Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
HattabaraJapanF WAshida6008/88- /89- /9203/9885325228500V
0.20
(1)
(1)
0.75(1)0.75(1)150 -
200
7508436(F)
ShinmiyagawaJapanIMiya1003/9407/9708/0003/0369325393480V(1)0.83(1)0.83(1)2507509139(F)
Lower Russei ChrumCambodiaHRussei Chrum62- /11- /12- /13- /1459325170            
Tekke KavakliTurkeyI WÇat2- /19- /22- /24- /2542325225            

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Water Supply

River: Ashida

Reservoir capacity: 60 m3x106

Construction Dates

Start of Project: 08/88

Start of RCC: 08/88

End of RCC: -/92

End of Project: 03/98

Specifications

Height: 85 metres

Length: 325 metres

Volume of RCC: 228 m3x103

Total volume: 500 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
150  -750
200 

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Hattabara completed
Hattabara completed

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Miya

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 03/94

Start of RCC: 03/94

End of RCC: 08/00

End of Project: 03/03

Specifications

Height: 69 metres

Length: 325 metres

Volume of RCC: 393 m3x103

Total volume: 480 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.83Traditional concrete against formwork
Spillway
SlopeType
0.83Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Shinmiyagawa completed
Shinmiyagawa completed

Full Dam Information

Details

Country: Cambodia

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Russei Chrum

Reservoir capacity: 62 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/13

End of Project: -/14

Specifications

Height: 59 metres

Length: 325 metres

Volume of RCC: 170 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lower Russei Chrum completed
Lower Russei Chrum completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Çat

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/24

End of Project: -/25

Specifications

Height: 42 metres

Length: 325 metres

Volume of RCC: 225 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tekke Kavakli under construction
Tekke Kavakli under construction

 

Search again