Dam Search Results
- Dimensions
- Height: 65 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Ohmatsugawa | Japan | F H W | Matsu | 12 | 07/90 | 10/92 | 06/95 | 09/96 | 65 | 296 | 141 | 294 | V 0.70 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 91 | 39 | (F) | |
Fukuchiyama | Japan | F N W | Fukuti | 3 | 10/98 | - /99 | 12/01 | 03/03 | 65 | 255 | 115 | 201 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) | |
Koyama | Japan | F I W | Ohkita | 17 | 11/94 | 05/00 | 12/02 | 03/05 | 65 | 462 | 270 | 531 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (S) | |
Wanmipo | China | H N | Youshui | 378 | 08/01 | 11/02 | 05/03 | 05/04 | 65 | 238 | 141 | 376 | V | (3') | 0.75 | (12) | ogee | (12) | 300 | 3000 | 86 68 | 103 83 | (F) | |
Saluda dam remediation | USA | H | Saluda | 1970 | 08/02 | 07/03 | 04/05 | 07/05 | 65 | 2439 | 1004 | 1410 | (5) | (5) | 300 | 300 | 89 | 89 | (F) | |||||
Pleikrong | Vietnam | H | Po Ko | 1048 | 11/05 | 02/05 | 12/06 | - /07 | 65 | 495 | 326 | 450 | V | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 80 | 210 | (N) | |
Ulu Sepri (formerly Batu Hampar) | Malaysia | W | Batu Hampar | 3 | 11/07 | 10/09 | 04/10 | 05/10 | 65 | 236 | 200 | 203 | (3') | (10) | (10) | 300 | 1200 | 65 | 120 | (F) | ||||
Zirdan | Iran | I W | Kajoo | 207 | 11/02 | 08/07 | 08/10 | 11/10 | 65 | 350 | 265 | 437 | (5) | (3) | 300 | 300 | 98 | 42 | (N) | |||||
Nam Gnouang (Theun Hinboun Expansion) | Laos | H | Nam Gnouang | 2450 | 10/08 | 03/10 | 12/11 | - /12 | 65 | 480 | 383 | V | (1) | 0.80 | (1) | 1.00 | (12) | 300 | 300 | 90 | 100 | (F) | ||
Okshtuni | Albania | F H | Okshtuni | 7 | 08/15 | 03/17 | 10/17 | 02/18 | 65 | 253 | 141 | 194 | V 0.15 | (12) | 0.90 | (12)* | 0.90 | (12)* | 300 | 300 | 115 | 0 | (-) - | |
Moragahakanda | Sri Lanka | I | Amban Ganga | 521 | 01/07 | - /13 | - /17 | 07/18 | 65 | |||||||||||||||
Nam Kong 3 | Laos | H | Nam Kong | 471 | 11/17 | 03/19 | 02/21 | 11/21 | 65 | 500 | 347 | 400 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 3000 | 75 | 113 | (F) | |
Gündüzler | Turkey | I | Degirmen | 8 | - /16 | - /19 | - /23 | - /24 | 65 | 280 | V | (1) | 0.75 | (1) | 300 | 300 | 113 | 37 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Matsu
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 06/95
End of Project: 09/96
Specifications
Height: 65 metres
Length: 296 metres
Volume of RCC: 141 m3x103
Total volume: 294 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.70 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.76 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Fukuti
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: 12/01
End of Project: 03/03
Specifications
Height: 65 metres
Length: 255 metres
Volume of RCC: 115 m3x103
Total volume: 201 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ohkita
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 11/94
Start of RCC: 11/94
End of RCC: 12/02
End of Project: 03/05
Specifications
Height: 65 metres
Length: 462 metres
Volume of RCC: 270 m3x103
Total volume: 531 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Ground-granulated blast-furnace slag |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Navigation
River: Youshui
Reservoir capacity: 378 m3x106
Construction Dates
Start of Project: 08/01
Start of RCC: 08/01
End of RCC: 05/03
End of Project: 05/04
Specifications
Height: 65 metres
Length: 238 metres
Volume of RCC: 141 m3x103
Total volume: 376 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Spillway
Slope | Type |
---|---|
ogee | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
86 |
68 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
103 | Low-lime flyash (ASTM Class F) |
83 |
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Saluda
Reservoir capacity: 1970 m3x106
Construction Dates
Start of Project: 08/02
Start of RCC: 08/02
End of RCC: 04/05
End of Project: 07/05
Specifications
Height: 65 metres
Length: 2439 metres
Volume of RCC: 1004 m3x103
Total volume: 1410 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
Traditional concrete against precast concrete panels |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
89 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
89 | Low-lime flyash (ASTM Class F) |
Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Po Ko
Reservoir capacity: 1048 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 12/06
End of Project: -/07
Specifications
Height: 65 metres
Length: 495 metres
Volume of RCC: 326 m3x103
Total volume: 450 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
210 | Natural pozzolan (ASTM Class N) |
Details
Country: Malaysia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Batu Hampar
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/07
Start of RCC: 11/07
End of RCC: 04/10
End of Project: 05/10
Specifications
Height: 65 metres
Length: 236 metres
Volume of RCC: 200 m3x103
Total volume: 203 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
RCC against precast concrete blocks |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |
Details
Country: Iran
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kajoo
Reservoir capacity: 207 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: 08/10
End of Project: 11/10
Specifications
Height: 65 metres
Length: 350 metres
Volume of RCC: 265 m3x103
Total volume: 437 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
RCC against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
98 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
42 | Natural pozzolan (ASTM Class N) |
Details
Country: Laos
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Nam Gnouang
Reservoir capacity: 2450 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 12/11
End of Project: -/12
Specifications
Height: 65 metres
Length: 480 metres
Volume of RCC: 383 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
1.00 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |
Details
Country: Albania
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Okshtuni
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 08/15
Start of RCC: 08/15
End of RCC: 10/17
End of Project: 02/18
Specifications
Height: 65 metres
Length: 253 metres
Volume of RCC: 141 m3x103
Total volume: 194 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast after RCC placement |
0.15 |
Downstream
Slope | Type |
---|---|
0.90 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
Slope | Type |
---|---|
0.90 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
115 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Sri Lanka
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Amban Ganga
Reservoir capacity: 521 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/17
End of Project: 07/18
Specifications
Height: 65 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Laos
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Nam Kong
Reservoir capacity: 471 m3x106
Construction Dates
Start of Project: 11/17
Start of RCC: 11/17
End of RCC: 02/21
End of Project: 11/21
Specifications
Height: 65 metres
Length: 500 metres
Volume of RCC: 347 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
113 | Low-lime flyash (ASTM Class F) |
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Degirmen
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 65 metres
Length: -
Volume of RCC: 280 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
113 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
37 | Low-lime flyash (ASTM Class F) |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates