Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Maojiang
[A]
ChinaH IXiang2- /92- /93- /94- /9545150 45          (F)
AtanceSpainISalado3507/9604/9707/9710/97451846575V(3)0.80(3)*0.80(3)*30030057133(F)
Xiao Yangxi (and saddle dam)ChinaWXia Oyangxi1505/0101/0210/0212/02451184749V(3')0.75(3')*0.75(12)3503500138
60
113
90
(F)
XiaoyangxiChinaWXiaoyangxi15- /00- /01- /02- /0345118 49           
PindobaçuBrazilI WItapicuru-aço17- /01- /03- /04- /05451917585      3003005614(N)
Angelina (formerly Portobello - Corredeira do Encano)BrazilHTijucas - /07- /07- /0803/0945178             
KarakuzTurkeyHKökün5- /12- /13- /14- /1545162400            
Teesta low dam (Stage IV)IndiaHTeesta3705/0601/1305/1508/16451961671700.40(3')*0.80(3')*separate 30030085135(F)
DivareshIranI WKharshak3- /13- /15- /21- /2345195             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Xiang

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/95

Specifications

Height: 45 metres

Length: 150 metres

Volume of RCC: -

Total volume: 45 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Salado

Reservoir capacity: 35 m3x106

Construction Dates

Start of Project: 07/96

Start of RCC: 07/96

End of RCC: 07/97

End of Project: 10/97

Specifications

Height: 45 metres

Length: 184 metres

Volume of RCC: 65 m3x103

Total volume: 75 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
57
Pozzolan (kg/m3)Pozzolan Type
133Low-lime flyash (ASTM Class F)
  
Atance completed
Atance completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Xia Oyangxi

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: 05/01

Start of RCC: 05/01

End of RCC: 10/02

End of Project: 12/02

Specifications

Height: 45 metres

Length: 118 metres

Volume of RCC: 47 m3x103

Total volume: 49 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3503500

Cementitious material

Cement (kg/m3)
138
60
Pozzolan (kg/m3)Pozzolan Type
113Low-lime flyash (ASTM Class F)
90 
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Xiaoyangxi

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 45 metres

Length: 118 metres

Volume of RCC: -

Total volume: 49 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Itapicuru-aço

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/04

End of Project: -/05

Specifications

Height: 45 metres

Length: 191 metres

Volume of RCC: 75 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
56
Pozzolan (kg/m3)Pozzolan Type
14Natural pozzolan (ASTM Class N)
  
Pindobaçu completed
Pindobaçu completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Tijucas

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: 03/09

Specifications

Height: 45 metres

Length: 178 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Angelina (formerly Portobello - Corredeira do Encano) under construction
Angelina (formerly Portobello - Corredeira do Encano) under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Kökün

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/14

End of Project: -/15

Specifications

Height: 45 metres

Length: 162 metres

Volume of RCC: 400 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Karakuz completed
Karakuz completed

Full Dam Information

Details

Country: India

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Teesta

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: 05/06

Start of RCC: 05/06

End of RCC: 05/15

End of Project: 08/16

Specifications

Height: 45 metres

Length: 196 metres

Volume of RCC: 167 m3x103

Total volume: 170 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.40RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
135Low-lime flyash (ASTM Class F)
  
Teesta low dam (Stage IV) completed
Teesta low dam (Stage IV) completed

Full Dam Information

Details

Country: Iran

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Kharshak

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/21

End of Project: -/23

Specifications

Height: 45 metres

Length: 195 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Divaresh under construction
Divaresh under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates