Dam Search Results
- Dimensions
- Height: 43 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Cadiangullong | Australia | W | Cadiangullong Creek | 4 | 11/96 | 05/97 | 12/97 | 03/98 | 43 | 356 | 114 | 123 | V | (3') | 0.75 | (1)* (3')* | 0.75 | (1)* | 300 | 300 | 90 | 90 | (F) | |
Lajeado (Luis Eduardo Magalhães) | Brazil | H | Tocantins | 4982 | 07/98 | 06/01 | 12/01 | 12/02 | 43 | 2100 | 188 | 210 | 300 | 300 | 30 | 40 | (S) | |||||||
Pedrógão | Portugal | F H I | Guadiana | 106 | 08/02 | 02/04 | 08/04 | - /05 | 43 | 448 | 172 | 392 | V | (3') | 0.80 | (3')* | 0.80 | (12)* | 300 | 300 | 55 | 165 | (F) | |
Fundão | Brazil | H | Jordao | 34 | - /04 | - /05 | - /06 | - /07 | 43 | 445 | 200 | 220 | 300 | 300 | 64 | 16 | (N) | |||||||
Taşköprü Hasanlı | Turkey | I W | Ayvali | 988 | 06/14 | 04/17 | 08/19 | 11/19 | 43 | 157 | 37 | 46 | 0.10 | (1) | 0.80 | (1) | 300 | 66 | 44 | (F) | ||||
Akçali-1 | Turkey | I | Sağın Creek | 3 | - /16 | - /19 | - /23 | - /24 | 43 | 291 | 120 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Australia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Cadiangullong Creek
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 12/97
End of Project: 03/98
Specifications
Height: 43 metres
Length: 356 metres
Volume of RCC: 114 m3x103
Total volume: 123 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
90 | Low-lime flyash (ASTM Class F) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 4982 m3x106
Construction Dates
Start of Project: 07/98
Start of RCC: 07/98
End of RCC: 12/01
End of Project: 12/02
Specifications
Height: 43 metres
Length: 2100 metres
Volume of RCC: 188 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
30 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
40 | Ground-granulated blast-furnace slag |
Details
Country: Portugal
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Guadiana
Reservoir capacity: 106 m3x106
Construction Dates
Start of Project: 08/02
Start of RCC: 08/02
End of RCC: 08/04
End of Project: -/05
Specifications
Height: 43 metres
Length: 448 metres
Volume of RCC: 172 m3x103
Total volume: 392 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
165 | Low-lime flyash (ASTM Class F) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Jordao
Reservoir capacity: 34 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 43 metres
Length: 445 metres
Volume of RCC: 200 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ayvali
Reservoir capacity: 988 m3x106
Construction Dates
Start of Project: 06/14
Start of RCC: 06/14
End of RCC: 08/19
End of Project: 11/19
Specifications
Height: 43 metres
Length: 157 metres
Volume of RCC: 37 m3x103
Total volume: 46 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 |
Cementitious material
Cement (kg/m3) |
---|
66 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
44 | Low-lime flyash (ASTM Class F) |
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Sağın Creek
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 43 metres
Length: 291 metres
Volume of RCC: 120 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |