NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Grindstone CanyonUSAWGrindstone209/8505/8607/8610/86424328896V(1)0.75(1)*0.75(1)300300760(-) -
Quail Creek SouthUSAWQuail Creek5002/9003/9005/9008/9042610130150V(1)V
0.85
(1)
(17)
conduit 3003008053(F)
UmariBrazilF I R Wdo Carmo293- /98- /99- /01- /01422308655660 (12)    300300700(-) -
Salto-RSBrazilH  - /07- /07- /09- /0942              
GaribaldiBrazilHCerro Negro296- /10- /11- /1209/1342517264382           
PezziBrazilHdas Antas24- /11- /12- /12- /1342 4480        7619(N)
Serra dos Cavalinhos IIBrazilHdas Antas24- /11- /12- /12- /13421233380        7218(N)
Nazilli İsabeyliTurkeyIİsabeyli Deresi1- /14- /15- /16- /174214870            
UzundereTurkeyIUzun Creek1- /16- /20- /23- /24425935            
Tekke KavakliTurkeyI WÇat2- /19- /22- /24- /2542325225            

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Grindstone

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 09/85

Start of RCC: 09/85

End of RCC: 07/86

End of Project: 10/86

Specifications

Height: 42 metres

Length: 432 metres

Volume of RCC: 88 m3x103

Total volume: 96 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
76
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Grindstone Canyon completed
Grindstone Canyon completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Quail Creek

Reservoir capacity: 50 m3x106

Construction Dates

Start of Project: 02/90

Start of RCC: 02/90

End of RCC: 05/90

End of Project: 08/90

Specifications

Height: 42 metres

Length: 610 metres

Volume of RCC: 130 m3x103

Total volume: 150 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.85Unformed face of RCC
Spillway
SlopeType
conduit 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
53Low-lime flyash (ASTM Class F)
  
Quail Creek South completed
Quail Creek South completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Recreation / Water Supply

River: do Carmo

Reservoir capacity: 293 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/01

End of Project: -/01

Specifications

Height: 42 metres

Length: 2308 metres

Volume of RCC: 655 m3x103

Total volume: 660 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Umari completed
Umari completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/09

Specifications

Height: 42 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Cerro Negro

Reservoir capacity: 296 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: 09/13

Specifications

Height: 42 metres

Length: 517 metres

Volume of RCC: 264 m3x103

Total volume: 382 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Garibaldi completed
Garibaldi completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/12

End of Project: -/13

Specifications

Height: 42 metres

Length: -

Volume of RCC: 44 m3x103

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
76
Pozzolan (kg/m3)Pozzolan Type
19Natural pozzolan (ASTM Class N)
  
Pezzi completed
Pezzi completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/12

End of Project: -/13

Specifications

Height: 42 metres

Length: 123 metres

Volume of RCC: 33 m3x103

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Serra dos Cavalinhos II completed
Serra dos Cavalinhos II completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: İsabeyli Deresi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 42 metres

Length: 148 metres

Volume of RCC: 70 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nazilli İsabeyli completed
Nazilli İsabeyli completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Uzun Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 42 metres

Length: 59 metres

Volume of RCC: 35 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Çat

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/24

End of Project: -/25

Specifications

Height: 42 metres

Length: 325 metres

Volume of RCC: 225 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tekke Kavakli under construction
Tekke Kavakli under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates