Dam Search Results
- Dimensions
- Height: 88 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Tongjiezi (with Niurixigou saddle dam) | China | F H I N | Dadu | 200 | 01/85 | 10/88 | 12/89 | 10/94 | 88 | 284 | 407 | 855 | V | (1) | 0.75 | (10) | 0.75 | (1) | 300 - 500 | 300 - 500 | 79 82 | 79 83 | (F) | |
Daxia | China | H I | Quan | 20 | - /04 | - /05 | - /06 | - /07 | 88 | 160 | 205 | |||||||||||||
Zaoshi | China | F H N W | Dieshui | 1439 | - /04 | - /05 | - /06 | - /07 | 88 | 351 | 450 | 930 | V 0.25 | (3') | 0.80 | (3') | 0.75 | (1) | 300 | 3000 | 53 83 | 99 102 | (F) | |
Trung Son | Vietnam | F H | Ma | 349 | 11/12 | 04/14 | 08/16 | 02/17 | 88 | 498 | 770 | 1140 | V 0.35 | (3') (3')* | 0.65 | (3')* | 0.65 | (12) | 300 | 300 | 60 70 | 140 150 | (N) | |
Ximihe | China | H I W | Ximihe | 17 | - /14 | - /16 | - /17 | - /18 | 88 | 147 | ||||||||||||||
Monti Nieddu (Sa Stria) | Italy | I W | Monti Nieddu | 35 | 01/98 | 01/18 | - /24 | - /25 | 88 | 360 | 333 | 449 | 0.05 | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | 90 | 55 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Dadu
Reservoir capacity: 200 m3x106
Construction Dates
Start of Project: 01/85
Start of RCC: 01/85
End of RCC: 12/89
End of Project: 10/94
Specifications
Height: 88 metres
Length: 284 metres
Volume of RCC: 407 m3x103
Total volume: 855 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 - | 300 - |
500 | 500 |
Cementitious material
Cement (kg/m3) |
---|
79 |
82 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
79 | Low-lime flyash (ASTM Class F) |
83 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Quan
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 160 metres
Volume of RCC: -
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Dieshui
Reservoir capacity: 1439 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 351 metres
Volume of RCC: 450 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.25 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
53 |
83 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
99 | Low-lime flyash (ASTM Class F) |
102 |
Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Ma
Reservoir capacity: 349 m3x106
Construction Dates
Start of Project: 11/12
Start of RCC: 11/12
End of RCC: 08/16
End of Project: 02/17
Specifications
Height: 88 metres
Length: 498 metres
Volume of RCC: 770 m3x103
Total volume: 1140 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.35 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
Slope | Type |
---|---|
0.65 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.65 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
140 | Natural pozzolan (ASTM Class N) |
150 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Ximihe
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 88 metres
Length: 147 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Italy
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Monti Nieddu
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/98
Start of RCC: 01/98
End of RCC: -/24
End of Project: -/25
Specifications
Height: 88 metres
Length: 360 metres
Volume of RCC: 333 m3x103
Total volume: 449 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.05 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
55 | Low-lime flyash (ASTM Class F) |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates