SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
KintaMalaysiaWKinta3001/0302/0403/0607/0690792952975V(3')0.80(3')*0.80(3')*300300100100(F)
Ulu Sepri (formerly Batu Hampar)MalaysiaWBatu Hampar311/0710/0904/1005/1065236200203 (3') (10) (10)300120065120(F)
BengohMalaysiaWSungai Bengoh14406/0706/0905/10- /1263267130172V(3')0.80(3')*0.80(3')*300300060120(F)
MurumMalaysiaHMurum1204310/0805/1007/13- /1514644015201660V
0.20
(3')
(3')
0.70
0.80
(3)0.70
0.80
 300300088
65
88
72
(F)
Ulu Jelai/SusuMalaysiaHBertam, Telom and Lemoi1803/1103/1409/1507/1690513731747V(4')0.80(3')*0.80(1)*4002400100
95
0
0
(-) -

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Malaysia

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Kinta

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 01/03

Start of RCC: 01/03

End of RCC: 03/06

End of Project: 07/06

Specifications

Height: 90 metres

Length: 792 metres

Volume of RCC: 952 m3x103

Total volume: 975 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Kinta completed
Kinta completed

Full Dam Information

Details

Country: Malaysia

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Batu Hampar

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 11/07

Start of RCC: 11/07

End of RCC: 04/10

End of Project: 05/10

Specifications

Height: 65 metres

Length: 236 metres

Volume of RCC: 200 m3x103

Total volume: 203 m3x103

Construction Methods

Facings

Upstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against precast concrete blocks
Spillway
SlopeType
 RCC against precast concrete blocks

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Ulu Sepri (formerly Batu Hampar) completed
Ulu Sepri (formerly Batu Hampar) completed

Full Dam Information

Details

Country: Malaysia

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Sungai Bengoh

Reservoir capacity: 144 m3x106

Construction Dates

Start of Project: 06/07

Start of RCC: 06/07

End of RCC: 05/10

End of Project: -/12

Specifications

Height: 63 metres

Length: 267 metres

Volume of RCC: 130 m3x103

Total volume: 172 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Bengoh completed
Bengoh completed

Full Dam Information

Details

Country: Malaysia

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Murum

Reservoir capacity: 12043 m3x106

Construction Dates

Start of Project: 10/08

Start of RCC: 10/08

End of RCC: 07/13

End of Project: -/15

Specifications

Height: 146 metres

Length: 440 metres

Volume of RCC: 1520 m3x103

Total volume: 1660 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.20RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork
0.80 
Spillway
SlopeType
0.70 
0.80 

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
88
65
Pozzolan (kg/m3)Pozzolan Type
88Low-lime flyash (ASTM Class F)
72 
Murum completed
Murum completed

Full Dam Information

Details

Country: Malaysia

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bertam, Telom and Lemoi

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 03/11

Start of RCC: 03/11

End of RCC: 09/15

End of Project: 07/16

Specifications

Height: 90 metres

Length: 513 metres

Volume of RCC: 731 m3x103

Total volume: 747 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
4002400

Cementitious material

Cement (kg/m3)
100
95
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
0 
Ulu Jelai/Susu completed
Ulu Jelai/Susu completed

 

Search again