Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Wajin [A] | China | H I | Nanxi | 7 | - /94 | - /96 | - /98 | - /99 | 47 | 235 | 240 | |||||||||||||
| Nam Ngum 5 [A] | Laos | H | Nam Ting | 314 | 10/08 | 11/11 | 12/12 | 12/12 | 101 | 235 | 298 | 421 | ||||||||||||
| Burç | Turkey | H | Göksu | 63 | 01/07 | 01/12 | - /15 | - /17 | 70 | 235 | 232 | 260 | 0.07 | (8) | 0.80 | (1) | separate | 300 | 300 | 60 | 50 to 60 | (F) | ||
| Kasimlar | Turkey | H | Ayvalı | 43 | - /12 | - /13 | - /15 | - /16 | 90 | 235 | 330 | |||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Nanxi
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/94
Start of RCC: -/94
End of RCC: -/98
End of Project: -/99
Specifications
Height: 47 metres
Length: 235 metres
Volume of RCC: -
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

Details
Country: Laos
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Nam Ting
Reservoir capacity: 314 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 12/12
End of Project: 12/12
Specifications
Height: 101 metres
Length: 235 metres
Volume of RCC: 298 m3x103
Total volume: 421 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/15
End of Project: -/17
Specifications
Height: 70 metres
Length: 235 metres
Volume of RCC: 232 m3x103
Total volume: 260 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
| 0.07 | RCC against precast concrete panels with geomembrane | 
Downstream
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork | 
Spillway
| Slope | Type | 
|---|---|
| separate | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 60 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 50 to | Low-lime flyash (ASTM Class F) | 

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Ayvalı
Reservoir capacity: 43 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 90 metres
Length: 235 metres
Volume of RCC: 330 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates