SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Sabigawa (lower dam)JapanHKosabi 1110/8603/9012/9111/921042734005900.10(1)0.80(1)0.80(1)2507509139(F)
João BorgesBrazilHCaneiras - /12- /12- /1311/1324273             
Arenal I-II
[A-G]
HondurasHYaguala7201/1804/1911/2001/21932732493050.04(3')0.40
0.67
(3')
(3')
0.40(13)     
Gümüshane BahçecikTurkeyWŞenkale Deresi306/1711/18- /21- /2267273148 0.10(1)0.80(1)*  300300  (N)
TersunTurkeyITersun9- /16- /20- /22- /2454273205 0.05(1)0.80(1)       

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Kosabi

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 10/86

Start of RCC: 10/86

End of RCC: 12/91

End of Project: 11/92

Specifications

Height: 104 metres

Length: 273 metres

Volume of RCC: 400 m3x103

Total volume: 590 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Sabigawa (lower dam) completed
Sabigawa (lower dam) completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Caneiras

Reservoir capacity: -

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/13

End of Project: 11/13

Specifications

Height: 24 metres

Length: 273 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
João Borges completed
João Borges completed

Full Dam Information

Details

Country: Honduras

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower

River: Yaguala

Reservoir capacity: 72 m3x106

Construction Dates

Start of Project: 01/18

Start of RCC: 01/18

End of RCC: 11/20

End of Project: 01/21

Specifications

Height: 93 metres

Length: 273 metres

Volume of RCC: 249 m3x103

Total volume: 305 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.04RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.40RCC against formwork (GEVR/GE-RCC)
0.67RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.40Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Arenal I-II completed
Arenal I-II completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Şenkale Deresi

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 06/17

Start of RCC: 06/17

End of RCC: -/21

End of Project: -/22

Specifications

Height: 67 metres

Length: 273 metres

Volume of RCC: 148 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Natural pozzolan (ASTM Class N)
  
Gümüshane Bahçecik completed
Gümüshane Bahçecik completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Tersun

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/22

End of Project: -/24

Specifications

Height: 54 metres

Length: 273 metres

Volume of RCC: 205 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.05Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tersun completed
Tersun completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates