/04 | 06/04 | 15 | 503 | 35 | 40 | V | (3') | 0.78 | (3')* | 0.78 | (3')* | 300 | 300 | 88 | 132 | (F) | |
| Pedra do Garrafão | Brazil | H | Itabapoana | - /07 | - /07 | - /08 | 05/09 | 15 | 110 | |||||||||||||||
| Ibirama | Brazil | H | 1 | - /09 | - /09 | - /10 | - /10 | 15 | 145 | |||||||||||||||
| Ninho da Águia | Brazil | H | Santo Antônio | 1 | - /09 | - /09 | - /10 | - /10 | 15 | 94 | 14 | V | 0.75 | 0.75 | ||||||||||
| Ahl Lafouim | Morocco | W | 3 | - /09 | - /10 | - /11 | - /12 | 15 | 20 | 24 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | ||||||||
| Laananat | Morocco | W | 1 | - /09 | - /10 | - /11 | - /12 | 15 | 18 | 20 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | ||||||||
| Retiro | Brazil | Sapucai | 18 | - /10 | - /11 | - /12 | 07/13 | 15 | 482 | |||||||||||||||
| Mamoeiro | Brazil | W | 21 | - /10 | - /11 | - /12 | - /13 | 15 | ||||||||||||||||
| Sharab Garod | Iran | I | Sharab Garod | 1 | - /12 | - /14 | - /20 | - /22 | 15 | 75 | 12 | |||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Harts
Reservoir capacity: 61 m3x106
Construction Dates
Start of Project: 05/88
Start of RCC: 05/88
End of RCC: 06/89
End of Project: 11/89
Specifications
Height: 15 metres
Length: 100 metres
Volume of RCC: 17 m3x103
Total volume: 36 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| RCC supported by fill shoulders |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC supported by fill shoulders |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 92 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/91
Start of RCC: -/91
End of RCC: 12/91
End of Project: -/92
Specifications
Height: 15 metres
Length: 75 metres
Volume of RCC: 4 m3x103
Total volume: 5 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: Canada
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Exploits
Reservoir capacity: -
Construction Dates
Start of Project: 08/96
Start of RCC: 08/96
End of RCC: 09/96
End of Project: 12/96
Specifications
Height: 15 metres
Length: 180 metres
Volume of RCC: 7 m3x103
Total volume: 11 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.67 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.67 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 | 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 130 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 75 | Low-lime flyash (ASTM Class F) |

Details
Country: Laos
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Nam Leuk
Reservoir capacity: 185 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/99
End of Project: -/00
Specifications
Height: 15 metres
Length: 60 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Itiquira
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/02
Specifications
Height: 15 metres
Length: -
Volume of RCC: 22 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: India
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Pravara
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 01/04
End of Project: 06/04
Specifications
Height: 15 metres
Length: 503 metres
Volume of RCC: 35 m3x103
Total volume: 40 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 88 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 132 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Itabapoana
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 05/09
Specifications
Height: 15 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: -/10
Specifications
Height: 15 metres
Length: 145 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Santo Antônio
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: -/10
Specifications
Height: 15 metres
Length: 94 metres
Volume of RCC: -
Total volume: 14 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 15 metres
Length: -
Volume of RCC: 20 m3x103
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 15 metres
Length: -
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): unknown
River: Sapucai
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: 07/13
Specifications
Height: 15 metres
Length: 482 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 15 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates