Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Petit Saut | French Guyana | H | Sinnamary | 3500 | 07/89 | 07/92 | 02/93 | 05/94 | 48 | 740 | 250 | 410 | V | (11) | V 0.80 | (7) (16) | 0.80 | (13) | 300 | 300 | 120 | (R) | ||
Nacaome | Honduras | W | Rio Grande Nacaome | 42 | 06/93 | 08/94 | - /95 | - /95 | 54 | 320 | 250 | 300 | 0.15 | (2) | 0.80 | (3)* | 0.80 | (12)* | 400 | 400 | 64 | 21 | (N) | |
Tannur | Jordan | I | Wadi al Hasa | 17 | 02/99 | 12/99 | 12/00 | 09/01 | 60 | 270 | 250 | 250 | V 1.00 | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 1200 | 125 120 | 75 50 | (N) | |
Cerro del Águila | Peru | H | Mantaro | 37 | 11/12 | 08/14 | 06/15 | - /16 | 89 | 270 | 250 | 450 | 0.10 | (1) | 0.75 | (1)* | 0.75 | (12) | 300 | 600 | 115 | 23 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: French Guyana
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Sinnamary
Reservoir capacity: 3500 m3x106
Construction Dates
Start of Project: 07/89
Start of RCC: 07/89
End of RCC: 02/93
End of Project: 05/94
Specifications
Height: 48 metres
Length: 740 metres
Volume of RCC: 250 m3x103
Total volume: 410 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels |
0.80 | Mechanically compacted unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | ROLAC (mixture of flyash and slag with or without limestone fines) |
Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Rio Grande Nacaome
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 06/93
Start of RCC: 06/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 54 metres
Length: 320 metres
Volume of RCC: 250 m3x103
Total volume: 300 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
21 | Natural pozzolan (ASTM Class N) |
Details
Country: Jordan
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Wadi al Hasa
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 02/99
Start of RCC: 02/99
End of RCC: 12/00
End of Project: 09/01
Specifications
Height: 60 metres
Length: 270 metres
Volume of RCC: 250 m3x103
Total volume: 250 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
1.00 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
125 |
120 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
75 | Natural pozzolan (ASTM Class N) |
50 |
Details
Country: Peru
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Mantaro
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 11/12
Start of RCC: 11/12
End of RCC: 06/15
End of Project: -/16
Specifications
Height: 89 metres
Length: 270 metres
Volume of RCC: 250 m3x103
Total volume: 450 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 600 |
Cementitious material
Cement (kg/m3) |
---|
115 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
23 | |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates