Dam Search Results
- Dimensions
- Height: 33 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Hervás | Spain | W | Hervás | 1 | 01/89 | 03/90 | 09/90 | 10/90 | 33 | 210 | 24 | 43 | 0.15 | (1) | 0.70 | (1)* (5)* | 0.70 | (1) | 300 | 300 | 80 | 155 | (F) | |
Ntimbale | Botswana | W | 26 | 11/04 | 04/06 | 09/06 | 05/07 | 33 | 153 | 30 | ||||||||||||||
North Para | Australia | F | North Para | 1 | 11/06 | 06/07 | 09/07 | - /07 | 33 | 206 | 50 | 50 | V | (3') | (3')* | (3')* | 300 | 300 | 60 | 160 | (F) | |||
Imboulou | Republic of Congo | H | Léfini | 584 | 09/03 | - /08 | - /10 | 05/11 | 33 | 310 | ||||||||||||||
Las Tunas | Argentina | F I W | Las Tunas | 101 | 02/09 | 09/10 | 02/11 | 12/11 | 33 | 259 | 30 | 56 | V | (1) | 200 | 400 | 85 | 25 | (N) | |||||
Taquarembó | Brazil | W | Taquarembó | 05/08 | - /10 | - /19 | - /20 | 33 | 330 | |||||||||||||||
Çalıcaalan | Turkey | I | Gök Creek | 1 | - /15 | - /20 | - /22 | - /24 | 33 | 195 | 50 | |||||||||||||
Akçakoca Altunçay | Turkey | I | Kilsuyu Creek | 1 | - /18 | - /20 | - /23 | - /24 | 33 | 95 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Hervás
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 09/90
End of Project: 10/90
Specifications
Height: 33 metres
Length: 210 metres
Volume of RCC: 24 m3x103
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Traditional concrete against precast concrete panels [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
155 | Low-lime flyash (ASTM Class F) |
Details
Country: Botswana
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 11/04
Start of RCC: 11/04
End of RCC: 09/06
End of Project: 05/07
Specifications
Height: 33 metres
Length: 153 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Australia
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: North Para
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 11/06
Start of RCC: 11/06
End of RCC: 09/07
End of Project: -/07
Specifications
Height: 33 metres
Length: 206 metres
Volume of RCC: 50 m3x103
Total volume: 50 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
160 | Low-lime flyash (ASTM Class F) |
Details
Country: Republic of Congo
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Léfini
Reservoir capacity: 584 m3x106
Construction Dates
Start of Project: 09/03
Start of RCC: 09/03
End of RCC: -/10
End of Project: 05/11
Specifications
Height: 33 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Argentina
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Las Tunas
Reservoir capacity: 101 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 02/11
End of Project: 12/11
Specifications
Height: 33 metres
Length: 259 metres
Volume of RCC: 30 m3x103
Total volume: 56 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
200 | 400 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
25 | Natural pozzolan (ASTM Class N) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Taquarembó
Reservoir capacity: -
Construction Dates
Start of Project: 05/08
Start of RCC: 05/08
End of RCC: -/19
End of Project: -/20
Specifications
Height: 33 metres
Length: 330 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Gök Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/22
End of Project: -/24
Specifications
Height: 33 metres
Length: 195 metres
Volume of RCC: 50 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Kilsuyu Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/23
End of Project: -/24
Specifications
Height: 33 metres
Length: 95 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|