Dam Search Results
- Total Volume: 170 m3x103
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Peñas Blancas | Costa Rica | H | Peñas Blancas | 2 | 04/00 | 07/01 | 01/02 | 07/02 | 48 | 211 | 120 | 170 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 90 | 35 | (N) | |
Teesta low dam (Stage IV) | India | H | Teesta | 37 | 05/06 | 01/13 | 05/15 | 08/16 | 45 | 196 | 167 | 170 | 0.40 | (3')* | 0.80 | (3')* | separate | 300 | 300 | 85 | 135 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Costa Rica
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Peñas Blancas
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 04/00
Start of RCC: 04/00
End of RCC: 01/02
End of Project: 07/02
Specifications
Height: 48 metres
Length: 211 metres
Volume of RCC: 120 m3x103
Total volume: 170 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
35 | Natural pozzolan (ASTM Class N) |
Details
Country: India
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Teesta
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: 05/15
End of Project: 08/16
Specifications
Height: 45 metres
Length: 196 metres
Volume of RCC: 167 m3x103
Total volume: 170 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.40 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
135 | Low-lime flyash (ASTM Class F) |
Search again