← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Freeman diversion | USA | G | Santa Clara | 03/90 | 07/90 | 09/90 | - /91 | 17 | 366 | 101 | 110 | V | (1) | 0.80 | (17) | 0.80 | (17) | 300 | 300 | 125 | 83 | (F) | ||
Thornlea | South Africa | I | Mlazi | 3 | 06/90 | 10/90 | 12/90 | 02/91 | 17 | 135 | 16 | 17 | V | (1) | 0.90 | (3)* | 0.90 | (1) | 170 | 170 | 38 | 87 | (S) | |
Nickajack Auxillary Spillway | USA | H | Tennessee | 311 | 08/89 | 07/90 | 02/91 | 04/92 | 17 | 427 | 79 | 79 | 0.25 | (3)* | 0.60 | (3)* | 0.60 | (3)* | 300 | 600 | 85 | 119 | (F) | |
Paxton | South Africa | I | Tsorwo | 1 | - /90 | 01/91 | 12/92 | - /92 | 17 | 70 | 3 | 3 | V | (3) | V 0.50 | (3) | 0.50 | (3) | 150 | 150 | 70 | 100 | (F) | |
Antacoto | Peru | Mantaro | 120 | - /98 | - /98 | - /99 | - /99 | 17 | (-) - | |||||||||||||||
Mangla Emergency Spillway Control Weir | Pakistan | H I | Jhelum | 6500 | 08/04 | 12/07 | 11/08 | 01/09 | 17 | 370 | 54 | 79 | V 0.30 | (3') (3')* | V 0.70 | (3') (3')* | 0.70 | (3')* | 300 | 300 | 60 | 120 | (S) | |
Sinop | Brazil | H | Teles Pires | - /14 | - /15 | - /17 | - /19 | 17 | ||||||||||||||||
Priest Rapids Right Embankment | USA | H | Columbia | 11/19 | - /21 | - /23 | - /23 | 17 | 564 | 46 | V | (3') | V 0.75 | (3') (17) | none | 300 | 300 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Groundwater Recharge
River: Santa Clara
Reservoir capacity: -
Construction Dates
Start of Project: 03/90
Start of RCC: 03/90
End of RCC: 09/90
End of Project: -/91
Specifications
Height: 17 metres
Length: 366 metres
Volume of RCC: 101 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.80 | Unformed face of RCC |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
125 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
83 | Low-lime flyash (ASTM Class F) |
Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Mlazi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 12/90
End of Project: 02/91
Specifications
Height: 17 metres
Length: 135 metres
Volume of RCC: 16 m3x103
Total volume: 17 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.90 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.90 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
170 | 170 |
Cementitious material
Cement (kg/m3) |
---|
38 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
87 | Ground-granulated blast-furnace slag |
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Tennessee
Reservoir capacity: 311 m3x106
Construction Dates
Start of Project: 08/89
Start of RCC: 08/89
End of RCC: 02/91
End of Project: 04/92
Specifications
Height: 17 metres
Length: 427 metres
Volume of RCC: 79 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.25 | RCC against formwork [stepped face] |
Downstream
Slope | Type |
---|---|
0.60 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.60 | RCC against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 600 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
119 | Low-lime flyash (ASTM Class F) |
Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Tsorwo
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/90
Start of RCC: -/90
End of RCC: 12/92
End of Project: -/92
Specifications
Height: 17 metres
Length: 70 metres
Volume of RCC: 3 m3x103
Total volume: 3 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
0.50 |
Spillway
Slope | Type |
---|---|
0.50 | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
150 | 150 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |
Details
Country: Peru
Owner: -
Type: Gravity
Purpose(s): unknown
River: Mantaro
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/99
End of Project: -/99
Specifications
Height: 17 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
No pozzolan used - | |
Details
Country: Pakistan
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Jhelum
Reservoir capacity: 6500 m3x106
Construction Dates
Start of Project: 08/04
Start of RCC: 08/04
End of RCC: 11/08
End of Project: 01/09
Specifications
Height: 17 metres
Length: 370 metres
Volume of RCC: 54 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.30 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Ground-granulated blast-furnace slag |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Teles Pires
Reservoir capacity: -
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/19
Specifications
Height: 17 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Columbia
Reservoir capacity: -
Construction Dates
Start of Project: 11/19
Start of RCC: 11/19
End of RCC: -/23
End of Project: -/23
Specifications
Height: 17 metres
Length: 564 metres
Volume of RCC: 46 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.75 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
none |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates