Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Silin | China | F H I N | Wujiang | 1593 | 11/05 | 11/06 | 03/08 | - /09 | 117 | 310 | 825 | 1100 | V | (1) | 0.70 | (1) | 0.70 | (1) | 66 89 | 100 109 | (F) | |||
Boussiaba | Algeria | W | Boussiaba | 120 | 12/06 | 05/08 | 11/08 | 08/09 | 51 | 310 | 160 | 190 | V | (2) | (1) | (1) | 300 | 300 | 112 | 28 | (F) | |||
Imboulou | Republic of Congo | H | Léfini | 584 | 09/03 | - /08 | - /10 | 05/11 | 33 | 310 | ||||||||||||||
Wangjiazhou | China | Tuoxi | 21 | - /16 | - /18 | - /20 | - /21 | 62 | 310 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Wujiang
Reservoir capacity: 1593 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 03/08
End of Project: -/09
Specifications
Height: 117 metres
Length: 310 metres
Volume of RCC: 825 m3x103
Total volume: 1100 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
66 |
89 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |
109 |
Details
Country: Algeria
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Boussiaba
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: 11/08
End of Project: 08/09
Specifications
Height: 51 metres
Length: 310 metres
Volume of RCC: 160 m3x103
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
112 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
28 | Low-lime flyash (ASTM Class F) |
Details
Country: Republic of Congo
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Léfini
Reservoir capacity: 584 m3x106
Construction Dates
Start of Project: 09/03
Start of RCC: 09/03
End of RCC: -/10
End of Project: 05/11
Specifications
Height: 33 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Tuoxi
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 62 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates